- AGL Silver Springs Storage Project 32 MMSCFD TEG Dehydration Package, DPCU and 3 Phase Separator Under Const. Australia
- Zubair Oil Field
- Iraq
- ENI
- STX Heavy Industries
- 2 x 40,000 BWPD Water Treatment Package
- Under Const.
- Kepodang Gas Field
- Indonesia
- J. Ray McDermott
- Petronas
- 160 MMSCFD TEG Dehydration Package - TEG circulation rate 18.6 USGPM
- Under Const
- Ichthys FPSO
- Australia
- Samsung Heavy Industries
- Inpex Browse
- Fuel Gas H2S and Mercury Removal Package
- Under Const.
- Kerendan area Gas Fields
- Indonesia
- PT Meindo Elang Indah / Salamander Energy
- Kerendan Gas Facilities
- 26.3 MMSCFD TEG Dehydration Package
- - TEG circulation rate 3.8 USGPM Under Const.
- Towell Engineering Services / Daleel Petroleum Company B Block Station WI & WTU Facilities Upgrade Project 2 x 50,000 BWPD Water Treatment Packages and
- Refurbishment Works Under Const. Oman
- Drilling Systems CEMSIM Cemeting Simulation Module Under Const. UAE
- Expro PTI / PDVSA Petroindependencia Petroindependencia Heavy Oil EPF Electrostatic Coalescers Under Const. Venzuela
- Malaysia Sabah FLNG Terminal
- Malaysia
- Technip Geoproduction Sdn Bhd
- Petronas
- 2,500 BWPD Desander Package and 1,900 BWPD Produced Water Treatment Package
- Under Const.
- Energy Developments Limited Remote Energy McArthur River Mine Phase 3 Development Project Fuel Gas Conditioning Package Under Const. Australia
- Ichthys FPSO
- Australia
- Samsung Heavy Industries
- Inpex Browse
- 3 x 672 MMSCFD TEG Dehydration Packages - TEG circulation rate 101.5 USGPM
- Under Const.
- Banyu Urip Oil Field
- Indonesia
- PT Tripatra
- Mobil Cepu
- EPC-1 Production Processing Facilities - 2 x 814 m3/h Deoiler Hydrocyclone Packages
- Under Const.
- Colombia LNG Export Terminal Project
- Columbia
- Black & Veatch Corporation
- Exmar
- 91.5 MMSCFD Molecular Sieve Dehydration Package
- 91.5 MMSCFD Natural Gas Sweetening Package - Amine circulation rate 55 USGPM
- Under Const.
- CB&I / AGL Energy Newcastle Gas Storage Facility 13.6 MMSCFD Molecular Sieve Dehydration Package &
- Glycol Heater Package Under Const. Australia
- CB&I / AGL Energy Newcastle Gas Storage Facility 13.6 MMSCFD Natural Gas Sweetening Package
- - Amine circulation rate 90.2 USGPM Under Const. Australia
- Mussallim Oil Field
- Oman
- Towell Engineering Services / PDO
- Musallim Second Module Project
- 126,800 BWPD Water Treatment Package
- Under Const.
- Ravva Oil and Gas Field
- India
- Cairn Energy
- Ravva Field Lifecycle Project - Water Separation and Treatment Package
- Including HIPPS package, Desanders, Deoilers, Degassers, Compact Flotation Unit
- Under Const.
- PT. IKPT / ConocoPhillips EPC Rawa Modification for LTRO Project Condensate Stabilisation Package Under Const. Indonesia
- WJ Towell / PDO Oman Zauliyah Gas Compression Phase III Project TEG Dehydration Package
- Dew Point Control Unit, Condensate Stabilisation Package Under Const. Oman
- Zawtika Gas and Condensate Field
- Myanmar
- SMOE
- Zawtika Development Project Phase 1A
- Fuel Gas Conditioning Package
- 22,000 BWPD Produced Water Treatment Package, Including Desanders, Deoilers and Degasser
- Under Const.
- Santos Roma Well Head Desander Test Unit 550 BPD Well Head Desander Under Const. Australia
- KJVG / Chevron Australia Gorgon (Domgas) Project MEG Regeneration Package
- -MEG circulation rate 10 USGPM Under Const. Australia
- Fairview Coal Seam Methane Gas Field
- Australia
- Fluor / Santos
- GLNG Upstream Project
- 7 x TEG Dehydration Packages
- Fairview - 5 x 100 MMSCFD, TEG circ. rate 17.5 USGPM
- Roma - 2 x 85 MMSCFD, TEG circ. rate 17.5 USGPM
- 2013 Australia
- Occidental of Oman Inc. Jalal Production Facility 29.3 MMSCFD TEG Dehydration Package
- - TEG circulation rate 4.4 USGPM 2012 Oman
- Descon Engineering / UCH-II Power Limited UCH-II Power Plant Expansion Project Fuel Gas System 2012 Pakistan
- Santos Port Bonython Refrigerated Propane Recovery Project Submerged Propane Pumps Propane and MEG Heaters 2012 Australia
- JGC Gulf / Tatweer Petroleum Well Manifold Project 17 x Fuel Gas Systems 2012 Bahrain
- JGC Gulf / Banagas Compression Station (CS-9) 69 MMSCFD TEG Dehydration Package
- - TEG circulation rate 42 USGPM 2012 Bahrain
- Todd Taranaki Mangahewa C 4 x 18,600 Std m3/hr Wellhead Desanders 2012 New Zealand
- CO2CRC Solvent Skid Modifications and Additions Post Combustion CO2 Capture 2012 Australia
- Aishwariya Oil Field
- India
- Cairn Energy
- Aishwariya Field - Low Pressure Separator
- 2012
- Asawer Oil & Gas / StarOil South Annajma Early Production Facilities Full EPF including:
- Production & Well Test Separator
- Crude Oil Exchanger
- Fuel Gas, KO and Flare Systems
- Control Room and DCS 2012 Sudan
- Halfaya Oil Field
- Iraq
- Siemens Industrial Turbomachinery Limited
- Halfaya Project Surface Facility Early FCP
- Liquid Fuel Treatment Skid
- 2012
- Shah Gas Field
- UAE
- Samsung Engineering Co. Ltd
- Shah Field Development Project
- 5 x 9800 BWPD Water Treatment Packages
- 2012
IHI Engineering Yurralyi Maya Power Station GTG8 Project Fuel Gas Filter Package 2012 Australia
- Anoa Natuna Gas Field
- Indonesia
- P.T. Timas
- Premier Oil
- Anoa Gas Expansion Project Upgrade
- 523.7 kW DEG Reboiler Firetube Refurbishment
- 2012
- Transfield Worley / STOS Kapuni Tight Gas Project 2 x 2,235 kW Water Bath Heaters
- Including one new and one refurbished 2012 New Zealand
- Macedon Gas Field
- Australia
- Technip
- BHP Billiton
- Macedon Gas Project - Water Treatment Package
- 1 x Corrugated Plate Interceptor
- 1 x Induced Gas Flotation Unit
- 2012
- Hal Offshore / ONGC ICP, BHS & SCA Platforms 3 x Produced Water Conditioning Packages
- (160,000, 100,000 & 50,000 BWPD respectively) 2011 India
- Mangala Oil Processing Terminal
- India
- Cairn Energy
- Mangala Process Terminal Capacity Expansion Project
- Complete Oil Production Train
- 2011
- SK Engineering & Construction Co / ADCO Ruwais Refinery Hydrocyclone Brine Treatment Package 2011 UAE
- International Energy Resources Natural Gas Treatment & Filtration Fuel Gas & Fuel Oil Conditioning Packages 2011 Dubai
- Heera Oil Field
- India
- Essar
- ONGC
- Neelam Heera Reconstruction Project - Neelam Platform
- 145,000 BWPD Produced Water Conditioning Package
- 2011
- Minerva Gas Field
- Australia
- Aker Solutions / BHP Billiton
- Minerva Long Term Delivery Project
- 1,700 kW Refrigeration and Gas Chiller Package
- 2011
- Stroytransgaz North Middle Area Gas Exploitation Project 12 MMSCFD Natural Gas Sweetening Package
- - Amine circulation rate 18 USGPM 2011 Syria
- Stroytransgaz North Middle Area Gas Exploitation Project 131 MMSCFD TEG Dehydration Package
- - TEG circulation rate 14.7 2011 Syria
- Papua New Guinea LNG Terminal
- Papua New Guinea
- Aker Solutions
- Oil Search
- PNG LNG Gas Project
- 3 x 100 MMSCFD TEG Dehydration Packages- TEG circulation rate 45 USGPM
- 2011
- Wallumbilla Natural Gas Hub
- Australia
- Southern Controls
- EPIC Energy
- QSN3 Wallumbilla
- Instrument Gas Skid
- 2011
- Papua New Guinea LNG Terminal
- Papua New Guinea
- Aker Solutions
- Oil Search
- PNG LNG Gas Project
- 1 x Fuel Gas Package
- 2011
- Platong II Gas Field
- Thailand
- J. Ray McDermott
- Chevron
- Platong Gas II Project
- 2 x 250MMSCFD TEG Dehydration Packages - TEG Circulation Rate 65 USGPM
- 2011
Creative Power Solutions AG Zawia Power Station Fuel Gas Heater 2011 Libya Chevron Bangladesh Muchai Gas Compression Project Fuel Gas Conditioning Skid 2011 Bangladesh
- Jambi Merang Gas And Condensate Field
- Indonesia
- PT Tripatara
- HESS
- Jambi Merang Gas Production Facility
- 3 x Deoiler Hydrocyclone Packages
- 2010
- Ujung Pangkah Oil And Gas Field
- Indonesia
- PT Gunanusa
- HESS
- 1 x Induced Gas Flotation Package
- 2 x Deoiler Hydrocyclone
- 2010 Indonesia
Santos, Australia Roma Underground Storage Pilot Project 515 kW PH-GR Water Bath Heater 228 kW Pickanjinnie Water Bath Heater 2010 Australia Origin Energy, Australia Sea Gas Mortlake Pipeline Meter Station 1566 kW Water Bath Heater 2010 Australia
- Zamzama Gas Field
- Pakistan
- Aker Solutions
- BHP Billiton
- ZamZama Front End Compression Project
- Fuel Gas Conditioning Skid
- 2010
- Gajah Baru Gas Field
- Indonesia
- PT Saipem
- Premier Oil
- Gajah Baru Field Development
- 1 x Deoiler Hydrocyclone
- 1 x Induced Gas Flotation Package
- MEG Regeneration package - MEG circulation rate 13.6 USGPM
- 2010
- Isfahan Refinery
- Iran
- Fimco
- Esfehan Refinery Development and Revamping Project - Desalter Package
- 2010
- Cheleken Area Oil and Gas Fields
- Turkmenistan
- Dragon Oil
- Lam 13 & 28 Platforms - Flare KO & Vent/Drain Drum Skids
- 2010
- Addax Petroleum Coucal Facility Heat Exchanger Skid 2010 Gabon
- Essar / ONGC Neelam Heera Reconstruction Project - Heera Platform 100,000 BWPD Produced Water Conditioning Package 2010 India
- Jambi Merang Gas And Condensate Field
- Indonesia
- PT Tripatara
- HESS-Pertamina
- Jambi Merang Gas Production Facility
- 80 MMSCFD
- TEG Dehydration Package - TEG circulation rate 9.5 USGPM
- 2010
- Abu Dhabi Crude Oil Pipeline Adcop Project
- UAE
- T D Williamson
- ADCO
- ADCOP Pig Handling System - High Pressure Pig Launcher / Receiver Traps
- 2010
- Skikda Refinery
- Algeria
- Airfins
- Lube Oil Coolers
- 2010
- Crescent Petroleum Company International Khor Mor to Chamchamal Pipeline Pig Launcher / Receiver Traps 2010 Iraq
- Mumbai High Oil Field
- India
- AGJV / ONGC
- MHS // ICP-R Process Platform Project
- 90 MMSCFD TEG Dehydration Package - TEG circulation rate 18 USGPM
- 2010
- Yolla Gas Field
- Australia
- Origin Energy, Australia
- BassGas Gas Plant Development
- Propane H2S & Mercury Removal Unit
- 2010
- Addax Petroleum MAGHENA Inc Tsiengui Brown Field Expansion Project Inlet Degasser Vessels 2010 Gabon
- Qarn Alam Oil Field
- Oman
- Petroleum Development / Dodsal Engineering
- Qarn Alam Project Surface Facility
- Produced Water Treatment Package
#* 2 x 241,500 BWPD CPI Vessels #* 4 x 120,100 BWPD IGF Vessels #* 2010
- TD Williamson / ADCO Abu-Dhabi Crude Oil Line Project Pig Launcher / Receiver Traps 2010 UAE
- Magma Oil Underground Coal to Liquids (UCTL) Pilot Plant Custom designed package for previously untested UCTL process. 2010 Australia
- Longford Gas Conditioning Plant
- Australia
- J. Ray McDermott
- Esso
- Kipper Tuna and Turrun Phase II
- 2 x Deoiler Hydrocyclones
- 1 x Induced Gas Flotation Vessel
- 2009
- West Bukha Oil Field
- Oman
- RAK Gas Petroleum
- West Bukha Gas Treatment Plant
- 60 MMSCFD Amine CO2 & H2S Removal Package - 816 USGPM circulation rate
- 2009
- North Rankin And Perseus Gas Fields
- Australia
- EOS
- Woodside
- North Rankin Platform NR2
- Diesel Filter Package
- 2009
- Spring Gully Gas Fields
- Australia
- Origin Energy
- Spring Gully Development
- Taloona Gas Plant
- 50 MMSCFD TEG Dehydration Package - TEG circulation rate 10 USGPM
- 2009
- Origin Energy, Australia Talinga Gas Development – Talinga Gas Plant 3 x 60 MMSCFD TEG Dehydration Packages - TEG circulation rate 12 USGPM 2009 Australia
- North Belut Gas Field
- Indonesia
- PT Nisconi
- ConocoPhillips
- North Belut Gas Field Development (Offshore platform)
- 2 x Sand Container Systems
- 2009
- Crescent Petroleum Company International Bazian and Ibril Power Station Filter Separator and PRS Skid 2009 Iraq
- STSI Engineering / Hesco Jihar Oil Field Stage 2 Gas Dehydration and Dew Point Control Unit 2009 Syria
- Ujung Pangkah Oil And Gas Field
- Indonesia
- PT Tripatra
- HESS
- 1 x Deoiler Hydrocyclone / Induced Gas Flotation Package
- 2009
- Blacktip Gas Field
- Australia
- ENI
- Blacktip Gas Field Development
- 2 x Induced Gas Flotation Units
- 2009
- TRUenergy, Australia Iona Gas Plant – LOPS Project TEG Contactor 2009 Australia
- South Angsi Oil Field
- Malaysia
- Petronas
- Angsi A platform - Sand Handling and Removal Package
- 2009
- Patricia Baleen Gas Processing Plant
- Australia
- Santos
- Patricia Baleen Upgrade
- Dew Point Control Unit
- MEG Regeneration Package
- Condensate Stabilisation Package
- 2009
- Blacktip Gas Field
- Australia
- ENI
- Blacktip Gas Field Development
- 133 MMSCFD TEG Dehydration Package - TEG circulation rate 12 USGPM
- 2009
- Australia
- Arrow Energy, Australia Stratheden Daandine Development 40 MMSCFD TEG Dehydration Package
- TEG circulation rate 5 USGPM 2008 Australia
- Fairview Coal Seam Methane Gas Field
- Australia
- Santos
- 2 x 38 MMSCFD TEG Dehydration Packages - TEG circulation rate 7.5 USGPM
- 2008
- Blacktip Gas Field
- Australia
- ENI
- Blacktip Gas Field Development
- 2 x Induced Gas Flotation Units
- 2008
- Tunu Gas Field
- Indonesia
- Total
- Tunu Phase II
- Fuel Gas Conditioning System
- 2008
- Fairview Coal Seam Methane Gas Field
- Australia
- Santos
- 2 x 38 MMSCFD TEG Dehydration Packages - TEG circulation rate 7.5 USGPM
- 2008
- Spring Gully Gas Fields
- Australia
- Origin Energy
- Spring Gully Development – Taloona Gas Plant
- Fuel Gas Treatment Package
- 2 x 50 MMSCFD TEG Dehydration - TEG circulation rate 10 USGPM
- 2008
- Blacktip Gas Field
- Australia
- ENI
- Blacktip Gas Field Development
- 133 MMSCFD TEG Dehydration package - 12 USGPM circulation rate
- 2008
- North Belut Gas Field
- Indonesia
- PT Nisconi
- ConocoPhillips
- North Belut Gas Field Development (Offshore platform)
- 2 x Sand Handling and Removal Packages
- MEG Regeneration package - 19 USGPM circulation rate
- 2008
- Kupe Gas Field
- New Zealand
- Technip
- Origin Energy
- Kupe Gas Project
- 78.5 MMSCFD Molecular Sieve Dehydration Package
- 2008
- Doosan Heavy I & C / DEWA Jebel Ali Phase M Fuel Gas Treatment Package 2008 UAE
- Mukhaizna Oil Field
- Oman
- Dodsal Engineering
- Occidental
- Mukhaizna Central Processing and Satellite Facilities Project
- 2 x Induced Gas Flotation Units
- 2008
- PDO Oman Musallim QA09 & QA10 2 x 126,800 BWPD Water Treatment Packages 2008 Oman
- Spring Gully Gas Fields
- Australia
- Origin Energy
- Spring Gully Gas Plant – Phase III
- 50 MMSCFD TEG Dehydration Package - TEG circulation rate 10 USGPM
- 2007
- National Iranian Oil Co. / Payandan Nargessi Associated Gas Gathering, Compression & Injection Project 20 MMSCFD TEG Dehydration package - TEG circulation rate 10 USGPM 2007 Iran
- Safwan / Kuwait Oil Company Early Production Facility Deoiler Hydrocyclone and IGF Package 2007 Kuwait
- Spring Gully Gas Fields
- Australia
- Origin Energy
- Spring Gully Development (Phase 3)
- 2 x Fuel Gas Conditioning Package
- 2007
http://www.processgroupintl.com/media/downloads/PGPROREF_General_JULY_13.pdf