Serimax Asia Pipeline References

From A Barrel Full
Jump to navigation Jump to search
  1. Malikai Oil And Gas Field
    • Malaysia
    • SSPC
    • Technip Marine (G1201)
    • 2015
  2. Weizhou 12-1 Oil Field
    • China
    • Hilong
    • CNOOC
    • Weizhou PIP
    • 2015
  3. PingHuang
    • China
    • 2015
    • Hilong
    • CNOOC
    • PingHuang
  4. Maharaja Lela Jamalulalam Gas And Condensate Field
    • Brunei
    • SapuraAcergy (Sapura 3000)
    • Total
    • Maharaja Lela
    • 2015
  5. JDA B17
    • JDA Malaysia & Thailand
    • TL Offshore (LTS3000)
    • CPOC
    • JDA B17 (CPOC)
    • 2015
  6. H5
    • Vietnam
    • TL Offshore
    • HLJOC
    • 2015
  7. Kepodang Gas Field
    • Indonesia
    • TL Offshore
    • PGn
    • 2015


2015 TL Offshore (TBA) for Petrovietnam Thai Binh Project Vietnam 4 Saturnax stations 1,200 welds 12" (25.4 mm, X65) - Approx 15 km

2014 TL Offshore (SK1200) for Petrovietnam NCS-DH Vietnam 5 Saturnax stations 1,582 welds 16" (15.9 mm, X65) - 19.3 km 2,460 welds 26" (19.1 mm, X65) - 30.0 km 10,041 welds 26" (19.1 mm, X65) - 122.5 km

  1. Zawtika Gas And Condensate Field
    • Myanmar
    • COOEC
    • PTTEP
    • Zawtika Phase 1B
    • 2015


2014 Timas (DLB01) for PT Rekayasa Lampung Indonesia 4 Saturnax stations 1,311 welds 24" (14.3 mm) - 16 km

2014 TL Offshore (LTS3000) for BGEPIL BG India 4 Saturnax stations 328 welds 6" (15.9 mm, DNV 415 SD) - 4 km 2,488 welds 14" (19.1 mm, DNV 415 SD) - 30.36 km

  1. Block SK316 Gas Fields
    • Malaysia
    • Petronas
    • Technip (G1201)
    • 2014

2014 TL Offshore (tba) for TTM Eva Malaysia/Thailand 4 or 5 Saturnax stations 6,173 welds 24" (17.5 mm, X65) - 75.3 km 2014 PBJV (tba) for Petronas Dalak Malaysia 3 Saturnax stations 2,775 welds 16" (10.3 mm, X65) - 33.9 km

  1. Bumi Bulan And Suriya Gas Fields
    • Malaysia
    • Hess
    • Nippon Steel & Sumikin Eng. (Kuroshio II)
    • Bulan C
    • 2014
  2. Liwan 3-1 Gas Field
    • China
    • EMAS for Saipem
    • HOCL
    • 2014


2014 Swiber (PJW3000) for Cuu Long Joint Operating Com Su Tu Nau Project Vietnam 3 Saturnax stations 541 welds 12.75" (9.53 mm, X65) - 6.6 km 902 welds 6.625" (11.1 mm, X65) - 11 km 781 welds 6.625" (9.53 mm, X65) - 9.5 km 828 welds 18" (14.3 mm, X65) - 10 km 836 welds 10.75" (9.3 mm, X65) - 10.2 km 828 welds 10.75" (14.3 mm, X65) - 10 km 607 welds 14" (11.1 mm, X65) - 7.4 km

  1. Panyu 30-1 And Huizhou 21-1 Gas Fields
    • China
    • Technip (G1201) for COOEC
    • LH19
    • 2013

2013 TL Offshore (QP2000) for Murphy Oil MOC 2013 Project Malaysia 4 Saturnax stations PRPA to SAPA: 40 km 10" (12.7 mm, X52) SAPA to SEPA: 15.3 km 16" (12.7 mm, X52) SAPA to S. PLEM: 17 km 8" (12.7 mm, X52) BESA to SNPA: 8 km 16" (12.7 mm, X52) 2013 TL Offshore (E3) for EMEPMI Tapis & Damar Malaysia 3 Saturnax stations 3.9 km 14" (20.6 mm, DNV Gr450) 3.9 km 10" (18.3 mm, DNV Gr450) 4 km 6" (8.7 mm, DNV Gr450) 21 km 16" (11.1+3mm, DNV450 + Incoloy 825 liner + Overlay 625) 1 km 16" (14.3+3mm, DNV450 + Incoloy 825 liner + Overlay 625)

  1. Naga And Pelikan Gas Fields
    • Indonesia
    • Swiber
    • Premier Oil
    • Naga - GBCPP
    • 2013
  2. Bukit Tua Oil And Gas Field
    • Indonesia
    • PT Timas Suplindo
    • Petronas
    • Burkit Tua Development
    • 2013


2013 Swiber (Conquest) for Conoco Philips SBL Indonesia 1,476 welds 14" (11.1 mm) - 18 km 328 welds 8.625" (7.9 mm) - 3.9 km

2013 Van Oord Offshore (Stingray) for S-Oil Corporation S-Oil Pipeline Installati South Korea 3 Saturnax stations Subsea Pipeline-Flowline: 262 welds 42" (18.26 mm,) - 3.2 km

2013 Swiber (Resolute) for Total SSN Indonesia 4 Saturnax stations 492 welds 16" (17.5 mm) - 6 km 656 welds 16" (17.5 mm) - 8 km 286 welds 20" (17.5 mm) - 3.5 km

2013 Leighton Welspun Contractors for ONGC PRP3 India 4 Saturnax stations 663 welds 6.625" (7.9 mm, X60) - 8.08 km 303 welds 6.625" (7.9 mm, X60) - 3.68 km 319 welds 6.625" (7.9 mm, X60) - 3.88 km 290 welds 6.625" (7.9 mm, X60) - 3.53 km 758 welds 12.75" (15.9 mm, X60) - 9.24 km 1,077 welds 12.75" (15.9 mm, X60) - 13.13 km 448 welds 12.75" (15.9 mm, X60) - 5.45 km 762 welds 12.75" (14.3 mm, X60) - 9.30 km 634 welds 12.75" (14.3 mm, X52) - 7.72 km 203 welds 6.625" (11.0 mm, X60) - 2.47 km 216 welds 6.625" (11.0 mm, X60) - 2.62 km 228 welds 8.625" (12.7 mm, X52) - 2.77 km 476 welds 10.75" (14.3 mm, X60) - 5.80 km

  1. Bumi Bulan And Suriya Gas Fields
    • Malaysia/Thailand
    • Hess
    • Nippon Steel (Kuroshio 1)
    • Bulan-B & Bumi-D
    • 2013

2013 Swiber (Conquest) for Brunei Shell Petroleum BBO Brunei Bulan Bulan: 451 welds 16" (16 / 12.5 mm) - 5.5 km 451 welds 12" (18.5 / 16 mm) - 5.5 km Osprey: 1,459 welds 16" (20 / 16 mm) - 17.8 km 672 welds 10" (16 / 14.2 mm) - 8.2 km 2013 Van Oord Offshore (Stingray) for CPC CPC Shalung Project Taiwan 3 Saturnax stations 381 welds 42" (22.2 mm) - 4.64 km

  1. Zawtika Gas And Condensate Field
    • Myanmar
    • Larsen & Toubro
    • PTTEPI
    • 2012

2012 Swiber (1MAS) for ONGC CL7 India 4 Saturnax stations WO-24 to B192-1: 1,484 welds 8" (12.7 mm) - 18.1 km WO-24 to B192-5: 2,099 welds 10" (12.7 mm) - 25.6 km B192-1 to B192-5: 598 welds 14" (15.9 mm) - 7.3 km B192-5 to B192-1: 762 welds 6" (7.9 mm) - 9.3 km B192-5 to B192-1: 672 welds 6" (11.0 mm) - 8.2 km B192-5 to B192-8: 828 welds 6" (7.9 mm) - 10.1 km B192-5 to ICG : 3,787 welds 16" (17.5 mm) - 46.2 km PLEM to B192-5 : 131 welds 6" (11.1 mm) - 1.6 km B192-5 to PLEM: 131 welds 12" (14.3 mm) - 1.6 km B192-5 to PLEM: 131 welds 10" (12. 7 mm) - 1.6 km B192-8 to B192-5: 869 welds 12" (14.3 mm) - 10.6 km PLEM to B192-5: 131 welds 10" (12.7 mm) - 1.6 km PLEM to B192-5: 131 welds 6" (7.9 mm) - 1.6 km BHE to SHP: 975 welds 12" (14.3 mm) - 11.9 km MNW to N-15: 525 welds 12" (11.1 mm) - 6.4 km B192-5 to PLEM: 131 welds 12" (14.3 mm) - 1.6 km All sour service

  1. Liwan 3-1 Gas Field
    • China
    • COOEC (HYSY 201)
    • Husky
    • Liwan Deep Water
  2. Ruby Gas Field
    • Indonesia
    • Swiber
    • Pearl Oil
    • RUBY Export line
    • 2012
  3. Sarawak Oil Project
    • Malaysia
    • TL Offshore
    • MOC
    • Serendah & Patricia - WPPA to PTSA Multiphase pipeline, SNPA to WYE2 gas pipeline & SNPA to WYE1 crude/condensate pipeline
    • 2012
  4. Liwan 3-1 Gas Field
    • China
    • COOEC
    • Technip (G1201)
    • 2012
  5. Weizhou 12-1 Oil Field
    • China
    • COOEC
    • CNOOC
    • WZ 12-1 - pipe-in-pipe
    • 2012
  6. South Mahakam Gas Condensate Fields
    • Indonesia
    • Total
    • Geocean
    • 2012
  7. Falah Oil Field
    • UAE (Dubai)
    • Technip
    • Dubai Petroleum
    • 2012
  8. Ruby Gas Field
    • Indonesia
    • Geocean
    • Total
    • 2012
  9. Telok Gas Field
    • Malaysia
    • TL Offshore
    • EMEPMI
    • Guntong-E to Telok-A Pipeline
    • 2012
  10. Tapis Oil Field
    • Malaysia
    • TL Offshore
    • EMEPMI
    • 2012
  11. Zawtika Gas And Condensate Field
    • Myanmar
    • Swiber
    • PTTEP
    • 2012
  12. Cakerawala Gas Field
    • Malaysia/Thailand
    • TL Offshore
    • Hess
    • Bumi-B & Cakerawala-D
    • 2012
  13. Danau Bubut Gas Field
    • Brunei
    • Swiber
    • Brunei Shell Petroleum
    • 2012
  14. South Natuna Sea Block B PSC Oil And Gas Fields
    • Indonesia
    • PT Timas
    • Conoco Phillips
    • Bawal
    • 2012
  15. Liuhua 11-1 Oil Field
    • China
    • SASB
    • CNOOC
    • LH4 Project
    • 2012
  16. Lufeng 13-1 Oil Field
    • China
    • Swiber (PJW3000)
    • Offshore Oil Engineering Co.
    • LF13
    • 2011
  17. F28 Gas Field
    • Malaysia
    • TL Offshore
    • Shell & Petronas
    • 2011
  18. Tapti Gas Fields
    • India
    • Swiber
    • ONGC
    • North Tapti
    • 2011
  19. Tinggi-A/Tiong-A
    • Malaysia
    • Global Industries
    • NewField
    • 2011
  20. Berantai Gas Field
    • Malaysia
    • TL Offshore
    • Petrofac
    • ANDR-A to PLET Gas Export Pipeline
    • 2011
  21. F23 Gas And Condensate Field
    • Malaysia
    • TL Offshore
    • Shell & Petronas
    • 2011
  22. Kumang Cluster Gas And Condensate Fields & Kinabalu Oil Fields
    • Malaysia
    • Global Industries
    • PCSB
    • PA11 - DLB264
    • 2011
  23. Terang Sirasun Batur Gas Fields
    • Indonesia
    • Timas
    • Migas
    • Terang Sirasun Batur
    • 2011
  24. Heera Oil Field
    • India
    • Swiber
    • ONGC
    • B-193 / D1
    • 2011
  25. Gumusut Kakap Oil Field
    • Malaysia
    • SapuraAcergy
    • Shell
    • Gumusut J-Lay
    • 2011
  26. PL Pipeline
    • India
    • Swiber
    • British Gas
    • 2010
  27. Gumusut Kakap Oil Field
    • Malaysia
    • SapuraAcergy
    • Shell
    • Gumusut S-Lay
    • 2010
  28. Mumbai High Oil Field
    • India
    • Swiber
    • ONGC
    • MHNRD
    • 2010
  29. Yadana Gas Field
    • Myanmar
    • Swiber
    • Myanma Oil & Gas Enterprise
    • 2010
  30. Petronas Package C-20
    • Malaysia
    • TL Offshore
    • EMEPMI
    • 2010
  31. Petronas Package B-20
    • Malaysia
    • TL Offshore
    • Murphy Oil
    • 2010
  32. Selangkir Gas Field
    • Brunei
    • Swiber
    • BSP
    • Selangkir
    • 2010


2010 Global Industries (DLB264) for PCSB Petronas Package A-20 Malaysia 4 Saturnax stations 4,264 welds 24" (14.3 mm, X65) - Sour service 2,320 welds 24" (14.3 mm, X65) - Sour service 1,451 welds 16" (11.9 mm, X65) - Sour service

2010 PBJV (Faulkner) for PCSB Kumang Shore Approac Malaysia 3 Saturnax stations 467 welds 28" (17.5 mm, X65) 40 welds 28" (23 mm, X65)

2009 Cal Dive (DLB Sea Horizon) for COOEC Bohai China 4 Saturnax stations 1,088 welds 12" (12.7 mm, X65) - 13 km 533 welds 10" (11.1 mm, X65) - 6.5 km 84 welds 8" (12.7 mm, X65) - 1 km 3,550 welds 8" (9.5 mm, X65) - 43 km

  1. Grissik Batam Singapore Gas Pipeline
    • Indonesia
    • Global Industries
    • Transgasindo TGI
    • 2009

4 Saturnax stations 1737 welds 28" (15.9 mm, X65) - 23 km

2009 Cal Dive (DLB Sea Horizon) for HOEC PY-1 India 4 Saturnax stations 4,376 welds 14" (12.7 mm, X60) - 53 km

2009 Swiber (Swiber Conquest) for Alam Maritime West Lutong Malaysia 4 saturnax stations 11 km 18" (17.5 mm, X65)

2009 Cal Dive (Sea Horizon) for COOEC Weizhou China 1 Saturnax station + 3 STT-GSFCAW Pipe-in-pipe lines -

  • WZ6-8 WHPA to WZ12-1 WHPB (4.2 km)

Inner pipe : 6.625" (11 mm, X65) Outer pipe : 10.75" (11.1 mm, X65)

  • WZ12-1PAP to WZIT (32.3 km) Inner pipe : 16" (17.5 mm, X65)

Outer pipe : 22" (12.7 mm, X60)

2009 Swiber (Swiber Conquest) for BSP Mol & Bugan Brunei 4 Saturnax stations MOL Scope : 74.2 km 24" (14.2 mm, HF ERL 450 MC) 4.0 km 24" (20.0 mm, LSAW 450 MC) BUGAN scope : 2.7 km 12" (14.2 mm, HF ERWL 450 MC) 2.7 km 16" (14.2 mm, HF ERWL 450 MC) 2009 TL Offshore (Sapura 3000) for CPOC CPOC Malaysia 4 Saturnax stations JKA to MDPP : 24 km 24" (15.9 mm) 9 km 24" (19.1 mm) 1 km 24' (22.2 mm) MDB to MDPP : 1 km 18" (20.6 mm) 7.2 km 18' (15.9 mm) MDC to MDPP : 2 km 18" (20.6 mm) 1.3 km 18" (15.9 mm) MDPP to FSO : 3.2 km 8.625" (9.5 mm)

2008 Swiber (Swiber Conquest & HD60) for Kodeco & Shell Brunei (BSP) APECS 2007 (Kodeco/B Indonesia & Brunei 3 Saturnax stations BSP lines: 112 welds 6.625" (10 mm, X60) 604 welds 8.625" (12.7 mm, X60) 1,213 welds 10.75" (10 mm, X60) 494 welds 8.625" (12.7 mm, X60) 1,214 welds 12" (14.3 mm, X60) 358 welds 12" (14.3 mm, X60) 497 welds 12" (14.3 mm, X60) Kodeco lines: 502 welds 12.75" (12.7 mm, X52) 1,645 welds 16" (11;1 mm, X52) 3,837 welds 16" (12.7 mm, X52) 69 welds 16" (14.3 mm, X52) Puteri lines: 1,086 welds 8.625" (9.5 mm, X65) 1,087 welds 8.625" (9.5 mm, X65) Talisman line: 2,791 welds 24" (12.7 mm, X65)

  1. Sarawak Gas Project
    • Malaysia
    • Murphy
    • Swiber (Swiber Conquest)
    • Golok
    • 2008
  1. D35, D21, J4, PSC Oil And Gas Fields
    • Malaysia
    • PCSB
    • TL Offshore (Sea Horizon+ Sapura 3000)
    • D35R-A to J4DP-A
    • 2008

2008 Swiber for BG India BG Hydra India SMAW & GTAW Qualifications only : 504 joints 12" (15.4 mm, SMLS 415 I SD, nonsour) 1,098 joints 14" (16.4 mm, SMLS 415 I SD, nonsour) 12 joints 4.5" (6.4 mm, X65 Coil, piggy-back) 25 joints 4.5" (6.4 mm, X65 Coil, piggy-back) 6 joints 1.25" (4.8 mm, X65 Coil, piggy-back) 14 joints 1.25" (4.8 mm, X65 Coil, piggy-back)

2008 TL Offshore (Lewek Champion) for PCSB Lewek 2008 Malaysia 4 welding stations 3.3 km 18" (15.9 and 20.6 mm, X65) 8.2 km 18" (15.9 and 20.6 mm, X65) 34 km 24" (15.9 / 19.1 / 22.2 mm, X65) 2008 Swiber (Swiber Conquest) for Conoco Philips North Belut Indonesia 3 or 4 Saturnax stations 37 km 10.75"(11.1 mm, X65) 37km 16" (11.9 mm, X65) 10 km 22" (15.9 mm, X70)

  1. Kikeh Oil Field
    • Malaysia
    • Murphy Oil
    • SapuraAcergy (Sea Horizon & Sapura 3000)
    • Kikeh Gas Pipeline
    • 2008


2007 Global Industries (DLB264) for BGEPIL Tapti Expansion India 4 Saturnax stations 1,743 welds 20" (19.1 mm, X60) - 22 km 6,114 welds 20" (15.9 mm, X60) - 75 km 308 welds 20" (15.9 mm, X60) - 4 km

2007 TL Offshore (Sea Horizon) for PCSB & EMEPMI

TLO 2007 Malaysia 3 Saturnax stations PCSB : 1,533 welds 18" (Betty to Barinia) 1,082 welds 8" (Penara to Puteri) 1,082 welds 8" (Puteri to Penara) 722 welds 12" (ANDP-D to ANDR-A) 722 welds 10" (ANPG-A to ANDP-D) EMEPMI : 434 welds 16" CRA Inconel (Jerneh A to Jerneh B)

  1. Tabu Oil and Gas Field
    • Malaysia
    • ExxonMobil
    • TL Offshore (DLB264)
    • 2006

2006 TL Offshore (Sea Horizon) for Petronas Carigali (PCSB) PCSB 2006 Malaysia 3 Saturnax stations SFK-A to SJP-A : 1,475 welds 8.625" (10.0 mm, X65) 82 welds 8.625" (11.1 mm, X65) SJP-A to SFP-A : 1,557 welds 20" (15.9 mm, X65) West Lutong : 738 welds 18" (12.7 mm, X65) 82 welds 18" (14.3 mm, X65)

2006 Geocean (Mariam) for Total Sisi Nubi Indonesia 2 Saturnax stations 19.4 km 26" (18.3 mm, X65) - 1,557 welds

2006 IOEC (Abouzar 1200) for IOCL Paradip India 4 Saturnax stations 1,596 welds 48" (20.6 mm, X65) - 19.7 km

2006 Nippon Steel (Kuroshio II) for Perusahaan Gas Negara South Sumatra West Ja Indonesia 4 Saturnax stations 3,248 welds 32" (22.2 mm, X65) - 40 km 3,904 welds 32" (19.05 mm, X65) - 49 km

2006 TL Offshore (DLB264) for Sarawak Shell B12 Malaysia (Sarawak) 3 Saturnax stations 0.810 km 14" (22.5 mm X65 + 3 mm Inconel 825) 8.930 km 14" (15.2 mm X65 + 3 mm Inconel 825)

2005/ 2006 Global Industries (Hercules) for CNOOC Panyu China 4 Saturnax stations Year 2005 : 109 welds 12" (12.7 mm, X65) 8,697 welds 20.62" (14.3 mm, X65) - Buckle arrestors Year 2006 : 5,486 welds 20.62" (14.3 mm, X65) - Buckle arrestors

2005 Hyundai Heavy Industries (HD-60) for ONGC MUT India 4 Saturnax stations 5,205 DJ 28" (17.5 mm, X60) - 119 km 7,172 DJ 30" (17.5 mm, X60) - 182 km

2005 TL Offshore (KP1 McDermott) for Petronas Carigali (PCSB) PCSB 2005 Malaysia 3 Saturnax stations PCSB Semarang : 48 km 20" (11.1 mm, X65) PCSB MCOT Project : 2,787 welds 16" (12.7 mm) 82 welds 16" (14.3 mm) 820 welds 10.75" (11.1 mm) 148 welds 10.75" (11.1 mm) 2005 TL Offshore (DLB264) for Shell Sarawak Shell 2005 Malaysia

  1. Jintan And Serai Gas Fields
    • Malaysia
    • Shell Sarawak Berhad
    • Nippon Steel (Kuroshio II)
    • Jintan
    • 2004
  2. Chunxiao Gas Field
    • China
    • Hyundai Heavy Industries
    • CNOOC
    • Chunxiao
    • 2004

2004 TL Offshore (DLB264) for Petronas Carigali PCSB / EPMI Scope 200 Malaysia 4 Saturnax stations 33 km 16" (16 mm, X52) for EPMI - 2,705 welds

  1. Jintan And Serai Gas Fields
    • Malaysia
    • Shell Sarawak
    • Global Industries (DLB264)
    • Serai
    • 2004


2003 Horizon Offshore (Sea Horizon) for Petronas MSE Malaysia 3 Saturnax stations 122 welds 12.75" (15.9 mm, X65) 1,480 welds 12.75" (11.1 mm, X65) 122 welds 8.625" (12.7 mm, X65) 1,432 welds 8".625 (9.5 mm, X65)

2003 TL Offshore (DLB264) for Petronas Carigali MLNG-3 2003 Malaysia 4 Saturnax stations 9,471 welds 32" (16.5 mm, X65) - 116 km 40 welds 32" (23.4 mm, X70) - 0.5 km 3,283 welds 24" (12.8 mm, X65) - 39 km 40 welds 24" (17.5 mm, X65) - 0.5 km 40 welds 24" (21.3 mm, X65) - 0.5 km

2003 Horizon Offshore (Sea Horizon) for Shell Heavy Lift Brunei 3 Saturnax stations 122 welds 20" (20.6 mm, X60) - 1.5 km 1,863 welds 20" (14.3 mm, X60) - 23 km 223 welds 20" (12.7 mm, X60) - 2,7 km 142 welds 16" (15.9 mm, X60) - 1.7 km 1,703 welds 10.75" (11.1 mm, X60) - 20 km

2003 Hyundai Heavy Industries (HD423) for KNOC Dong-Hae South Korea 4 Saturnax stations 4,807 welds 14" (12.7 mm, X65) - 58 km

  1. Bonan Block Oil and Gas Fields
    • China
    • COOEC
    • CNOOC
    • 2003
  2. Kinarut Gas Field
    • Malaysia
    • Petronas Carigali
    • Nippon Steel (Kuroshio II)
    • Bunga Raya & Kinarut
    • 2003
  3. Dongfang Gas Field
    • China
    • COOEC for CNOEC
    • Dong Fang
    • 2003

2002 Hyundai Heavy Industries (HD2500) for Shell East HP Gas Expansion Brunei 4 Saturnax stations 820 welds 14" (15.9 mm, X60) - 10km 5,262 welds 28" (12.7 mm, X60) - 64.2 km 328 welds 28" (13.8 mm, X60) - 4 km

  1. Jintan And Serai Gas Fields
    • Malaysia
    • Petronas/Shell Sarawak
    • Nippon Steel (Kuroshio II)
    • 2002
  2. Malaysia LNG Terminal
    • Malaysia
    • 2002
    • TL Offshore/Global Industries (DLB264)
    • Petronas Carigali
    • Bintulu/MNLG-3
  3. Seligi And PM8 Oil And Gas Fields
    • Malaysia
    • Petronas
    • TL Offshore (DB30)
    • Angsi (Seligi)
    • 2001
  4. Fairley Oil And Gas Field
    • Brunei
    • Global Industries (DLB264)
    • Shell
    • Ampa Fairley
    • 2001
  5. F23 Gas And Condensate Field
    • Malaysia
    • Shell Sarawak Berhad
    • Global Asia Pacific (DLB264)
    • F23 SW & M4
    • 2001
  6. Angsi Oil And Gas Field
    • Malaysia
    • Petronas
    • TL Offshore (Kuroshio II)
    • 2000
  7. Resak Gas Field
    • Malaysia
    • Petronas
    • TL Offshore (DB26)
    • 1999

1999 Hyundai Heavy Industries (HD423) for China Petroleum Corp. Yung-An to Tung-Hsiao Taiwan 4 Saturnax stations (1 with 4 bugs) 238 km 36" (14.3 to 20.6 mm, X65)

  1. Sangu Gas Field
    • Bangladesh
    • McDermott-ETPM
    • Cairn Energy
    • 1997

1990 ETPM (DLB801) for ONGC Bombay High India Saturne 8T + Saturnax 78 km 24" (20.6 mm, X60) 78 km 26" (22.2 mm, X60)