CIMC ENRIC LNG References

From A Barrel Full
Jump to navigation Jump to search
  1. Zhejiang Ningbo LNG Terminal
    • Case name: storage tank of Zhejiang LNG Termina
    • Delivery time: 2009-2012
    • Application scope: Ningbo, Zhejiang
    • Description: The company participated in the Terminal and port construction of Zhejiang LNG Terminal and Supporting Gas Pipe Project of CNOOC and successfully delivered three concrete full-capacity tanks (160,000m3). The project was awarded “2013-2014 National Excellent Project Prize” by China Association of Construction Enterprise Management. TGE was awarded the Employer HSE Management Prize in two consecutive years during construction, and created the excellent quality control (QC) record, that is, zero accident in 5.25 million working hours. The project exceeds the strict quality requirements of the contract. For example, the one-time welding pass rate of 9% nickel steel liner reached 98%, ranking the first among all LNG projects.
  2. Shenzhen Diefu CNOOC LNG Terminal
    • Case name: CNOOC Shenzhen LNG Terminal EPC Project
    • Delivery time: 2015
    • Application scope: Dapeng, Shenzhen
    • Description: Shenzhen LNG Terminal project was mainly invested by CNOOC. The total investment was about RMB 8 billion. The receiving capacity is 4 million tons of LNG per year. The tank construction EPC project, i.e. turn-key project of four LNG full-capacity tanks (160,000m3) was completed by the joint venture established by TGE and Sinopec Ningbo Engineering Co., Ltd. TGE was responsible for the basic and detailed design of the tank bodies and foundations, the basic design of the pipes, steel structures, instruments and controllers beside the tanks, purchase and delivery of all imported materials and equipment, and management of the joint construction on site.


Case name: Snøhvit LNG export terminal of Statoil ASA Delivery time: 2006

Application scope: Melkøya Island, Hammerfest, Norway Description:

•The project includes the design, supply, component prefabrication, installation, construction, commissioning, start-up, storage and loading of the LNG, LPG and condensate export terminal.

•The LNG export capacity is 560 million m³ per year.

•The project includes two full-capacity LNG tanks (net capacity: 125,000 m³ each), one LPG tank (net capacity: 45,000 m³), one 75,000 m³ condensate tank and ships with the loading capacity of 160,000 m³.

  1. Qidong LNG Terminal
    • Guanghui Qidong LNG Receiving Terminal EPC (2017.06)
    • One 160,000m³ full containment LNG storage tank
    • One 50,000-ton LNG Wharf
    • 8 sets of LNG Tanker handling system
    • Processing capacity: 1.15 million tons/year



ENN Group Zhoushan LNG Receiving Terminal (2018.10) Two 160,000m³ full containment LNG storage tanks A wharf of 260,000m³ LNG ship and a wharf of 30,000m³ LNG ship; Fourteen Tanker handling systems Processing capacity: 3 million tons/year