Dos Bocas Refinery Project
Jump to navigation
Jump to search
Contents
Summary Information
- Ownership: Pemex
- Website: https://www.pemex.com/
- Wiki Page: Dos Bocas Olmeca Refinery
- Location: Dos Bocas, Tabasco
- Capacity: million tons/annum & bbl/day
- Nelson Complexity:
- Project Stage: Under construction
- Expected Completion: 2022
- Budget: $10 Billion
The Project
- Project Type: Greenfield Refinery
- Project Summary:
- Main Contractors
- Samsung Engineering: Package 2 which includes Diesel Hydrodesulfurization(DHDT) Unit, Gasoil Hydrodesulfurization(HDS) Unit, Naphtha Hydro-treating(NHT) Unit and Naphtha Reformer and Package 3 which includes Fluid Catalytic Cracking (FCC) Unit.
- Larsen & Toubro: Manufacture of coke drums
- Licences:
Refining Units
- Diesel Hydrodesulphurisation
- Gasoil Hydrodesulphurisation
- Naphtha Hydro-treating
- Naphtha Reformer
- Fluid Catalytic Cracking (FCC) Unit
Terminal Capacity
- Crude Oil:
- Refined Products:
Crude Supply
- -
Products Produced
- -
History
- 2019 - Samsung Engineering awarded EPC contract
Other Information
- -