=== Summary Information === | === Summary Information === | ||
− | * Operator: | + | * Operator: Mubadala |
− | * Country: | + | * Country: Malaysia |
− | * Location: | + | * Location: Block SK 320 offshore |
− | * Production start: | + | * Production start: 2022 |
− | * Partners: | + | * Partners: Mubadala, Petronas, Shell |
− | * Type: | + | * Type: Gas |
* Estimated Reserves: | * Estimated Reserves: | ||
* Production Volume: | * Production Volume: | ||
Line 11: | Line 11: | ||
=== Description === | === Description === | ||
* The development concept comprises of an Integrated Central Processing Platform (ICPP) consisting of an 8-legged jacket. | * The development concept comprises of an Integrated Central Processing Platform (ICPP) consisting of an 8-legged jacket. | ||
− | The facility is designed for gas throughput of 550 million standard cubic feet of gas per day plus condensate. | + | * The facility is designed for gas throughput of 550 million standard cubic feet of gas per day plus condensate. |
− | The produced fluids are evacuated through a new 38 inch subsea pipeline tying into an existing offshore network and subsequently to the onshore [[Malaysia LNG Terminal| Malaysia LNG plant in Bintulu]]. | + | * The produced fluids are evacuated through a new 38 inch subsea pipeline tying into an existing offshore network and subsequently to the onshore [[Malaysia LNG Terminal| Malaysia LNG plant in Bintulu]]. |
=== Contractors === | === Contractors === | ||
− | * | + | * Sapura Fabrication: Engineering, Procurement, Construction, Installation & Commissioning (EPCIC) |
=== History === | === History === | ||
* 2018 - Final investment decision taken | * 2018 - Final investment decision taken | ||
+ | * 2022 - First gas produced | ||
=== Geology === | === Geology === | ||
Line 25: | Line 26: | ||
=== Links === | === Links === | ||
# [https://abarrelfull.blogspot.com/2023/03/pegaga-gas-development-in-malaysia.html Pegaga Gas Development in Malaysia Approved] | # [https://abarrelfull.blogspot.com/2023/03/pegaga-gas-development-in-malaysia.html Pegaga Gas Development in Malaysia Approved] | ||
− | + | # [https://abarrelfull.blogspot.com/2023/03/pegaga-field-enters-gas-production-phase.html Pegaga Field Enters Gas Production Phase] | |
[[category:Field]] | [[category:Field]] |
Latest revision as of 08:28, 22 March 2023
Summary Information
- Operator: Mubadala
- Country: Malaysia
- Location: Block SK 320 offshore
- Production start: 2022
- Partners: Mubadala, Petronas, Shell
- Type: Gas
- Estimated Reserves:
- Production Volume:
Description
- The development concept comprises of an Integrated Central Processing Platform (ICPP) consisting of an 8-legged jacket.
- The facility is designed for gas throughput of 550 million standard cubic feet of gas per day plus condensate.
- The produced fluids are evacuated through a new 38 inch subsea pipeline tying into an existing offshore network and subsequently to the onshore Malaysia LNG plant in Bintulu.
Contractors
- Sapura Fabrication: Engineering, Procurement, Construction, Installation & Commissioning (EPCIC)
History
- 2018 - Final investment decision taken
- 2022 - First gas produced