Fletcher Finucane Oil Field
Jump to navigation
Jump to search
Summary Information
- Operator: Santos
- Country: Australia
- Location: North West Shelf
- Production start: 2013
- Partners: Santos - 48%, Kufpec, JX Nippon
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
+++ Description
- The project is a three well sub-sea tie back to the existing Santos-operated floating production, storage and offloading facility located at Mutineer Exeter Oil Field
- The Modec Venture 11 FPSO is installed in 156 meters (512 feet) water depth and has an oil processing capacity of 100,000 barrels of oil per day, gas handling of 2-3 million cubic feet per day, produced water treatment of up to 125,000 barrels per day, topsides water injection facilities for 150,000 barrels per day and storage capacity of 930,000 barrels
+++ Contractors
- **Technip:** Project management, engineering and the supply of 31 kilometers of 10.2” and 9” production flowlines*, along with 22 kilometers of 3” service lines
- **JDR:** Design, manufacture and supply of Subsea Production Umbilicals and Subsea Power Cables
+++ History
- 2012 - Fletcher Finucane oil development sanctioned
- 2013 - First oil from Finucane field