Waikiki Pero Inga Oil Fields
Jump to navigation
Jump to search
Summary Information
- Operator: OGX
- Country: Brazil
- Location: BM-C-39 block of Campos Basin
- Production start:
- Partners:
- Type: Oil
- Estimated Reserves:
- Production Volume:
+++ Description
- The OSX 3 FPSO will be moored in approximately 110 meters water depth, have a storage capacity of 1.3 million barrels, be capable of processing 100,000 BOPD of heavy oil from the Campos Basin reservoir, generate approximately 60 MW of power, and provide for 150,000 BWPD of seawater treatment and injection
+++ Contractors
- **MODEC:** EPCI contract for the supply of the OSX-3 FPSO, a Floating, Production, Storage, and Offloading (FPSO) unit
- **MODEC and TOYO:** Installation of topsides units
+++ History
- 2012 - Declaration of commerciality
- 2012 - FPSO contracts awarded
- 2020 - PetroRio acquires 80% stake
+++ Geology
+++ Links