Line 22: Line 22:
 
* 1988 - Oil production starts
 
* 1988 - Oil production starts
 
* 2002 - Gas production begins with the completion of the Bream Gas Pipeline
 
* 2002 - Gas production begins with the completion of the Bream Gas Pipeline
 +
* 2022 - Exxon announces its intention to use the field as a CO2 storage facility
  
 
+++ Geology ===
 
+++ Geology ===
Line 31: Line 32:
 
# [http://killajoules.wikidot.com/archive:bhp-billiton-approves-bream-gas-pipeline-in-bass-str BHP Billiton Approves Bream Gas Pipeline in Bass Strait]
 
# [http://killajoules.wikidot.com/archive:bhp-billiton-approves-bream-gas-pipeline-in-bass-str BHP Billiton Approves Bream Gas Pipeline in Bass Strait]
 
# [http://killajoules.wikidot.com/archive:bhp-billiton-announces-commencement-of-bream-pipelin BHP Billiton Announces Commencement of Bream Pipeline]
 
# [http://killajoules.wikidot.com/archive:bhp-billiton-announces-commencement-of-bream-pipelin BHP Billiton Announces Commencement of Bream Pipeline]
 +
# [https://abarrelfull.blogspot.com/2023/01/exxonmobil-begins-design-studies-for.html ExxonMobil begins design studies for South East Australia carbon capture hub in Gippsland]
  
 
[[category:Field]]
 
[[category:Field]]
 
[[category:Australia]]
 
[[category:Australia]]
 
[[category:Woodside]]
 
[[category:Woodside]]
 +
[[category:Exxon]]

Revision as of 18:19, 4 January 2023

Summary Information

  • Operator: Woodside
  • Country: Australia
  • Location: Offshore, Bass Strait
  • Production start: 1988
  • Partners: BHP Billiton / Exxon
  • Type: Oil & Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • The field utilises a two Platforms, the Bream A a steel platform and Bream B, a concrete gravity structure
  • Oil is sent to the Halibut Platform and transfered from there to shore by a subsea pipeline.
  • A 51km gas pipeline runs 46km offshore from the Bream A platform, across the Gippsland coast near Paradise beach and then continues a further 5km onshore to the Longford Gas Conditioning Plant

Contractors

  • **Global Maritime:** Warranty surveyor for launch, tow and installation of two gas pipelines

History

  • 1969 - The Bream oil and gas field was discovered
  • 1988 - Oil production starts
  • 2002 - Gas production begins with the completion of the Bream Gas Pipeline
  • 2022 - Exxon announces its intention to use the field as a CO2 storage facility

+++ Geology ===

Links

  1. Offshore Oil And Gas Production Platforms In Australia
  2. Global Maritime Pipeline References
  3. BHP Billiton Approves Bream Gas Pipeline in Bass Strait
  4. BHP Billiton Announces Commencement of Bream Pipeline
  5. ExxonMobil begins design studies for South East Australia carbon capture hub in Gippsland