Difference between revisions of "Carioca FPSO MV30"

From A Barrel Full
Jump to navigation Jump to search
 
(One intermediate revision by the same user not shown)
Line 22: Line 22:
  
 
=== History ===
 
=== History ===
 +
* 2017 - Modec awarded FPSO contract
 
* 2021 - First oil produced
 
* 2021 - First oil produced
  
Line 30: Line 31:
 
=== Links ===
 
=== Links ===
  
 +
# [https://abarrelfull.blogspot.com/2021/12/contracting-of-fpso-for-sepia-field.html Contracting of FPSO for Sepia field]
 
# [https://abarrelfull.blogspot.com/2021/12/modecs-fpso-carioca-mv30-achieves-first.html MODEC’s FPSO Carioca MV30 achieves First Oil and starts 21-Year Time Charter]
 
# [https://abarrelfull.blogspot.com/2021/12/modecs-fpso-carioca-mv30-achieves-first.html MODEC’s FPSO Carioca MV30 achieves First Oil and starts 21-Year Time Charter]

Latest revision as of 15:52, 8 December 2021

Summary Information

  • Name: Carioca FPSO MV30
  • Field: Sepia Oil Field
  • Country: Brazil
  • Ownership:
  • Website:
  • Field Operated By: Petrobras
  • Capacity: 180,000 barrels of crude oil per day, 212 million standard cubic feet of gas per day
  • Year of Completion: 2021

Brief Description

  • The FPSO is capable of processing 180,000 barrels of crude oil per day, 212 million standard cubic feet of gas per day, 240,000 barrels of water injection per day and has storage capacity of 1,400,000 barrels of crude oil

Contractors

  • MODEC: Engineering, procurement, construction, mobilization and installation of the FPSO, including topsides processing equipment as well as hull and marine systems.
  • Sofec designed and provided the spread mooring system

Status

  • In operation

History

  • 2017 - Modec awarded FPSO contract
  • 2021 - First oil produced

Other Information

  • -

Links

  1. Contracting of FPSO for Sepia field
  2. MODEC’s FPSO Carioca MV30 achieves First Oil and starts 21-Year Time Charter