Difference between revisions of "Zhejiang Ningbo LNG Terminal"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
(6 intermediate revisions by the same user not shown) | |||
Line 5: | Line 5: | ||
** [[CNOOC LNG Terminals]] | ** [[CNOOC LNG Terminals]] | ||
* Location: Zhejiang Province, China | * Location: Zhejiang Province, China | ||
− | * Capacity: | + | * Capacity: 6.0 million tons/annum |
− | * Status: | + | * Status: In Operation |
=== Brief Description === | === Brief Description === | ||
− | * | + | * An onshore regasification terminal with 6 tanks with a total capacity of 960,000 |
+ | * The terminal was expanded from 3.0 to 6.0 mtpa in 2020 | ||
=== Technical Details === | === Technical Details === | ||
− | * Storage capacity: three 160,000m3 full containment LNG storage tanks | + | * Storage capacity: |
+ | ** Phase 1: three 160,000m3 full containment LNG storage tanks | ||
+ | ** Phase 2: + three 160,000m3 full containment LNG storage tanks | ||
* Unloading capacity: | * Unloading capacity: | ||
* Send out capacity: | * Send out capacity: | ||
* Constructor: | * Constructor: | ||
− | + | ** TGE Gas Engineering built the tanks | |
− | |||
− | |||
=== Ongoing Projects/Project Status === | === Ongoing Projects/Project Status === | ||
* The project was completed in [[LNG Terminal Projects Completed in 2012 | 2012]] | * The project was completed in [[LNG Terminal Projects Completed in 2012 | 2012]] | ||
+ | * The expansion was completed in 2020 | ||
=== Suppliers / Customers === | === Suppliers / Customers === | ||
Line 33: | Line 35: | ||
* 2009 - Construction of the terminal started | * 2009 - Construction of the terminal started | ||
* 2012 - First cargo delivered from Qatar | * 2012 - First cargo delivered from Qatar | ||
+ | * 2020 - The teminal expansion was completed | ||
=== Other Information === | === Other Information === |
Latest revision as of 13:12, 7 January 2022
Contents
Summary Information
- Ownership: CNOOC
- Website: http://www.cnoocgas.com/
- Location: Zhejiang Province, China
- Capacity: 6.0 million tons/annum
- Status: In Operation
Brief Description
- An onshore regasification terminal with 6 tanks with a total capacity of 960,000
- The terminal was expanded from 3.0 to 6.0 mtpa in 2020
Technical Details
- Storage capacity:
- Phase 1: three 160,000m3 full containment LNG storage tanks
- Phase 2: + three 160,000m3 full containment LNG storage tanks
- Unloading capacity:
- Send out capacity:
- Constructor:
- TGE Gas Engineering built the tanks
Ongoing Projects/Project Status
- The project was completed in 2012
- The expansion was completed in 2020
Suppliers / Customers
- Suppliers: Qatargas is supplying the terminal
- Customers: The regasified LNG will be fed into a proposed Zhejiang Natural Gas Grid and be connected to the local distribution network.
History
- 2005 - CNOOC Zhejiang Ningbo LNG Co., Ltd was registered
- 2009 - Government approval was given for the project
- 2009 - Construction of the terminal started
- 2012 - First cargo delivered from Qatar
- 2020 - The teminal expansion was completed