Difference between revisions of "Wingate Gas Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: Wintershall * Country: UK * Location: * Production start: 2011 * Partners: * Type: Oil / Gas * Estimated Reserves: * Production Volume: +...") |
Abarrelfull (talk | contribs) |
||
(One intermediate revision by the same user not shown) | |||
Line 1: | Line 1: | ||
− | Summary Information | + | === Summary Information === |
− | * Operator: | + | * Operator: Harbour Energy |
* Country: UK | * Country: UK | ||
− | * Location: | + | * Location: Southern North Sea |
* Production start: 2011 | * Production start: 2011 | ||
* Partners: | * Partners: | ||
Line 9: | Line 9: | ||
* Production Volume: | * Production Volume: | ||
− | + | === Description === | |
* The field uses a Remote-controlled platform | * The field uses a Remote-controlled platform | ||
− | * The natural gas extracted from a depth of 3,700 meters will be transported via pipeline to the GDF SUEZ [[D15 Gas Fields | platform D15-A]], situated 20 kilometers away in the Dutch North Sea. From this facility it will flow over a distance of about 300 kilometers to the Dutch mainland near Uithuizen. | + | * The natural gas extracted from a depth of 3,700 meters will be transported via pipeline to the GDF SUEZ [[D15 Area Gas Fields | platform D15-A]], situated 20 kilometers away in the Dutch North Sea. From this facility it will flow over a distance of about 300 kilometers to the Dutch mainland near Uithuizen. |
− | + | === Contractors === | |
* **Seaway Heavy Lifting:** Installation of Wingate Satellite Platform | * **Seaway Heavy Lifting:** Installation of Wingate Satellite Platform | ||
* **Acergy:** Subsea installation | * **Acergy:** Subsea installation | ||
− | + | === History === | |
* 2004 - Wintershall was allocated the concession block 44/24b as part of the 22nd UK offshore licensing round | * 2004 - Wintershall was allocated the concession block 44/24b as part of the 22nd UK offshore licensing round | ||
* 2008 - The natural gas field was discovered | * 2008 - The natural gas field was discovered | ||
* 2010 - Project development approved by UK Goverment | * 2010 - Project development approved by UK Goverment | ||
* 2011 - First gas produced | * 2011 - First gas produced | ||
+ | * 2023 - Harbour Energy acquired Wintershall's stake | ||
− | + | === Geology === | |
* | * | ||
− | + | === Links === | |
# [[Seaway Heavy Lifting Oil And Gas References]] | # [[Seaway Heavy Lifting Oil And Gas References]] | ||
# [[Serimax Pipeline References]] | # [[Serimax Pipeline References]] | ||
# [http://killajoules.wikidot.com/archive:natural-gas-production-launched-in-british-north-sea Natural gas production launched in British North Sea] | # [http://killajoules.wikidot.com/archive:natural-gas-production-launched-in-british-north-sea Natural gas production launched in British North Sea] | ||
+ | # [https://a-barrel-full.blogspot.com/2023/12/transformational-acquisition-of.html Transformational acquisition of Wintershall Dea asset portfolio] | ||
+ | |||
+ | [[category:Field]] | ||
+ | [[category:UK]] | ||
+ | [[category:Ineos]] |
Latest revision as of 12:33, 8 February 2024
Summary Information
- Operator: Harbour Energy
- Country: UK
- Location: Southern North Sea
- Production start: 2011
- Partners:
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
Description
- The field uses a Remote-controlled platform
- The natural gas extracted from a depth of 3,700 meters will be transported via pipeline to the GDF SUEZ platform D15-A, situated 20 kilometers away in the Dutch North Sea. From this facility it will flow over a distance of about 300 kilometers to the Dutch mainland near Uithuizen.
Contractors
- **Seaway Heavy Lifting:** Installation of Wingate Satellite Platform
- **Acergy:** Subsea installation
History
- 2004 - Wintershall was allocated the concession block 44/24b as part of the 22nd UK offshore licensing round
- 2008 - The natural gas field was discovered
- 2010 - Project development approved by UK Goverment
- 2011 - First gas produced
- 2023 - Harbour Energy acquired Wintershall's stake