Al-Jalila Oil Field
Jump to navigation
Jump to search
Summary Information
- Operator: Dubai Petroleum
- Country: UAE (Dubai)
- Location: offshore Dubai
- Production start: Expected 2014
- Partners:
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
+++ Description
+++ Contractors
- Technip:
- Construction and installation of the Jalilah B platform, a 900-ton deck, a 500-ton jacket, as well as 13 new risers on existing platforms.
- Installation of 110 kilometers of pipelines ranging from 6 to 24 inches in diameter
- **Hallin Marine:** Offshore pipelay and platform installation support
+++ History
- 2014 - Technip wins Jalilah B Platform contract
+++ Geology
+++ Links