=== Summary Information ===
 
=== Summary Information ===
 
* Ownership: Pemex
 
* Ownership: Pemex
* Website:
+
* Website: https://www.pemex.com/
* Wiki Page:
+
* Wiki Page: [[Dos Bocas Olmeca Refinery]]
* Location:
+
* Location: Dos Bocas, Tabasco
 
* Capacity: million tons/annum & bbl/day
 
* Capacity: million tons/annum & bbl/day
 
* Nelson Complexity:
 
* Nelson Complexity:
* Project Stage:
+
* Project Stage: Under construction
* Expected Completion: 2020
+
* Expected Completion: 2022
 
* Budget: $10 Billion
 
* Budget: $10 Billion
 +
 
=== The Project ===
 
=== The Project ===
 
* Project Type: Greenfield Refinery
 
* Project Type: Greenfield Refinery
 
* Project Summary:
 
* Project Summary:
 
* Main Contractors
 
* Main Contractors
 +
** Samsung Engineering: Package 2 which includes Diesel Hydrodesulfurization(DHDT) Unit, Gasoil Hydrodesulfurization(HDS) Unit, Naphtha Hydro-treating(NHT) Unit and Naphtha Reformer and Package 3 which includes Fluid Catalytic Cracking (FCC) Unit.
 +
** Larsen & Toubro: Manufacture of coke drums
 
* Licences:
 
* Licences:
=== Refining Units
+
 
* -
+
=== Refining Units ===
 +
* Diesel Hydrodesulphurisation
 +
* Gasoil Hydrodesulphurisation
 +
* Naphtha Hydro-treating
 +
* Naphtha Reformer
 +
* Fluid Catalytic Cracking (FCC) Unit
 +
 
 
=== Terminal Capacity ===
 
=== Terminal Capacity ===
 
* Crude Oil:
 
* Crude Oil:
Line 24: Line 33:
 
* -
 
* -
 
=== History ===
 
=== History ===
 +
* 2019 - Samsung Engineering awarded EPC contract
  
 
=== Other Information ===
 
=== Other Information ===
 
* -
 
* -
  
=== Links ===
+
=== Links ===
* [http://killajoules.wikidot.com/archive:samsung-engineering-awarded-contract-for-pemex-dos-b Samsung Engineering awarded contract for PEMEX Dos Bocas Refinery in Mexico]
+
# [http://killajoules.wikidot.com/archive:samsung-engineering-awarded-contract-for-pemex-dos-b Samsung Engineering awarded contract for PEMEX Dos Bocas Refinery in Mexico]
 +
# [https://abarrelfull.blogspot.com/2022/09/l-dispatches-worlds-largest-coke-drums.html L&T Dispatches World’s Largest Coke Drums to Mexico]
 +
 
 +
[[Category:Refinery]]
 +
[[Category:Mexico]]
 +
[[Category:Pemex]]

Latest revision as of 13:47, 22 April 2023

Summary Information

  • Ownership: Pemex
  • Website: https://www.pemex.com/
  • Wiki Page: Dos Bocas Olmeca Refinery
  • Location: Dos Bocas, Tabasco
  • Capacity: million tons/annum & bbl/day
  • Nelson Complexity:
  • Project Stage: Under construction
  • Expected Completion: 2022
  • Budget: $10 Billion

The Project

  • Project Type: Greenfield Refinery
  • Project Summary:
  • Main Contractors
    • Samsung Engineering: Package 2 which includes Diesel Hydrodesulfurization(DHDT) Unit, Gasoil Hydrodesulfurization(HDS) Unit, Naphtha Hydro-treating(NHT) Unit and Naphtha Reformer and Package 3 which includes Fluid Catalytic Cracking (FCC) Unit.
    • Larsen & Toubro: Manufacture of coke drums
  • Licences:

Refining Units

  • Diesel Hydrodesulphurisation
  • Gasoil Hydrodesulphurisation
  • Naphtha Hydro-treating
  • Naphtha Reformer
  • Fluid Catalytic Cracking (FCC) Unit

Terminal Capacity

  • Crude Oil:
  • Refined Products:

Crude Supply

  • -

Products Produced

  • -

History

  • 2019 - Samsung Engineering awarded EPC contract

Other Information

  • -

Links

  1. Samsung Engineering awarded contract for PEMEX Dos Bocas Refinery in Mexico
  2. L&T Dispatches World’s Largest Coke Drums to Mexico