Summary Information

  • Operator: CNOOC
  • Location: Bohai Bay
  • Production start: 2004
  • Partners: CNOOC, Chevron, Brightoil
  • Type: Oil
  • Estimated Reserves:
  • Production Volume:

Description

  • The first phase of the development includes one 48-slot wellhead gathering platform and one 24-slot wellhead platform.
  • Phase 2 consists of a core-area gathering platform and two smaller unmanned satellite platforms, which are tied back approximately 13 kilometers to the FPSO
  • The field utilises the Hai Yang Shi You 112 FPSO, a floating production, storage and offloading facility (FPSO), as the main production platform.
  • The FPSO can process up to 80,000 barrels of oil and 350,000 barrels of gross liquids a day. It can store up to one million barrels of oil for offloading to shuttle tankers.
  • The Caofeidian (CFD) 11-3/5 field was developed as a satellite
  • The Caofeidian (CFD) 11-6/12-1S field has three wellhead platforms and is tied back via a 13-kilometer sub-sea pipeline to the FPSO

Contractors

  • **CNOOC Engineering:** Engineering, development and construction for both phases
  • **APL:** Provided complete SAL Yoke Systems (SYS)
  • **JDR Cable Systems:** Supply of dynamic catenary umbilicals

History

  • 2004 - First oil produced from CFD 11-1/11-2
  • 2006 - Production started from Phase 2
  • 2014 - Anadarko sells its stake to Brightoil
  • 2021 - The field was connected to an onshore power plant

Geology

Links

  1. Oil Fields CFD 11-1/11-2 Came On Stream
  2. Cable And Umbilical Specialist, JDR, Supplies Electro-Optical Power And Communication Cables To Bohai Bay Project
  3. Anadarko Starts Production from New Satellite Facilities in Bohai Bay, China
  4. CNOOC Engineering celebrate the successful startup of the CFD phase II oil field
  5. Anadarko Announces $1.075 Billion China Divestiture
  6. CNOOC Limited Announces Qinhuangdao/ Caofeidian Onshore Power Project Commences Operation Successfully