Cili Padi Gas Field
Jump to navigation
Jump to search
Summary Information
- Operator: Shell
- Country: Malaysia
- Location: SK 308, 153 km offshore Bintulu
- Production start:
- Partners: Petronas, Nippon Oil
- Type: Gas
- Estimated Reserves:
- Production Volume:
+++ Description
- The field uses an unmanned platform, **CPDR-A**, tied back to the F23 Gas and Condensate Field
+++ Contractors
- **Technip:** conceptual and detailed design engineering for:
- topsides(1) and substructure for a new unmanned satellite drilling riser(2) platform,
- topsides, substructure and bridge for another new riser platform, which will be bridge-linked to the existing F23 gas production platform,
- modification of the topsides of the F23 platform for the tie-in of the two new platforms,
- a new 30 km pipeline including a subsea T-piece for the tie-in of the Selasih field, and
- a new electrical power generation and distribution system.
- **TL Offshore:**
- **Kencana:** CPDR-A Topsides
+++ History
- 2007 - Technip awarded conceptual and detailed design engineering contract
+++ Geology
+++ Links