Regnar Oil Field

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Operator: Maersk
  • Country: Denmark
  • Location: North Sea
  • Production start: 1993
  • Partners:
  • Type: Oil / Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • The Regnar Field has been developed as a satellite to the Dan Oil Field. Production takes place in a subsea-completed well. The production is transported by pipeline in multiphase flow to Dan F for processing and export ashore.
  • The well is remotely monitored and controlled from the Dan FC platform.

Contractors

  • -

History

  • 1979 - Regnar Oil Field discovered
  • 1993 - Regnar Oil Field first production
  • 2017 - Total acquired a stake in its take over of Maersk

=== Geology

  • The Regnar Field is an anticlinal structure, induced through salt tectonics. The reservoir is heavily fractured.

Links

  1. Maersk, Field Details
  2. Danish Producing fields
  3. Total acquires Maersk Oil for $7.45 billion in a share and debt transaction