* Country: UK  
 
* Country: UK  
 
* Location: west of Shetland
 
* Location: west of Shetland
* Production start:  
+
* Production start: 2018
 
* Partners: Shell, ConocoPhillips and Chevron
 
* Partners: Shell, ConocoPhillips and Chevron
 
* Type: Oil / Gas
 
* Type: Oil / Gas
Line 11: Line 11:
 
+++ Description
 
+++ Description
 
* Clair Ridge is a £4.5bn development announced by BP and its coventurers ConocoPhillips, Chevron, and Shell in October 2011. It is an extension of the giant [[Clair Oil Field]]
 
* Clair Ridge is a £4.5bn development announced by BP and its coventurers ConocoPhillips, Chevron, and Shell in October 2011. It is an extension of the giant [[Clair Oil Field]]
* It is expected to come onstream in 2016 and produce up to 120,000 barrels of oil per day at peak.
+
* Two new, bridge-linked platforms and oil and gas export pipelines were constructed as part of the Clair Ridge project. The new pipes were:
 +
** A 5.5-kilometre, 22-inch oil export pipeline tying into the Clair Phase 1 export pipeline.
 +
** A 14.6-kilometre, six-inch gas export pipeline tying Clair Ridge into the [[West Of Shetlands Gas Pipeline System]]
 +
* It came onstream in 2018 and will produce up to 120,000 barrels of oil per day at peak.
 
* The Clair Ridge development, is the first sanctioned large-scale offshore enhanced oil recovery (EOR) scheme using reduced salinity water injection (LoSal® EOR).
 
* The Clair Ridge development, is the first sanctioned large-scale offshore enhanced oil recovery (EOR) scheme using reduced salinity water injection (LoSal® EOR).
 
* Oil and Gas are to be transported from Clair Ridge to [[Sullom Voe Oil Terminal]]
 
* Oil and Gas are to be transported from Clair Ridge to [[Sullom Voe Oil Terminal]]
Line 31: Line 34:
 
* 2012 - BP announces reduced salinity water injection project
 
* 2012 - BP announces reduced salinity water injection project
 
* 2013 - Clair Ridge Jackets Safely Installed
 
* 2013 - Clair Ridge Jackets Safely Installed
 +
* 2018 - First oil produced
  
 
+++ Geology
 
+++ Geology
Line 46: Line 50:
 
# [http://killajoules.wikidot.com/blog:4447 New Clair Ridge Jackets Safely Installed West Of Shetland]
 
# [http://killajoules.wikidot.com/blog:4447 New Clair Ridge Jackets Safely Installed West Of Shetland]
 
# [http://killajoules.wikidot.com/blog:5970 Global Marine lands Subsea 7 contract]
 
# [http://killajoules.wikidot.com/blog:5970 Global Marine lands Subsea 7 contract]
 +
# [https://abarrelfull.blogspot.com/2023/05/bp-starts-up-clair-ridge-production.html
 +
 +
[[category:Field]]
 +
[[category:UK]]
 +
[[category:BP]]

Revision as of 07:59, 15 May 2023

Summary Information

  • Operator: BP
  • Country: UK
  • Location: west of Shetland
  • Production start: 2018
  • Partners: Shell, ConocoPhillips and Chevron
  • Type: Oil / Gas
  • Estimated Reserves: 640 million barrels of recoverable oil
  • Production Volume:

+++ Description

  • Clair Ridge is a £4.5bn development announced by BP and its coventurers ConocoPhillips, Chevron, and Shell in October 2011. It is an extension of the giant Clair Oil Field
  • Two new, bridge-linked platforms and oil and gas export pipelines were constructed as part of the Clair Ridge project. The new pipes were:
    • A 5.5-kilometre, 22-inch oil export pipeline tying into the Clair Phase 1 export pipeline.
    • A 14.6-kilometre, six-inch gas export pipeline tying Clair Ridge into the West Of Shetlands Gas Pipeline System
  • It came onstream in 2018 and will produce up to 120,000 barrels of oil per day at peak.
  • The Clair Ridge development, is the first sanctioned large-scale offshore enhanced oil recovery (EOR) scheme using reduced salinity water injection (LoSal® EOR).
  • Oil and Gas are to be transported from Clair Ridge to Sullom Voe Oil Terminal

+++ Contractors

  • **AMEC:**
    • Detailed engineering and project management services for the construction and installation phase of two new bridge linked platforms. This includes detail design, follow-on engineering, site support, plus procurement, supply chain services, materials management and information management services for the whole project
    • Hook up and commissioning services (HUC) for the two Clair Ridge platforms
  • **Kvaerner:** Drilling & Production Jacket and Piles, Quarters Utility Jacket and Piles
  • **Subsea 7:** project management, engineering, procurement, fabrication and installation of a 6km 22” oil export pipeline and a 14km 6” gas export pipeline connected to the new production facilities and existing Clair Phase 1 export systems
  • **Hyundai Heavy Industries:** Construction of platform topsides
  • **Global Marine:** Submarine fibre optic link between platforms

+++ History

  • 2011 - BP Confirms Extension of Giant Clair Field
  • 2011 - The Government gave BP and its partners Shell, ConocoPhillips and Chevron consent for the project
  • 2011 - AMEC awarded EPMS for the main platform design
  • 2012 - Subsea 7 awarded pipeline contract
  • 2012 - BP announces reduced salinity water injection project
  • 2013 - Clair Ridge Jackets Safely Installed
  • 2018 - First oil produced

+++ Geology

+++ Links

  1. Foundocean Subsea References
  2. Kvaerner Platform References
  3. BP Confirms Extension of Giant Clair Field West of Shetland in the UK
  4. Consent given for £4.5 billion Clair Ridge development
  5. AMEC awarded £150 million Clair Ridge design engineering, North Sea
  6. Subsea 7 awarded contract, West of Shetland
  7. BP Technology Boosts Oil Recovery Adding To Potential Energy Supplies
  8. AMEC awarded £68 million Clair Ridge hook up contract, North Sea
  9. New Clair Ridge Jackets Safely Installed West Of Shetland
  10. Global Marine lands Subsea 7 contract
  11. [https://abarrelfull.blogspot.com/2023/05/bp-starts-up-clair-ridge-production.html