Abarrelfull (talk | contribs) (Created page with "Summary Information Ownership: CNOOC Website: http://www.cnoocgas.com/ CNOOC LNG Terminals Location: Zhejiang Province, China Capacity: 3.0 million tons/annum Status: Commissi...") |
Abarrelfull (talk | contribs) |
||
(7 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | Summary Information | + | === Summary Information === |
− | Ownership: CNOOC | + | |
− | Website: http://www.cnoocgas.com/ | + | * Ownership: CNOOC |
− | CNOOC LNG Terminals | + | * Website: http://www.cnoocgas.com/ |
− | Location: Zhejiang Province, China | + | ** [[CNOOC LNG Terminals]] |
− | Capacity: | + | * Location: Zhejiang Province, China |
− | Status: | + | * Capacity: 6.0 million tons/annum |
− | Brief Description | + | * Status: In Operation |
− | + | ||
− | Technical Details | + | === Brief Description === |
− | Storage capacity: three 160,000m3 full containment LNG storage tanks | + | * An onshore regasification terminal with 6 tanks with a total capacity of 960,000 |
− | Unloading capacity: | + | * The terminal was expanded from 3.0 to 6.0 mtpa in 2020 |
− | Send out capacity: | + | |
− | Constructor: | + | === Technical Details === |
− | TGE Gas Engineering built the tanks | + | * Storage capacity: |
− | + | ** Phase 1: three 160,000m3 full containment LNG storage tanks | |
− | Ongoing Projects/Project Status | + | ** Phase 2: + three 160,000m3 full containment LNG storage tanks |
− | + | * Unloading capacity: | |
− | Suppliers / Customers | + | * Send out capacity: |
− | Suppliers: Qatargas is supplying the terminal | + | * Constructor: |
− | Customers: The regasified LNG will be fed into a proposed Zhejiang Natural Gas Grid and be connected to the local distribution network. | + | ** TGE Gas Engineering built the tanks |
− | History | + | |
− | 2005 - CNOOC Zhejiang Ningbo LNG Co., Ltd was registered | + | === Ongoing Projects/Project Status === |
− | 2009 - Government approval was given for the project | + | * The project was completed in [[LNG Terminal Projects Completed in 2012 | 2012]] |
− | 2009 - Construction of the terminal started | + | * The expansion was completed in 2020 |
− | 2012 - First cargo delivered from Qatar | + | |
− | Other Information | + | === Suppliers / Customers === |
− | - | + | * Suppliers: Qatargas is supplying the terminal |
− | + | * Customers: The regasified LNG will be fed into a proposed Zhejiang Natural Gas Grid and be connected to the local distribution network. | |
− | CNOOC Zhejiang Ningbo LNG Co., Ltd | + | |
− | CNOOC Clean Energy Business Progresses Well in Zhejiang and Fujian | + | |
− | TGE Gas Engineering, LNG Tank Ningbo | + | === History === |
− | Qatargas delivers commissioning cargo to Zhejiang LNG Terminal in the People’s Republic of China | + | * 2005 - CNOOC Zhejiang Ningbo LNG Co., Ltd was registered |
+ | * 2009 - Government approval was given for the project | ||
+ | * 2009 - Construction of the terminal started | ||
+ | * 2012 - First cargo delivered from Qatar | ||
+ | * 2020 - The teminal expansion was completed | ||
+ | |||
+ | === Other Information === | ||
+ | * - | ||
+ | |||
+ | === Links === | ||
+ | # [[CIMC ENRIC LNG References]] | ||
+ | # [http://www.cnoocgas.com/qidian/company.do?actionMethod=list_company&lang=1 CNOOC Zhejiang Ningbo LNG Co., Ltd] | ||
+ | # [http://killajoules.wikidot.com/archive:cnooc-clean-energy-business-progresses-well-in-zheji CNOOC Clean Energy Business Progresses Well in Zhejiang and Fujian] | ||
+ | # [http://www.tge-gas.com/sites/cms/tge/WebFiles/Referencesheet%205059.pdf TGE Gas Engineering, LNG Tank Ningbo] | ||
+ | # [http://killajoules.wikidot.com/blog:3158 Qatargas delivers commissioning cargo to Zhejiang LNG Terminal in the People’s Republic of China] |
Latest revision as of 13:12, 7 January 2022
Contents
Summary Information
- Ownership: CNOOC
- Website: http://www.cnoocgas.com/
- Location: Zhejiang Province, China
- Capacity: 6.0 million tons/annum
- Status: In Operation
Brief Description
- An onshore regasification terminal with 6 tanks with a total capacity of 960,000
- The terminal was expanded from 3.0 to 6.0 mtpa in 2020
Technical Details
- Storage capacity:
- Phase 1: three 160,000m3 full containment LNG storage tanks
- Phase 2: + three 160,000m3 full containment LNG storage tanks
- Unloading capacity:
- Send out capacity:
- Constructor:
- TGE Gas Engineering built the tanks
Ongoing Projects/Project Status
- The project was completed in 2012
- The expansion was completed in 2020
Suppliers / Customers
- Suppliers: Qatargas is supplying the terminal
- Customers: The regasified LNG will be fed into a proposed Zhejiang Natural Gas Grid and be connected to the local distribution network.
History
- 2005 - CNOOC Zhejiang Ningbo LNG Co., Ltd was registered
- 2009 - Government approval was given for the project
- 2009 - Construction of the terminal started
- 2012 - First cargo delivered from Qatar
- 2020 - The teminal expansion was completed
Other Information
- -