Difference between revisions of "Yadana Gas Field"

From A Barrel Full
Jump to navigation Jump to search
 
Line 33: Line 33:
 
# [http://www.total.com/en/about-total/our-businesses/upstream/exploration--production-a-promising-outlook/asia-pacific-922629.html Total: Exploration & Production Operations in Asia-Pacific]
 
# [http://www.total.com/en/about-total/our-businesses/upstream/exploration--production-a-promising-outlook/asia-pacific-922629.html Total: Exploration & Production Operations in Asia-Pacific]
 
# [http://www.pttep.com/en/ourBusiness_EAndPprojectsDetail.aspx?ContentID=20 Yadana Project, PTTEP]
 
# [http://www.pttep.com/en/ourBusiness_EAndPprojectsDetail.aspx?ContentID=20 Yadana Project, PTTEP]
# [[[Serimax Asia Pipeline References]]]
+
# [[Serimax Asia Pipeline References]]
# [[[Hyundai Heavy Industries Platform References]]]
+
# [[Hyundai Heavy Industries Platform References]]
# [[[Thai Nippon Steel Sumikin Engineering Construction Platform]]]
+
# [[Thai Nippon Steel Sumikin Engineering Construction Platform]]
# [[[Saipem Asia Pipeline References]]]
+
# [[Saipem Asia Pipeline References]]
 
# [http://killajoules.wikidot.com/archive:signing-of-amendment-agreement-to-the-yadana-export Signing of Amendment Agreement to the Yadana Export Gas Sales Agreement]
 
# [http://killajoules.wikidot.com/archive:signing-of-amendment-agreement-to-the-yadana-export Signing of Amendment Agreement to the Yadana Export Gas Sales Agreement]
 
# [http://killajoules.wikidot.com/archive:swiber-secures-maiden-myanmar-offshore-installation Swiber Secures Maiden Myanmar Offshore Installation Project Worth US$77.0 Million]
 
# [http://killajoules.wikidot.com/archive:swiber-secures-maiden-myanmar-offshore-installation Swiber Secures Maiden Myanmar Offshore Installation Project Worth US$77.0 Million]
 +
# [https://a-barrel-full.blogspot.com/2022/01/totalenergies-withdraws-from-myanmar.html TotalEnergies withdraws from Myanmar]

Latest revision as of 09:52, 26 January 2022

Summary Information

  • Operator: Total
  • Country: Myanmar
  • Location: offshore Blocks M5 and M6
  • Production start: 1998
  • Partners: Total E&P Myanmar - 31.24%, Unocal Myanmar Offshore (UMOL) - 28.26%, PTTEP International Limited (PTTEPI) - 25.5%, Myanma Oil and Gas Enterprise (MOGE) - 15%
  • Type: Gas
  • Estimated Reserves:
  • Production Volume:

+++ Description

  • Gas produced on the field is delivered primarily to PTT to be used in Thai power plants. The Yadana field also supplies the domestic market via a land pipeline and, since June 2010, via a sub-sea pipeline built and operated by Myanmar’s state-owned company MOGE.

+++ Contractors

  • **HHI:** EPIC: MP Compression Platform, Pile & Bridge : 8,120 Ton
  • **Swiber:** Offshore installation works for 150 kilometres gas pipelines
  • **Saipem:** Installation of pipelines
  • **Thai Nippon Steel Sumikin:**
    • Yadana Wellhead Platform & Modification Work
    • Yadana Production Platform Modification Work

+++ History

  • 1992 - Production sharing contract signed
  • 1998 - First production
  • 2006 - Gas sales contract increased
  • 2008 - Compression project completed
  • 2022 - Total announced it was withdrawing from the project

+++ Geology

Links

  1. Total: Exploration & Production Operations in Asia-Pacific
  2. Yadana Project, PTTEP
  3. Serimax Asia Pipeline References
  4. Hyundai Heavy Industries Platform References
  5. Thai Nippon Steel Sumikin Engineering Construction Platform
  6. Saipem Asia Pipeline References
  7. Signing of Amendment Agreement to the Yadana Export Gas Sales Agreement
  8. Swiber Secures Maiden Myanmar Offshore Installation Project Worth US$77.0 Million
  9. TotalEnergies withdraws from Myanmar