Difference between revisions of "Surmont Oil Sands Project"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "Summary Information * Operator: Conoco * Country: Canada * Location: 60 kilometers southeast of Fort McMurray in Alberta * Production start: * Partners: Conoco - 50%, Total...")
 
Line 30: Line 30:
 
* 2008 - Bantrel was awarded front-end engineering activities (FEL-3) for Surmont Phase 2
 
* 2008 - Bantrel was awarded front-end engineering activities (FEL-3) for Surmont Phase 2
 
* 2010 - Bantrel was awarded the EPC phase for Surmont Phase 2
 
* 2010 - Bantrel was awarded the EPC phase for Surmont Phase 2
 +
* 2023 - Suncor acquired Total's stake
  
 
+++ Geology
 
+++ Geology
Line 40: Line 41:
 
# [http://killajoules.wikidot.com/archive:surmont-project-enters-commercial-production Surmont Project Enters Commercial Production]
 
# [http://killajoules.wikidot.com/archive:surmont-project-enters-commercial-production Surmont Project Enters Commercial Production]
 
# [http://www.bantrel.com/surmont-2-project ConocoPhillips Surmont Phase 2 Project, Bantrell]
 
# [http://www.bantrel.com/surmont-2-project ConocoPhillips Surmont Phase 2 Project, Bantrell]
 +
# [https://a-barrel-full.blogspot.com/2023/04/suncor-energy-to-acquire-totalenergies.html Suncor Energy to Acquire TotalEnergies' Canadian Operations for $5.5 Billion, Plus Additional Potential Payments up to an Aggregate Maximum of $600 Million]
 +
 +
[[category:Field]]
 +
[[category:Canada]]
 +
[[category:ConocoPhillips]]
 +
[[category:Suncor]]

Revision as of 14:38, 27 April 2023

Summary Information

  • Operator: Conoco
  • Country: Canada
  • Location: 60 kilometers southeast of Fort McMurray in Alberta
  • Production start:
  • Partners: Conoco - 50%, Total - 50%
  • Type: Oil / Gas
  • Estimated Reserves:
  • Production Volume: 26,000

+++ Description

  • A Steam Assisted Gravity Drainage project

+++ Contractors ++++ Surmont Phase 2

  • **Bantrel:**
* Front-end engineering activities (FEL-3)
* Engineering Procurement & Construction
  • **Aker Solutions:**
* Slop Oil Treater Package
* 2 FWKO Vessels c/w insulation; platform; sample box; sample tubing & sample cooler - 13 ID x 60
* 2 Treater Vessels c/w insulation; platform; sample tubing; sample cooler & sample box 13 ID x 80


+++ History

  • 1997 - The initial Surmont pilot project began
  • 2003 - The joint venture decided to launch the first phase of commercial development
  • 2005 - Total increased its stake to 50%
  • 2007 - Surmont Project Enters Commercial Production
  • 2008 - Bantrel was awarded front-end engineering activities (FEL-3) for Surmont Phase 2
  • 2010 - Bantrel was awarded the EPC phase for Surmont Phase 2
  • 2023 - Suncor acquired Total's stake

+++ Geology

+++ Links

  1. [[[Aker Solutions Oil And Gas Processing References]]]
  2. IMV Projects Awarded Surmont Development Study by ConocoPhillips Canada
  3. Canada : Total increases its share in the Surmont oil sands leases to 50 %
  4. Surmont Project Enters Commercial Production
  5. ConocoPhillips Surmont Phase 2 Project, Bantrell
  6. Suncor Energy to Acquire TotalEnergies' Canadian Operations for $5.5 Billion, Plus Additional Potential Payments up to an Aggregate Maximum of $600 Million