Pascagoula Gas Processing Plant

From A Barrel Full
Jump to navigation Jump to search

Summary Information

+++ Brief Description

  • The liquid removal facility has a design capacity of 10,000 barrels per day (bbl/d). Gas processing capacity is 1.5 bcf/d
  • Gas from the slug catcher is dehydrated, and then processed in three trains: two cryogenic trains each with a capacity of 500 MMscf/d and a refrigeration dewpoint train.
  • The Destin Gas Pipeline and Chandeleur Gas Pipeline, deliver gas to the onshore facilities.
  • Liquids are transported on the Tri-States NGL Pipeline

++++ Related Oil and Gas Fields

+++ Ongoing Projects

  • -

+++ Other Information

  • -

+++ History

  • 1998 - The plant begins operations
  • 1999 - The second train started
  • 2004 - Train number 3 started operations

+++ Relevant Links

  1. Pascagoula Processing Plant, Destin