Medgaz Gas Pipeline
Jump to navigation
Jump to search
Summary Information
- Source: Beni Saf, Algeria
- Destination: Almería, Spain
- Ownership: Medgaz
- Website: http://www.medgaz.com/
- Length: 208 kilometres ( miles)
- Capacity: 8 billion cubic meters per year
- Status: Operating
+++ Details
- Consists of a 24 inch nominal diameter, 208 kilometre long offshore pipeline between Beni Saf, Algeria and Almería, in the Spanish coast.
- The pipeline, has been laid at a maximum water depth of 2,160 meters, and has an initial capacity of 8 billion cubic meters per year.
- The undersea sections were laid by the Saipem 7000 vessel
+++ Contractors
- **Saipem:** Engineering, procurement, construction and pre-commissioning of a 24 inch nominal diameter, 208 kilometre long offshore pipeline
- **Dresser-Rand:** Supply of three high-efficiency DATUM compressor trains
+++ History
- 2002 - Total and Sonatrach sign letter of intent
- 2007 - Saipem awarded an EPIC contract
- 2008 - 3 people died in an accident whilst laying the pipeline
- 2011 - The pipeline is completed
+++ Other Information
- -
+++ Links
- Saipem Africa Pipeline References
- TotalFinaElf and Sonatrach sign letter of intention for the purchase of natural gas via the Medgaz project
- Saipem awarded three new contracts worth in excess of 1 billion euro
- Saipem: MEDGAZ Accident
- Dresser-Rand DATUM Compression Trains Selected for Europe's MEDGAZ Pipeline Project
- Medgaz connects the pipeline to the Spanish gas network