Suncor Edmonton Refinery

From A Barrel Full
Jump to navigation Jump to search

Summary Information

Refining Units

  • CDU,
  • VDU,
  • Fluidised catalytic cracking unit
  • Delayed Coker
  • Hydrotreater
  • Sulphur Unit
  • Steam Methane Reformer

Terminal Capacity

  • Crude Oil:
  • Refined Products:

Crude Supply

  • The refinery runs entirely on oil sands-based feedstocks

Products Produced

  • Gasoline, Diesel, Jet Fuel, Petrocoke, Sulphur

Projects

-

Other Information

  • Petro-Canada awarded Bantrel the EPC contract to convert this refinery to process bitumen-based feedstock from the company's oilsands extraction sites. The project was completed in 2008.
  • The RCP involves the replacement of the existing process units: crude unit, vacuum unit, delayed coker, amine unit, sulphur plant and sour water stripping. In addition, a number of units were revamped and offsites and utilities added.

History

  • 2004 - Air Products and Technip awarded hydrogen plant contract
  • 2008 - Refinery upgrade project completed, enabling the refinery to switch to oil sands
  • 2010 - Delayed coker project completed
  • 2013 - KBR signs three year maintenance agreement

Links

  1. Refinery webpage
  2. Foster Wheeler Delayed Cokers
  3. Bantrel Projects
  4. Air Products Canada to Build and Operate a New Hydrogen Plant in Edmonton, Alberta to Supply Petro-Canada's Refinery
  5. Refinery Conversion Programme Presentation
  6. KBR to Conduct Turnaround Services for Suncor Energy’s Refinery in Edmonton, AB, Canada