Cidade de ITAGUAÌ MV26 FPSO

From A Barrel Full
Jump to navigation Jump to search

Summary Information

+++ Brief Description

  • The FPSO will be capable of processing 150,000 barrels of oil per day, 280 MM standard cubic feet of gas per day and has storage of 1,600,000 barrels of total fluids
  • FPSO Cidade de Itaguaí will be connected to eight production wells and nine injection wells. The natural gas will be exported to shore via a subsea gas pipeline
  • The FPSO is a conversion of the VLCC Alga
  • The vessel is the

+++ Contractors

  • **Schahin Group and MODEC, Inc.:** Engineering, procurement, construction, mobilization, installation and operation of the FPSO
  • **EBE shipyard:** Fabrication of 2 topsides modules
  • **Schahin shipyard:** Fabrication of 10 topsides modules
  • **BrasFELS:** Integration of modules
  • **Toyo:** Installation of topsides units

+++ Status

  • In operation

+++ History

  • 2012 - Schahin Group and MODEC awarded FSPO contract
  • 2012 - TOYO Awarded FPSO Topsides Units contract
  • 2013 - Mitsui and Marubeni aquired a stake
  • 2015 - The vessel arrived in the field
  • 2015 - FPSO starts production

+++ Other Information

  • -

+++ Links

  1. The Schahin Group and MODEC, Inc. land Iracema North FPSO for Petrobras and the companies of Consortium BM-S-11
  2. TOYO Awarded Consecutive FPSO Topsides Units Projects for Brazil
  3. Mitsui, Mitsui O.S.K. Lines, Ltd. and Marubeni Corporation to Participate in Ultra-Deepwater FPSO Chartering Project
  4. FPSO Cidade de Itaguaí arrives in Lula field
  5. BG Group starts up sixth FPSO in the Santos Basin, offshore Brazil