Kawasaki Refinery
Jump to navigation
Jump to search
Summary Information
- Ownership: TonenGeneral Sekiyu (Exxon)
- Website:
- http://www.tonengeneral.co.jp/
- http://www.exxonmobil.com/
- List of [[[Exxon Mobil Refineries]]]
- Location:
- Capacity: 16.75 million tons/annum & 268,000 bbl/day
- Nelson Complexity:
- Refining Depth:
+++ Brief Description
- A large complex refinery with a residue hydrocracker
+++ Refining Units
- [[[Atmospheric Distillation]]]
- Residue hydrocracker
+++ Terminal Capacity
- Crude Oil:
- Refined Products:
+++ Crude Supply
- -
+++ Products Produced
- -
+++ Ongoing Projects
- The refinery plans to shut one 67,000 bpd crude unit
+++ Other Information
- -
+++ History
- 1962 - Refinery operations began
- 1997 - Residue hydrocracker & SMR was commissioned
- 2014 - Fire in Residue hydrocracker
- 2014 - Capacity reduced to 268,000 bpd
- 2015 - Capacity reduced to 258,000 bpd
- 2016 - Merger of Tonen General and JX holdings brought refinery under Eneos control
Links
- TonenGeneral Main Production Sites
- First Residue Hydrocracker starts-up in Asia Pacific
- Chiyoda Hydrogen Manufacturing Units
- Fire Incident at TonenGeneral Sekiyu K.K. Kawasaki Refinery
- TonenGeneral Group to Optimize Kawasaki Refinery Operations
- Execution of Memorandum of Understanding regarding Business Integration