Bahia LNG Terminal

From A Barrel Full
Jump to navigation Jump to search

Summary Information

Brief Description

  • The terminal uses FSRU Sequoia
  • The integrated pipeline is 45 km long and 28 inches in diameter and connects TR-BA to two delivery points, São Francisco do Conde Pressure Reducing Station and São Sebastião do Passé Flow Control Station

Technical Details

  • Storage capacity: 173,400 m3
  • Unloading capacity:
  • Send out capacity: 700 million cubic feet per day
  • Constructor:

Ongoing Projects/Project Status

  • Under construction

Suppliers / Customers

  • Suppliers:
  • Customers: Gas is supplied to the GASCAC Gas Pipeline

History

  • 2014 - Terminal operations began
  • 2021 - Excelerate Energy took over operations
  • 2023 - Excelerate Energy and Petrobras Sign 10-Year Charter

Other Information

-

Links

  1. Transpetro's Terminals
  2. Excelerate becomes the first private sector company to sell regasified LNG to customers in Brazil
  3. Excelerate Energy and Petrobras Sign 10-Year Charter for FSRU Sequoia