N'Dola Oil Field

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Operator: Chevron
  • Country: Angola
  • Location: Block 0, Cabinda
  • Production start: 1997
  • Partners:
  • Type: Oil / Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • The North N'Dola development consists of a platform with 20,000 bpd of processing capacity.
  • The South N’dola project consists of a well head platform with 12 production wells and a tie-back to the existing Mafumeira production and processing platform

Contractors

  • Algoa: Construction of the South N’dola platform

History

  • 1997 - First oil
  • 2023 - Constructions starts for South N’dola

Geology

Links

  1. Chevron Celebrates First Oil Flow From New Area Offshore Angola
  2. CABGOC starts fabricating South N’dola platform in Cuanza Sul