Difference between revisions of "Qingning Natural Gas Pipeline"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "=== Summary Information === * Source: * Destination: * Ownership: ChinaPipeline * Website: * Length: kilometres ( miles) * Capacity: 7.2 BCM / annum * Status: Operatin...")
 
 
(2 intermediate revisions by the same user not shown)
Line 13: Line 13:
  
 
=== History ===
 
=== History ===
* 2020 - The pipleine began operations
+
* 2020 - Ownership transfered from Sinopec to ChinaPipeline
 +
* 2020 - The pipeline began operations
  
 
=== Other Information ===
 
=== Other Information ===
Line 19: Line 20:
  
 
=== Links ===
 
=== Links ===
# []
+
# [https://abarrelfull.blogspot.com/2021/12/qingning-natural-gas-pipeline-completed.html Qingning Natural Gas Pipeline Completed]

Latest revision as of 12:49, 21 December 2021

Summary Information

  • Source:
  • Destination:
  • Ownership: ChinaPipeline
  • Website:
  • Length: kilometres ( miles)
  • Capacity: 7.2 BCM / annum
  • Status: Operating

Details

  • It starts at the Qingdao of Shandong Sinopec LNG receiving station and ends at the Nanjing Gas Transmission Station of the National Pipeline Network Group Sichuan Gas to the East.

History

  • 2020 - Ownership transfered from Sinopec to ChinaPipeline
  • 2020 - The pipeline began operations

Other Information

  • -

Links

  1. Qingning Natural Gas Pipeline Completed