Difference between revisions of "VNIPIneft Refinery Project References"

From A Barrel Full
Jump to navigation Jump to search
Line 27: Line 27:
 
** Scope of Work: Basic Design, Authority Engineering and Detailed Design, Procurement, Supervision
 
** Scope of Work: Basic Design, Authority Engineering and Detailed Design, Procurement, Supervision
 
* '''[[Kirishi Refinery]]'''
 
* '''[[Kirishi Refinery]]'''
OOO PO Kirishinefteorgsintez
+
** OOO PO Kirishinefteorgsintez
Capacity: 4.9 MTA (vacuum distillation), 2.2 MTA (visbreaking)
+
** Capacity: 4.9 MTA (vacuum distillation), 2.2 MTA (visbreaking)
OAOVNIPIneftScopeofWork: Basic Design Acceptance; Detailed Design, Procurement.
+
** Scope of Work: Basic Design Acceptance; Detailed Design, Procurement.
Commissioningdate: 2009
+
** Commissioning date: 2009
ZAO RNPK Deep Conversion Complex
+
* '''[[Ryazan Refinery]]'''
Capacity: 2.5 MTA
+
** ZAO RNPK Deep Conversion Complex
OAOVNIPIneftScopeofWork: BasicDesignAcceptance, AuthorityEngineeringandDetailedDesign(jointlywithCB&ILummus); Procurement; Supervision.
+
** Capacity: 2.5 MTA
Commissioningdate: 2005-2006
+
** Scope of Work: Basic Design Acceptance, Authority Engineering and Detailed Design (jointly with CB&I Lummus); Procurement; Supervision.
 +
** Commissioning date: 2005-2006
 
OAO TAIF-NK Catalytic Cracking Complex
 
OAO TAIF-NK Catalytic Cracking Complex
 
Capacity: 850 kTA
 
Capacity: 850 kTA

Revision as of 17:11, 22 March 2020

  • Taneco Nizhnekamsk Refinery
    • OAO TatneftHydrocrackingComplex, 2.9 MTA – 2014
    • Scope of Work: Authority Engineering,Detailed Design, Procurement, Supervision.
  • Ryazan Refinery
    • ZAO RNPK VGO Hydrocracking Complex,2 MTA – 2014
    • Scope of Work: Authority Engineering
  • Volgograd Refinery
    • OOO LUKOIL-Volgogradneftepererabotka Integrated CDU/VDU, 6 MTA - 2014
    • Scope of Work: Authority Engineering and Detailed Design
  • Moscow Refinery
    • OAO Gazprom Neft – Moscow Refinery Isomerization Unit, 650 kTA – 2013
    • OAOVNIPIneftScopeofWork: Basic Design Acceptance, Detailed Design,Supervision
  • Moscow Refinery
    • OAO Gazprom Neft – Moscow Refinery Diesel Hydrotreating Unit, 320 kTA- 2013
    • Scope of Work: Authority Engineering and Detailed Design, Supervision
  • Volgograd Refinery
    • OOO LUKOIL-Volgogradneftepererabotka Atmospheric – Vacuum Distillation Unit - 2012
    • Scope of Work: Authority Engineering
  • Angarsk Petrochemical Refinery
    • OAO Angarskneftekhimproyekt Diesel Hydrotreating Unit- 2012
    • Scope of Work: Authority Engineering
  • Moscow Refinery
    • OAO Gazprom Neft – Moscow Refinery PSA Unit - 2011
    • Scope of Work: Authority Engineering and Detailed Design, Supervision
  • Taneco Nizhnekamsk Refinery
    • OJSC TANECO CDU/VDU, 7 MTA - 2010
    • Scope of Work: Basic Design, Authority Engineering and Detailed Design, Procurement, Supervision
  • Kirishi Refinery
    • OOO PO Kirishinefteorgsintez
    • Capacity: 4.9 MTA (vacuum distillation), 2.2 MTA (visbreaking)
    • Scope of Work: Basic Design Acceptance; Detailed Design, Procurement.
    • Commissioning date: 2009
  • Ryazan Refinery
    • ZAO RNPK Deep Conversion Complex
    • Capacity: 2.5 MTA
    • Scope of Work: Basic Design Acceptance, Authority Engineering and Detailed Design (jointly with CB&I Lummus); Procurement; Supervision.
    • Commissioning date: 2005-2006

OAO TAIF-NK Catalytic Cracking Complex Capacity: 850 kTA OAOVNIPIneftScopeofWork: ActingasaGeneralDesigner; BasicDesign(jointly with OAO VNIINP);DetailedDesign; Procurement; Supervision. Commissioningdate: 2005

  • Yanos Yaroslavl Refinery
    • OAO Slavneft-Yaroslavnefteorgsintez Deep Conversion Complex
    • Capacity: 2.1 MTA
    • Scope of Work: Basic Design Acceptance, Detailed Design(jointly with Toyo Engineering Corporation); Supervision.
    • Commissioning date: 2005

OOO LUKOIL-Permnefteorgsintez VGO Hydrocracking Complex Capacity: 3.5 MTA - Plant OAOVNIPIneftScopeofWork: ActingasaGeneralDesigner; Basic Design Acceptance; DetailedDesign, Procurement, Supervision. Commissioning date: 2004 ZAO RNPK Catalytic Cracking Complex Capacity: 2.5 MTA OAOVNIPIneftScopeofWork: DetailedDesign, Supervision. Commissioning date: 2001

  1. [1]