=== Summary Information === | === Summary Information === | ||
− | * Ownership: | + | * Ownership: Jawa Satu Regas (JSR) Pertamina, Marubeni and Sojitz |
− | * Website: | + | * Website: https://pertamina.com/ |
− | * Location: | + | * Location: Cilamaya, West Java province, Java Island, Indonesia |
− | * Capacity: million tons/annum | + | * Capacity: 2.4 million tons/annum |
− | * Status: | + | * Status: Commissioning 2021 |
+ | |||
=== Brief Description === | === Brief Description === | ||
− | * The project entails the construction, operation, and maintenance of a 1,760-megawatt (MW) load-following, combined-cycle, gas turbine (CCGT) power plant and associated facilities. | + | * The project entails the construction, operation, and maintenance of a 1,760-megawatt (MW) load-following, combined-cycle, gas turbine (CCGT) power plant and associated facilities. |
+ | * Gas is to be supplied by the Jawa Satu FSRU | ||
+ | * The FSRU will be placed 14km offshore in the Cilamaya Sea, east of Jakarta and connected to the power plant via a pipeline about 21km long. | ||
=== Technical Details === | === Technical Details === | ||
− | * Storage capacity: | + | * Storage capacity: 170,000 M3 |
* Unloading capacity: | * Unloading capacity: | ||
− | * Send out capacity: | + | * Send out capacity: 300 MMscfd |
− | * Constructor: | + | * Constructor: Samsung Engineering made the vessel conversion |
* Licensor: | * Licensor: | ||
+ | |||
=== Ongoing Projects/Project Status === | === Ongoing Projects/Project Status === | ||
Line 21: | Line 25: | ||
=== Suppliers / Customers === | === Suppliers / Customers === | ||
− | * Suppliers: | + | * Suppliers: LNG is to be supplied from BP’s [[Tangguh LNG Terminal]] in West Papua |
− | * Customers: | + | * Customers: The terminal will supply a new power plant |
+ | |||
=== History === | === History === | ||
− | * | + | * 2018 - The Asian development bank approved two loans totalling USD 370 million for the project |
+ | |||
=== Other Information === | === Other Information === | ||
- | - | ||
=== Links === | === Links === | ||
− | #[https://www.adb.org/projects/51112-001/main Asian Development Bank] | + | # [https://www.adb.org/projects/51112-001/main Asian Development Bank] |
+ | # [https://abarrelfull.blogspot.com/2021/03/mol-to-participate-in-construction.html MOL to Participate in Construction, Ownership, Operation of FSRU for Jawa 1 Gas-Fired IPP Project in Indonesia] |
Latest revision as of 16:59, 16 March 2021
Contents
Summary Information
- Ownership: Jawa Satu Regas (JSR) Pertamina, Marubeni and Sojitz
- Website: https://pertamina.com/
- Location: Cilamaya, West Java province, Java Island, Indonesia
- Capacity: 2.4 million tons/annum
- Status: Commissioning 2021
Brief Description
- The project entails the construction, operation, and maintenance of a 1,760-megawatt (MW) load-following, combined-cycle, gas turbine (CCGT) power plant and associated facilities.
- Gas is to be supplied by the Jawa Satu FSRU
- The FSRU will be placed 14km offshore in the Cilamaya Sea, east of Jakarta and connected to the power plant via a pipeline about 21km long.
Technical Details
- Storage capacity: 170,000 M3
- Unloading capacity:
- Send out capacity: 300 MMscfd
- Constructor: Samsung Engineering made the vessel conversion
- Licensor:
Ongoing Projects/Project Status
Suppliers / Customers
- Suppliers: LNG is to be supplied from BP’s Tangguh LNG Terminal in West Papua
- Customers: The terminal will supply a new power plant
History
- 2018 - The Asian development bank approved two loans totalling USD 370 million for the project