Difference between revisions of "Sepia Oil Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) (→Links) |
||
Line 35: | Line 35: | ||
# [https://abarrelfull.blogspot.com/2021/12/mcdermott-awarded-epci-contract-by.html McDermott Awarded EPCI Contract by Petrobras for Sepia Field Project] | # [https://abarrelfull.blogspot.com/2021/12/mcdermott-awarded-epci-contract-by.html McDermott Awarded EPCI Contract by Petrobras for Sepia Field Project] | ||
# [https://abarrelfull.blogspot.com/2021/12/modecs-fpso-carioca-mv30-achieves-first.html MODEC’s FPSO Carioca MV30 achieves First Oil and starts 21-Year Time Charter] | # [https://abarrelfull.blogspot.com/2021/12/modecs-fpso-carioca-mv30-achieves-first.html MODEC’s FPSO Carioca MV30 achieves First Oil and starts 21-Year Time Charter] | ||
+ | # [https://a-barrel-full.blogspot.com/2021/12/petronas-wins-sepia-field-in-brazil-bid.html PETRONAS Wins Sépia Field In Brazil Bid Round] | ||
Revision as of 14:15, 21 December 2021
Summary Information
- Operator: Petrobras
- Country: Brazil
- Location: Santos Basin
- Production start: 2021
- Partners:
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
Description
- The Sépia Leste field is at approximately 250 km and the Sépia field 185 km from the coast of Rio de Janeiro state, at a depth of 2,165 meters.
- The permanent development utilises the Carioca FPSO MV30 but an early production system used Cidade de São Vicente FPSO
- A total of 15 wells are planned, but the first phase includes seven-riser wells (3 producers and 4 injector wells)
Contractors
- MODEC: Engineering, procurement, construction, mobilization and installation of the FPSO, including topsides processing equipment as well as hull and marine systems.
- Sofec designed and provided the spread mooring system
- McDermott Detailed engineering, surveys, supply, installation and pre-commissioning of rigid pipelines, jumpers, buoyance modules, strakes and riser monitoring systems for seven-riser wells (3 producers and 4 injector wells) connected to the Carioca FPSO MV30
History
- 2014 - The Sépia field was declared commercially viable
- 2015 - The Sépia Leste field was declared commercially viable
- 2016 - Early production system produces oil for 180 days
- 2017 - Modec awarded FPSO contract
- 2021 - First oil produced
Geology
- The field is located in the pre-salt
Links
- Declaration of the Commercial Viability of the Sépia Leste area, in the pre-salt layer of the Santos Basin
- Early Production System starts up in the Santos Basin's Sepia pre-salt
- Contracting of FPSO for Sepia field
- McDermott Awarded EPCI Contract by Petrobras for Sepia Field Project
- MODEC’s FPSO Carioca MV30 achieves First Oil and starts 21-Year Time Charter
- PETRONAS Wins Sépia Field In Brazil Bid Round