Difference between revisions of "VNIPIneft Refinery Project References"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 27: | Line 27: | ||
** Scope of Work: Basic Design, Authority Engineering and Detailed Design, Procurement, Supervision | ** Scope of Work: Basic Design, Authority Engineering and Detailed Design, Procurement, Supervision | ||
* '''[[Kirishi Refinery]]''' | * '''[[Kirishi Refinery]]''' | ||
− | OOO PO Kirishinefteorgsintez | + | ** OOO PO Kirishinefteorgsintez |
− | Capacity: 4.9 MTA (vacuum distillation), 2.2 MTA (visbreaking) | + | ** Capacity: 4.9 MTA (vacuum distillation), 2.2 MTA (visbreaking) |
− | + | ** Scope of Work: Basic Design Acceptance; Detailed Design, Procurement. | |
− | + | ** Commissioning date: 2009 | |
− | ZAO RNPK Deep Conversion Complex | + | * '''[[Ryazan Refinery]]''' |
− | Capacity: 2.5 MTA | + | ** ZAO RNPK Deep Conversion Complex |
− | + | ** Capacity: 2.5 MTA | |
− | + | ** Scope of Work: Basic Design Acceptance, Authority Engineering and Detailed Design (jointly with CB&I Lummus); Procurement; Supervision. | |
+ | ** Commissioning date: 2005-2006 | ||
OAO TAIF-NK Catalytic Cracking Complex | OAO TAIF-NK Catalytic Cracking Complex | ||
Capacity: 850 kTA | Capacity: 850 kTA |
Revision as of 17:11, 22 March 2020
- Taneco Nizhnekamsk Refinery
- OAO TatneftHydrocrackingComplex, 2.9 MTA – 2014
- Scope of Work: Authority Engineering,Detailed Design, Procurement, Supervision.
- Ryazan Refinery
- ZAO RNPK VGO Hydrocracking Complex,2 MTA – 2014
- Scope of Work: Authority Engineering
- Volgograd Refinery
- OOO LUKOIL-Volgogradneftepererabotka Integrated CDU/VDU, 6 MTA - 2014
- Scope of Work: Authority Engineering and Detailed Design
- Moscow Refinery
- OAO Gazprom Neft – Moscow Refinery Isomerization Unit, 650 kTA – 2013
- OAOVNIPIneftScopeofWork: Basic Design Acceptance, Detailed Design,Supervision
- Moscow Refinery
- OAO Gazprom Neft – Moscow Refinery Diesel Hydrotreating Unit, 320 kTA- 2013
- Scope of Work: Authority Engineering and Detailed Design, Supervision
- Volgograd Refinery
- OOO LUKOIL-Volgogradneftepererabotka Atmospheric – Vacuum Distillation Unit - 2012
- Scope of Work: Authority Engineering
- Angarsk Petrochemical Refinery
- OAO Angarskneftekhimproyekt Diesel Hydrotreating Unit- 2012
- Scope of Work: Authority Engineering
- Moscow Refinery
- OAO Gazprom Neft – Moscow Refinery PSA Unit - 2011
- Scope of Work: Authority Engineering and Detailed Design, Supervision
- Taneco Nizhnekamsk Refinery
- OJSC TANECO CDU/VDU, 7 MTA - 2010
- Scope of Work: Basic Design, Authority Engineering and Detailed Design, Procurement, Supervision
- Kirishi Refinery
- OOO PO Kirishinefteorgsintez
- Capacity: 4.9 MTA (vacuum distillation), 2.2 MTA (visbreaking)
- Scope of Work: Basic Design Acceptance; Detailed Design, Procurement.
- Commissioning date: 2009
- Ryazan Refinery
- ZAO RNPK Deep Conversion Complex
- Capacity: 2.5 MTA
- Scope of Work: Basic Design Acceptance, Authority Engineering and Detailed Design (jointly with CB&I Lummus); Procurement; Supervision.
- Commissioning date: 2005-2006
OAO TAIF-NK Catalytic Cracking Complex Capacity: 850 kTA OAOVNIPIneftScopeofWork: ActingasaGeneralDesigner; BasicDesign(jointly with OAO VNIINP);DetailedDesign; Procurement; Supervision. Commissioningdate: 2005
- Yanos Yaroslavl Refinery
- OAO Slavneft-Yaroslavnefteorgsintez Deep Conversion Complex
- Capacity: 2.1 MTA
- Scope of Work: Basic Design Acceptance, Detailed Design(jointly with Toyo Engineering Corporation); Supervision.
- Commissioning date: 2005
OOO LUKOIL-Permnefteorgsintez VGO Hydrocracking Complex Capacity: 3.5 MTA - Plant OAOVNIPIneftScopeofWork: ActingasaGeneralDesigner; Basic Design Acceptance; DetailedDesign, Procurement, Supervision. Commissioning date: 2004 ZAO RNPK Catalytic Cracking Complex Capacity: 2.5 MTA OAOVNIPIneftScopeofWork: DetailedDesign, Supervision. Commissioning date: 2001