Difference between revisions of "Bream Oil and Gas Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: BHP Billiton * Country: Australia * Location: Offshore, Bass Strait * Production start: 1988 * Partners: BHP Billiton / Exxon * Type: Oil & Gas...") |
Abarrelfull (talk | contribs) |
||
Line 1: | Line 1: | ||
− | Summary Information | + | === Summary Information === |
* Operator: BHP Billiton | * Operator: BHP Billiton | ||
* Country: Australia | * Country: Australia | ||
Line 9: | Line 9: | ||
* Production Volume: | * Production Volume: | ||
− | + | === Description === | |
* The field utilises a two Platforms, the Bream A a steel platform and Bream B, a concrete gravity structure | * The field utilises a two Platforms, the Bream A a steel platform and Bream B, a concrete gravity structure | ||
* Oil is sent to the [[[Halibut Fortescue Cobia And Mackerel Oil And Gas Fields | Halibut Platform]]] and transfered from there to shore by a subsea pipeline. | * Oil is sent to the [[[Halibut Fortescue Cobia And Mackerel Oil And Gas Fields | Halibut Platform]]] and transfered from there to shore by a subsea pipeline. | ||
* A 51km gas pipeline runs 46km offshore from the Bream A platform, across the Gippsland coast near Paradise beach and then continues a further 5km onshore to the [[[Longford Gas Conditioning Plant]]] | * A 51km gas pipeline runs 46km offshore from the Bream A platform, across the Gippsland coast near Paradise beach and then continues a further 5km onshore to the [[[Longford Gas Conditioning Plant]]] | ||
− | + | === Contractors === | |
* **Global Maritime:** Warranty surveyor for launch, tow and installation of two gas pipelines | * **Global Maritime:** Warranty surveyor for launch, tow and installation of two gas pipelines | ||
− | + | === History === | |
− | |||
* 1969 - The Bream oil and gas field was discovered | * 1969 - The Bream oil and gas field was discovered | ||
* 1988 - Oil production starts | * 1988 - Oil production starts | ||
* 2002 - Gas production begins with the completion of the Bream Gas Pipeline | * 2002 - Gas production begins with the completion of the Bream Gas Pipeline | ||
− | +++ Geology | + | +++ Geology === |
* | * | ||
− | + | === Links === | |
# [[Offshore Oil And Gas Production Platforms In Australia]] | # [[Offshore Oil And Gas Production Platforms In Australia]] | ||
− | # | + | # [[Global Maritime Pipeline References]] |
# [http://killajoules.wikidot.com/archive:bhp-billiton-approves-bream-gas-pipeline-in-bass-str BHP Billiton Approves Bream Gas Pipeline in Bass Strait] | # [http://killajoules.wikidot.com/archive:bhp-billiton-approves-bream-gas-pipeline-in-bass-str BHP Billiton Approves Bream Gas Pipeline in Bass Strait] | ||
# [http://killajoules.wikidot.com/archive:bhp-billiton-announces-commencement-of-bream-pipelin BHP Billiton Announces Commencement of Bream Pipeline] | # [http://killajoules.wikidot.com/archive:bhp-billiton-announces-commencement-of-bream-pipelin BHP Billiton Announces Commencement of Bream Pipeline] | ||
+ | |||
+ | [[category:Field]] | ||
+ | [[category:Australia]] | ||
+ | [[category:Woodside]] |
Revision as of 17:16, 3 January 2023
Summary Information
- Operator: BHP Billiton
- Country: Australia
- Location: Offshore, Bass Strait
- Production start: 1988
- Partners: BHP Billiton / Exxon
- Type: Oil & Gas
- Estimated Reserves:
- Production Volume:
Description
- The field utilises a two Platforms, the Bream A a steel platform and Bream B, a concrete gravity structure
- Oil is sent to the [[[Halibut Fortescue Cobia And Mackerel Oil And Gas Fields | Halibut Platform]]] and transfered from there to shore by a subsea pipeline.
- A 51km gas pipeline runs 46km offshore from the Bream A platform, across the Gippsland coast near Paradise beach and then continues a further 5km onshore to the [[[Longford Gas Conditioning Plant]]]
Contractors
- **Global Maritime:** Warranty surveyor for launch, tow and installation of two gas pipelines
History
- 1969 - The Bream oil and gas field was discovered
- 1988 - Oil production starts
- 2002 - Gas production begins with the completion of the Bream Gas Pipeline
+++ Geology ===