Difference between revisions of "White Cliffs Pipeline"

From A Barrel Full
Jump to navigation Jump to search
 
Line 1: Line 1:
Summary Information
+
=== Summary Information ===
  
 
* Source: Platteville, Colo
 
* Source: Platteville, Colo
Line 6: Line 6:
 
* Website: http://www.semgroupcorp.com/
 
* Website: http://www.semgroupcorp.com/
 
* Length: kilometres (526 miles)  
 
* Length: kilometres (526 miles)  
* Capacity: 70,000  barrels of oil per day  
+
* Capacity: 150,000  barrels of oil per day  
 
* Crude Type:
 
* Crude Type:
  
+++ The Route
+
=== The Route ===
  
 
* The crude oil pipeline, originates in Platteville, Colo., northeast of Denver, and terminates at SemCrude’s storage facility in Cushing, Okla
 
* The crude oil pipeline, originates in Platteville, Colo., northeast of Denver, and terminates at SemCrude’s storage facility in Cushing, Okla
 
* The White Cliffs Pipeline is a very strategic asset and the only pipeline that directly transports crude oil from the DJ Basin to Cushing, OK.
 
* The White Cliffs Pipeline is a very strategic asset and the only pipeline that directly transports crude oil from the DJ Basin to Cushing, OK.
  
+++ Pipeline Status
+
=== Pipeline Status ===
* Operational
+
* Operational  
* White Cliffs is considering an expansion of capacity from Platteville, Colorado to Cushing, Oklahoma. The Expansion Project would provide extra capacity for the transportation of approximately 80,000 bpd of crude petroleum increasing the pipeline capacity from approximately 70,000 bpd to about 150,000 bpd
+
** An Expansion Project completed in 2014 provided extra capacity for the transportation of approximately 80,000 bpd of crude petroleum increasing the pipeline capacity from approximately 70,000 bpd to about 150,000 bpd
  
+++ History
+
=== History ===
 
* 2007 - Construction started by ENGlobal
 
* 2007 - Construction started by ENGlobal
 
* 2009 - Commercial operations commence
 
* 2009 - Commercial operations commence
Line 26: Line 26:
 
* 2012 - Successful open season completed
 
* 2012 - Successful open season completed
 
* 2013 - Rose Rock Midstream agreed to acquire a 33.3 percent interest
 
* 2013 - Rose Rock Midstream agreed to acquire a 33.3 percent interest
 +
* 2014 - Second pipeline increased capacity to 150,000 from 70,000 bpd
  
 
+
=== Other Information ===
+++ Other Information
 
  
 
* -
 
* -
  
+++ Links
+
=== Links ===
 
# [[EIA Liquids Pipeline Projects 2010-2014]]
 
# [[EIA Liquids Pipeline Projects 2010-2014]]
 
# [http://www.semgroupcorp.com/operationsandcommodities/crudeoil/semcrude/whitecliffspipeline.aspx Pipeline Webpage]
 
# [http://www.semgroupcorp.com/operationsandcommodities/crudeoil/semcrude/whitecliffspipeline.aspx Pipeline Webpage]

Latest revision as of 11:15, 15 February 2024

Summary Information

  • Source: Platteville, Colo
  • Destination: Cushing, Okla
  • Ownership: Sem Group
  • Website: http://www.semgroupcorp.com/
  • Length: kilometres (526 miles)
  • Capacity: 150,000 barrels of oil per day
  • Crude Type:

The Route

  • The crude oil pipeline, originates in Platteville, Colo., northeast of Denver, and terminates at SemCrude’s storage facility in Cushing, Okla
  • The White Cliffs Pipeline is a very strategic asset and the only pipeline that directly transports crude oil from the DJ Basin to Cushing, OK.

Pipeline Status

  • Operational
    • An Expansion Project completed in 2014 provided extra capacity for the transportation of approximately 80,000 bpd of crude petroleum increasing the pipeline capacity from approximately 70,000 bpd to about 150,000 bpd

History

  • 2007 - Construction started by ENGlobal
  • 2009 - Commercial operations commence
  • 2010 - SemCrude, L.P. Announces Sale of White Cliffs Pipeline Ownership Shares to Noble Energy & Anadarko
  • 2011 - SemCrude Announces Project to Expand its Platteville Truck Unloading Terminal
  • 2012 - Open season launched for expansion
  • 2012 - Successful open season completed
  • 2013 - Rose Rock Midstream agreed to acquire a 33.3 percent interest
  • 2014 - Second pipeline increased capacity to 150,000 from 70,000 bpd

Other Information

  • -

Links

  1. EIA Liquids Pipeline Projects 2010-2014
  2. Pipeline Webpage
  3. ENGlobal Corporation Announces White Cliffs Pipeline Project Award
  4. SemCrude, L.P. Announces Sale of White Cliffs Pipeline Ownership Shares
  5. SemGroup’s White Cliffs Pipeline Begins Commercial Operation
  6. SemCrude Announces Project to Expand its Platteville Truck Unloading Terminal
  7. White Cliffs Pipeline L.L.C. Announces Binding Open Season to Expand Capacity on White Cliffs Pipeline
  8. White Cliffs Pipeline, L.L.C. Completes Successful Open Season for Expansion Project
  9. Rose Rock Midstream Agrees to Acquire Interest in White Cliffs Pipeline From SemGroup Corporation