Tripatra Platform References
General Project Engineering Services Star Energy (Kakap) Ltd. 2.18 million E Technical Engineering Services Kodeco Energy Co. Ltd. 185,000 E FEED service for Gas Expansion Phase II Development 120 MSCFD of Gas 30,000 BOPD of Crude oil Kodeco Energy Co. Ltd. 543,564 E
- Tangguh Gas Field
- BP Berau Ltd
- FEED for Tangguh Gas Production Facilities
- Design of 3 (three) platforms
- 4.2 million
- E
(FEED Arco Blanket Engineering 3 New Tripod and platform 70 FT to 150 FT Water Depth Atlantic Richfield Indonesia Inc. (ARII) 48 million E, PM, CM Maxus Engineering Services 60 FT to 120 FT Water Depth Maxus S.E.S. 48 million E, PM, CM Kodeco KE ‐ 5 Gas Field
Kodeco/ Gunanusa 550,000 E
Anoa Platform & Subsea Pipeline 4‐pile offshore wellhead/productio n platform ; 250 FT Water Depth Amoseas Indonesia Inc. 1.1 million E, CS L‐Parigi Expansion Project 100 FT Water Depth Pertamina 373,000 E, PM, CM Conoco “Udang” Field CONOCO 219,579 E Gas Liquid Recovery Project
IIAPCO 2.5 million E
“P” Field Dev. Project 150 FT Water Depth Atlantic Richfield Indonesia Inc. (ARII) 3 million E, PM, CM Multi Platform Project Dev. Java Sea IIAPCO 6 million E, PM, CM
- Lapisan Parigi Gas Field
- Indonesia
- Pertamina
- L‐Parigi Gas Project, Receiving Facilities
- 60 MMSCFD
- 5 million
- E, CM
- Kakap KH Oil Field
- Indonesia
- Marathon Petroleum
- 300 FT Water Depth
- 1.4 million
- Engineering
- Pagerungan Gas Field
- Indonesia
- ARBNI
- Pagerungan Development
- Preliminary Engineering
- 450 MMSCFD
- 1.8 million
- E