Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: Conoco * Country: Canada * Location: 60 kilometers southeast of Fort McMurray in Alberta * Production start: * Partners: Conoco - 50%, Total...") |
Abarrelfull (talk | contribs) |
||
Line 30: | Line 30: | ||
* 2008 - Bantrel was awarded front-end engineering activities (FEL-3) for Surmont Phase 2 | * 2008 - Bantrel was awarded front-end engineering activities (FEL-3) for Surmont Phase 2 | ||
* 2010 - Bantrel was awarded the EPC phase for Surmont Phase 2 | * 2010 - Bantrel was awarded the EPC phase for Surmont Phase 2 | ||
+ | * 2023 - Suncor acquired Total's stake | ||
+++ Geology | +++ Geology | ||
Line 40: | Line 41: | ||
# [http://killajoules.wikidot.com/archive:surmont-project-enters-commercial-production Surmont Project Enters Commercial Production] | # [http://killajoules.wikidot.com/archive:surmont-project-enters-commercial-production Surmont Project Enters Commercial Production] | ||
# [http://www.bantrel.com/surmont-2-project ConocoPhillips Surmont Phase 2 Project, Bantrell] | # [http://www.bantrel.com/surmont-2-project ConocoPhillips Surmont Phase 2 Project, Bantrell] | ||
+ | # [https://a-barrel-full.blogspot.com/2023/04/suncor-energy-to-acquire-totalenergies.html Suncor Energy to Acquire TotalEnergies' Canadian Operations for $5.5 Billion, Plus Additional Potential Payments up to an Aggregate Maximum of $600 Million] | ||
+ | |||
+ | [[category:Field]] | ||
+ | [[category:Canada]] | ||
+ | [[category:ConocoPhillips]] | ||
+ | [[category:Suncor]] |
Revision as of 14:38, 27 April 2023
Summary Information
- Operator: Conoco
- Country: Canada
- Location: 60 kilometers southeast of Fort McMurray in Alberta
- Production start:
- Partners: Conoco - 50%, Total - 50%
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume: 26,000
+++ Description
- A Steam Assisted Gravity Drainage project
+++ Contractors ++++ Surmont Phase 2
- **Bantrel:**
* Front-end engineering activities (FEL-3) * Engineering Procurement & Construction
- **Aker Solutions:**
* Slop Oil Treater Package * 2 FWKO Vessels c/w insulation; platform; sample box; sample tubing & sample cooler - 13 ID x 60 * 2 Treater Vessels c/w insulation; platform; sample tubing; sample cooler & sample box 13 ID x 80
+++ History
- 1997 - The initial Surmont pilot project began
- 2003 - The joint venture decided to launch the first phase of commercial development
- 2005 - Total increased its stake to 50%
- 2007 - Surmont Project Enters Commercial Production
- 2008 - Bantrel was awarded front-end engineering activities (FEL-3) for Surmont Phase 2
- 2010 - Bantrel was awarded the EPC phase for Surmont Phase 2
- 2023 - Suncor acquired Total's stake
+++ Geology
+++ Links
- [[[Aker Solutions Oil And Gas Processing References]]]
- IMV Projects Awarded Surmont Development Study by ConocoPhillips Canada
- Canada : Total increases its share in the Surmont oil sands leases to 50 %
- Surmont Project Enters Commercial Production
- ConocoPhillips Surmont Phase 2 Project, Bantrell
- Suncor Energy to Acquire TotalEnergies' Canadian Operations for $5.5 Billion, Plus Additional Potential Payments up to an Aggregate Maximum of $600 Million