Raia Manta and Raia Pintada Oil and Gas Fields

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Operator: Equinor
  • Country: Brazil
  • Location: BM-C-33 area, in Campos Basin
  • Production start: Planned 2028
  • Partners: Equinor 35 % (operator), Repsol Sinopec Brasil 35 %, Petrobras 30%
  • Type: Oil and Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • The development concept comprises one floating production storage and offloading unit (FPSO) capable of processing gas and oil/condensate to meet sales specifications without further onshore processing. The FPSO will have a production capacity of 126.000 bpd of oil, 16 million cubic meters of gas per day with expected average exports of 14 million cubic meters of gas per day.


Contractors

  • Saipem: offshore transport and installation of a subsea gas export line and associated equipment in water depths of around 2,900 meters, as well as the horizontal drilling activities for the shore approach.

History

  • 2010 - Field discovered by Repsol Sinopec
  • 2016 - Equinor became operator
  • 2023 - Equinor declares commerciality

Geology

Links

  1. Equinor declares commerciality in the BM-C-33 area, in Campos Basin, Brazil
  2. Saipem awarded two offshore contracts worth approximately 1.9 billion USD