Sarawak Gas Project
Jump to navigation
Jump to search
Summary Information
- Operator: Murphy
- Country: Malaysia
- Location: Block SK 309 & SK311, shallow water offshore Sarawak
- Production start: 2009
- Partners: Murphy - 85%, Petronas - 15%
- Type: Gas
- Estimated Reserves:
- Production Volume:
Description
- The Sarawak Gas Project is multi-phase development for several natural gas discoveries in blocks SK309 and SK311, and started producing in 2009.
- The development includes **Golok**, **Merapuh**, **Serampang**, **Belum** & **Pemanis** gas fields
- Murphy provides gas to the Malaysia LNG Terminal complex via a gas sales contract with PETRONAS, the Malaysian state-owned oil company, for gross sales volumes up to 250 mmcfd.
- Gas sales via pipeline to shore; condensate to the West Patricia FSO
Contractors
- **Ranhill-WorleyParsons:** Front End Engineering Design for phase 1
- **Kencana:** Serampang-A (SEPA) Platform
- **MMCOG:** Front End Engineering & Design for Belum Topside Facility
- **Swiber:** Golok pipeline
- **BC Petrochemical:** Chemical Injection Skid Package
History
- 2006 - HOA signed for gas sales
- 2007 - FEED completed for phase 1
- 2009 - First gas produced
- 2019 - PTTEP acquires Murphy's Malaysia business
Geology
Links
- Murphy Oil, Malaysia
- Anggerik Laksana Platform References
- BC Petrochemical Oil And Gas Processing References
- MMCOG Platform References
- SapuraKencana Platform References
- Serimax Pipeline References
- Murphy Oil Announces Heads Of Agreement For Gas Contract Offshore Sarawak Malaysia
- Ranhill-WorleyParsons delivers FEED package for Murphy Oil
- Murphy Oil Announces First Production From Sarawak Natural Gas Project In Malaysia
- PTTEP acquires Murphy Oil Corporation’s business in Malaysia Strengthen long-term growth in Southeast Asia