Amenam Kpono Oil Field
Jump to navigation
Jump to search
Summary Information
- Operator: Total
- Country: Nigeria
- Location: OML 70 & OML 99, 60 km offshore Bonny
- Production start: 2003
- Partners: Nigerian National Petroleum Corporation (NNPC)
- Type: Oil & Gas
- Estimated Reserves:
- Production Volume:
+++ Description
- The reservoirs are situated at depths greater than 3,500 meters below the sea level
- Production from the field will be evacuated through a 30-kilometer pipeline linking the production platform to the Floating Storage and Offloading (FSO) terminal located on EPNL’s Odudu field in OML 100
- The **Unity FSO** has Storage Capacity of 2.4 Mmbbl
- Previously, the field utilised the **FSO Domy**
- Gas from the Akpo Oil Field is received via pipeline and sent to the Nigeria LNG Terminal
+++ Contractors
- **McDermott:** Engineering, construction and pre-commissioning for the the AMP-1 Production platform Topsides & Jacket
- **Stolt Offshore:** Engineering, procurement, fabrication, installation and commissioning of a 640 tonne water injection platform with 550 tonne topsides
- **HHI:** Contruction of **FSO Unity**
- **Saipem:**
- Engineering, procurement, construction and installation for a production platform and a bridge
- Living Quarter Detail Engineering and Procurement Services
- Amp 1 Platform, Technical Services
+++ History
- 1990 - The field was discovered
- 2000 - Final approval gained for development
- 2002 - HHI launch FSPO
- 2003 - First production
- 2004 - Stolt Offshore awarded Phase II water injection platform contract
+++ Geology
+++ Links
- Mcdermott Platform References
- Saipem Fixed Offshore Production Facilities Engineering Refe
- Gustomsc FPSO References
- Hyundai Heavy Industries FPSO References
- Jotun FPSO References
- Serimax Africa Pipeline References
- International Protective Coatings Fixed Platform References
- TotalFinaElf gets final official approval for offshore Amenam/Kpono field development
- Nigeria: first production of Amenam/Kpono and start up of a new floating storage and offloading facility
- Amenam/ Kpono Project, McDermott
- Stolt Offshore Announces $150 Million Contract in Nigeria
- HHI built a 340,000-ton FSO on shore, a landmark event in shipbuilding/offshore technology
- Saipem awarded construction contracts offshore Nigeria for USD 490 million
- AMP-2 Deck Float-Over Operation Succesfully Completed