Fletcher Finucane Oil Field

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Operator: Santos
  • Country: Australia
  • Location: North West Shelf
  • Production start: 2013
  • Partners: Santos - 48%, Kufpec, JX Nippon
  • Type: Oil / Gas
  • Estimated Reserves:
  • Production Volume:

+++ Description

  • The project is a three well sub-sea tie back to the existing Santos-operated floating production, storage and offloading facility located at Mutineer Exeter Oil Field
  • The Modec Venture 11 FPSO is installed in 156 meters (512 feet) water depth and has an oil processing capacity of 100,000 barrels of oil per day, gas handling of 2-3 million cubic feet per day, produced water treatment of up to 125,000 barrels per day, topsides water injection facilities for 150,000 barrels per day and storage capacity of 930,000 barrels


+++ Contractors

  • **Technip:** Project management, engineering and the supply of 31 kilometers of 10.2” and 9” production flowlines*, along with 22 kilometers of 3” service lines
  • **JDR:** Design, manufacture and supply of Subsea Production Umbilicals and Subsea Power Cables

+++ History

  • 2012 - Fletcher Finucane oil development sanctioned
  • 2013 - First oil from Finucane field

+++ Geology

+++ Links

  1. Fletcher Finucane oil development sanctioned; Santos lifts interest in project
  2. JDR Completes Successful Delivery Of Complex Project For Santos
  3. Technip awarded flexible supply contract for Fletcher Finucane development in Australia
  4. First Oil from Finucane South Field, North West Shelf, Australia