Difference between revisions of "Chennai Manali Refinery"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information Ownership: Chennai Petroleum Corporation Limited (CPCL) (IOC) Website: http://www.cpcl.co.in/ List of Indian Oil Company Refineries Location: Manali, Chenn...") |
Abarrelfull (talk | contribs) |
||
| Line 1: | Line 1: | ||
| − | Summary Information | + | === Summary Information === |
| − | Ownership: Chennai Petroleum Corporation Limited (CPCL) (IOC) | + | * Ownership: Chennai Petroleum Corporation Limited (CPCL) (IOC) |
| − | Website: http://www.cpcl.co.in/ | + | * Website: http://www.cpcl.co.in/ |
| − | List of Indian Oil Company Refineries | + | * List of Indian Oil Company Refineries |
| − | Location: Manali, Chennai | + | * Location: Manali, Chennai |
| − | Capacity: 9.5 million tons/annum & 190.000 bbl/day | + | * Capacity: 9.5 million tons/annum & 190.000 bbl/day |
| − | Nelson Complexity: | + | * Nelson Complexity: |
| − | Brief Description | + | === Brief Description === |
| − | The Manali Refinery located at Chennai is a large, complex and integrated refinery | + | * The Manali Refinery located at Chennai is a large, complex and integrated refinery |
| − | Refining Units | + | === Refining Units === |
| − | CDU | + | * CDU |
| − | VDU | + | * VDU |
| − | Thermal Cracker | + | * Thermal Cracker |
| − | Visbreaker | + | * Visbreaker |
| − | Hydro-cracker | + | * Hydro-cracker |
| − | FCC | + | * FCC |
| − | Lubes Unit | + | * Lubes Unit |
| − | Diesel Hydro Desulphurising unit | + | * Diesel Hydro Desulphurising unit |
| − | Sour Water Stripper | + | * Sour Water Stripper |
| − | Amine Treater Unit | + | * Amine Treater Unit |
| − | Amine Recovery Unit | + | * Amine Recovery Unit |
| − | Sulphur Recovery Unit | + | * Sulphur Recovery Unit |
| − | Terminal Capacity | + | === Terminal Capacity === |
| − | Crude Oil: | + | * Crude Oil: |
| − | Refined Products: | + | * Refined Products: |
| − | Crude Supply | + | === Crude Supply === |
| − | This refinery was designed to handle heavy crudes | + | * This refinery was designed to handle heavy crudes |
| − | Products Produced | + | === Products Produced === |
| − | CPCL has developed the capacity to meet Bharat-II and Euro-III equivalent environmental standards | + | * CPCL has developed the capacity to meet Bharat-II and Euro-III equivalent environmental standards |
| − | + | === Projects === | |
| − | + | * The refinery is in the process of adding residuum upgrading capability. | |
| − | The refinery is in the process of adding residuum upgrading capability. | + | * The project involves a delayed coker unit (DCU), a once through hydrocracker revamp, a sulfur recovery unit, a green field coke yard facility, and utilities. |
| − | The project involves a delayed coker unit (DCU), a once through hydrocracker revamp, a sulfur recovery unit, a green field coke yard facility, and utilities. | + | * For full details see [[Chennai Manali Refinery Upgrading Project]] |
| − | Other Information | + | === Other Information === |
- | - | ||
| − | History | + | === History === |
| − | 1969 - Refinery was commissioned by Snamprogetti with 53,000 bpd capacity | + | * 1969 - Refinery was commissioned by Snamprogetti with 53,000 bpd capacity |
| − | 1986 - The refinery capacity was increased to 110,000 bpd and an FCC added | + | * 1986 - The refinery capacity was increased to 110,000 bpd and an FCC added |
| − | 1988 - Asphalt Production Facility started | + | * 1988 - Asphalt Production Facility started |
| − | 1994 - Expansion of Lube Refinery Units | + | * 1994 - Expansion of Lube Refinery Units |
| − | 1997 - Wax Hydrofinishing and Wax Deoiling unit added | + | * 1997 - Wax Hydrofinishing and Wax Deoiling unit added |
| − | 1999 - 1.8 Million TPA DHDS Project commisioned | + | * 1999 - 1.8 Million TPA DHDS Project commisioned |
| − | 2004 - Refinery expanded by 3 mtpa and Visbreaker commissioned | + | * 2004 - Refinery expanded by 3 mtpa and Visbreaker commissioned |
| − | 2004 - FCC Unit Revamped | + | * 2004 - FCC Unit Revamped |
| − | 2011 - Euro - IV Quality | + | * 2011 - Euro - IV Quality Upgrading Project - DHDT and NHT / ISOM units |
| − | + | === Links === | |
# [http://www.cpcl.co.in/business_refineries.htm Refinery Webpage] | # [http://www.cpcl.co.in/business_refineries.htm Refinery Webpage] | ||
# [http://www.punjlloyd.com/gallery_detail.php?id=34&pcid=6 Punjlloyd, Visbreaker Unit and Sulphur Block] | # [http://www.punjlloyd.com/gallery_detail.php?id=34&pcid=6 Punjlloyd, Visbreaker Unit and Sulphur Block] | ||
Revision as of 19:42, 23 March 2020
Contents
Summary Information
- Ownership: Chennai Petroleum Corporation Limited (CPCL) (IOC)
- Website: http://www.cpcl.co.in/
- List of Indian Oil Company Refineries
- Location: Manali, Chennai
- Capacity: 9.5 million tons/annum & 190.000 bbl/day
- Nelson Complexity:
Brief Description
- The Manali Refinery located at Chennai is a large, complex and integrated refinery
Refining Units
- CDU
- VDU
- Thermal Cracker
- Visbreaker
- Hydro-cracker
- FCC
- Lubes Unit
- Diesel Hydro Desulphurising unit
- Sour Water Stripper
- Amine Treater Unit
- Amine Recovery Unit
- Sulphur Recovery Unit
Terminal Capacity
- Crude Oil:
- Refined Products:
Crude Supply
- This refinery was designed to handle heavy crudes
Products Produced
- CPCL has developed the capacity to meet Bharat-II and Euro-III equivalent environmental standards
Projects
- The refinery is in the process of adding residuum upgrading capability.
- The project involves a delayed coker unit (DCU), a once through hydrocracker revamp, a sulfur recovery unit, a green field coke yard facility, and utilities.
- For full details see Chennai Manali Refinery Upgrading Project
Other Information
-
History
- 1969 - Refinery was commissioned by Snamprogetti with 53,000 bpd capacity
- 1986 - The refinery capacity was increased to 110,000 bpd and an FCC added
- 1988 - Asphalt Production Facility started
- 1994 - Expansion of Lube Refinery Units
- 1997 - Wax Hydrofinishing and Wax Deoiling unit added
- 1999 - 1.8 Million TPA DHDS Project commisioned
- 2004 - Refinery expanded by 3 mtpa and Visbreaker commissioned
- 2004 - FCC Unit Revamped
- 2011 - Euro - IV Quality Upgrading Project - DHDT and NHT / ISOM units
Links
- Refinery Webpage
- Punjlloyd, Visbreaker Unit and Sulphur Block
- Engineers India Refining References
- Punj Lloyd Refining References
- Saipem Grass Roots Refineries
- Saipem Atmospheric Crude Distillation Units
- Saipem Asphalt Bitumen Blowing Unit
- Saipem Atmospheric Gasoil Desulphurisation
- Saipem Residue Conversion Units
- Saipem Visbreaking Units
- Saipem Vacuum Distillation Units
- Saipem Vacuum Gasoil Desulphurisation
- Saipem Sulphur Block Units
- Jacobs Receives Contract from Chennai Petroleum Corporation Limited for Manali Refinery