Karaikal LNG Terminal

From A Barrel Full
Jump to navigation Jump to search

Summary Information

Brief Description

  • The project involves a permanently moored FSU (Floating Storage Unit) inside the breakwater at the terminal and will store the LNG
  • The re-gasification facility will be developed on shore through 125 mmcfd re-gas modules
  • The re-gasified gas will be pumped through the GAIL Cauvery Basin Natural Gas Pipeline to customers

Technical Details

  • Storage capacity:
  • Unloading capacity:
  • Send out capacity:
  • Constructor:

Ongoing Projects/Project Status

Suppliers / Customers

  • Suppliers:
  • Customers:

History

  • 200X -

Other Information

-

Links