Raia Manta and Raia Pintada Oil and Gas Fields
Jump to navigation
Jump to search
Summary Information
- Operator: Equinor
- Country: Brazil
- Location: BM-C-33 area, in Campos Basin
- Production start: Planned 2028
- Partners: Equinor 35 % (operator), Repsol Sinopec Brasil 35 %, Petrobras 30%
- Type: Oil and Gas
- Estimated Reserves:
- Production Volume:
Description
- The development concept comprises one floating production storage and offloading unit (FPSO) capable of processing gas and oil/condensate to meet sales specifications without further onshore processing. The FPSO will have a production capacity of 126.000 bpd of oil, 16 million cubic meters of gas per day with expected average exports of 14 million cubic meters of gas per day.
Contractors
- Saipem: offshore transport and installation of a subsea gas export line and associated equipment in water depths of around 2,900 meters, as well as the horizontal drilling activities for the shore approach.
History
- 2010 - Field discovered by Repsol Sinopec
- 2016 - Equinor became operator
- 2023 - Equinor declares commerciality