D15 Area Gas Fields

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Operator: Neptune
  • Country: Netherlands
  • Location:
  • Production start:
  • Partners:
  • Type: Oil / Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • The D15-A platform is a major treatment and compression complex located 195 km from Den Helder on the Dutch coast. It was installed in 1999 at a water depth of 40 metres. The platform accumulates gas from fields in both the Dutch and the British North Sea sectors. It includes a dehydration facility and two gas compressor units. POB capacity is 24 people.
  • The D15-A platform treats and compresses gas produced by Wingate Gas Field, a third-party-operated field in the UK sector.
  • The various satellite platforms in the area are K9ab-A, K9ab-B, K9c-A, K2b-A, K12-B and D18a-A.
  • Since 2020 gas from the Sillimanite Gas Field has been processed at the platform
  • The gas produced in the area is transported via the Noordgastransport NGT Gas Pipeline offshore pipeline

Contractors

  • -

History

  • 2009 - the E17-A platform was installed
  • 2019 - the E17a-A6 well came onstream
  • 2020 - First gas from Sillimanite

Geology

Links

  1. Platforms Netherlands Continental Shelf
  2. KWsubsea Upheaval Buckling And Out Of Straightness Analysis
  3. Serimax Europe Pipeline References