EIA Liquids Pipeline Projects 2010-2014

From A Barrel Full
Jump to navigation Jump to search
  1. Hawthorn Pipeline Hawthorn Oil Transportation New Completed 2010 Q1 18 12 CRD 90,000 Carries crude from a rail facility in Stroud to Cushing (both in Oklahoma).
  2. Keystone Pipeline
    • TC Energy
    • New - Completed- Q2 - 2010
    • 1,853 miles, 30 inch
    • Crude - 435,000 bpd
    • Goes from Hardisty in Alberta, Canada, down through Steele City, Nebraska, and to Patoka, Illinois.
  3. Freedom Pipeline Energy Transfer Partners New Completed 2011 Q3 43 8 HGL Y-grade 40,000 Connects LaGrange/Chisholm plant complex to West Texas Gateway pipeline.
  4. Liberty Pipeline (NGL) Energy Transfer Partners New Completed 2011 Q3 93 12 HGL Y-grade 90,000 Provides connectivity between Freedom/Liberty Pipelines and fractionators at Mont Belvieu, Texas, and Sweeny, Texas.
  5. Sterling NGL Pipeline Pipeline I expansion
    • OneOK
    • Expansion - Completed - Q4 - 2011
    • HGL - Propane, butanes - 15,000 bpd
    • Installation of seven additional pump stations along the existing Sterling I natural gas liquids product distribution pipeline.
  6. Mesa Pipeline System expansion Plains All American Expansion Completed 2011 Q3 80 CRD 420,000 Feeder for West Texas Gulf System and Basin Pipeline.
  7. White Cliffs Pipeline
    • SemGroup; Plains All American; Anadarko; Samedan Pipe Line
    • line 1 expansion - Completed - Q3 - 2011
    • 527 miles, 12 inch
    • Crude - 40,300 bpd
    • Capacity increased from 29,700 b/d to about 70,000 b/d.
  8. Keystone Pipeline
    • TC Energy
    • Cushing extension - Completed - Q1 - 2011
    • 298 miles, 30 inch
    • Crude - 156,000 bpd
    • Extended existing pipeline from Steele City, Nebraska, to Cushing, Oklahoma, and brought capacity of the entire system up to 591,000 b/d.
  9. Overland Pass NGL Pipeline
    • Williams; OneOK
    • Expansion - Completed - Q2 - 2011
    • 1035 miles, 16 & 24 inch
    • NGLs - 35,200 bpd
    • Pump stations added Q1 2010 and Q2 2011. Capacity increased from 109,800 b/d to 145,000 b/d.
  10. Seaway Crude Oil Pipeline
    • Enbridge; Enterprise Products Partners
    • Reversal - Completed - Q2 - 2012
    • 500 miles, 30 inch
    • Crude - 150,000 bpd
    • Reversal of the existing Seaway Pipeline so that it now flows north to south.
  11. Justice NGL Pipeline
    • Energy Transfer Partners
    • New - Completed - Q4 - 2012
    • 127 miles, 20 inch
    • NGLs - 375,000 bpd
    • Provides connectivity between Freedom/Liberty Pipelines and West Texas Gateway Pipeline and fractionators at Mont Belvieu, Texas, and Sweeny, Texas.
  12. Ohio River Valley Pipeline EnLink New Completed 2012 200 8, 6 CRD 10,000 About 120 miles of 8-inch pipeline in Ohio (capacity 10,000 b/d) and about 80 miles of 6-inch pipeline in West Virginia (capacity 7,000 b/d).
  13. Eagle Ford JV Pipeline System
    • Enterprise Products Partners; Plains All American
    • New - Completed - 2012
    • 175 miles
    • Crude - 300,000 bpd
    • Began partial service in the second half of 2012, with full service by the end of 2013. 140-mile segment from Gardendale to Three Rivers and then on to Corpus Christi (all in Texas). A 35-mile segment goes from Three Rivers to Enterprise's Lyssy Station in Wilson County, Texas.
  14. Kinder Morgan Crude and Condensate (KMCC) Pipeline Kinder Morgan Conversion, Expansion Completed 2012 Q2 264 24, 12 CRD 300,000 Converted 109 miles of natural gas pipeline to flow liquids, and the rest was new pipeline. Initially originated in Dewitt county and went to Houston (both in Texas). The 27-mile (12-inch diameter) Sweeney Lateral came online in January 2014 and created a new endpoint at the Sweeney Refinery in Old Ocean, Texas. The 15-mile (24-inch diameter) Gonzales Extension came online in March 2014 and created a new origin in Gonzales County, Texas. The 30-mile (24-inch diameter) Helena Extension came online in September 2014 and created a new origin in Karnes County, Texas (which was connected to the Double Eagle Pipeline in 2015). The 10-mile (10-inch diameter) Marshall Lateral came online in December 2015 and extended the Gonzales County origin northeast into Gonzales County.
  15. Roxpat (Roxanna-to-Patoka) conversion Marathon Pipeline (MPLX) Conversion Completed 2012 Q1 57 12 CRD 84,000 Converted from a refined product pipeline. Leased from a third party by MPLX.
  16. Romulus-to-Detroit Pipeline Marathon Pipeline (MPLX) New Completed 2012 Q4 17 16 CRD 180,000 Samaria-to-Detroit pipeline and Romulus-to-Detroit pipeline together make up the Detroit Crude System.
  17. Patoka-to-Catlettsburg Pipeline expansion Marathon Pipeline (MPLX) Expansion Completed 2012 406 24, 22 CRD 14,000 Capacity increased from 256,000 b/d to 270,000 b/d. 20-inch diameter from Patoka to Owensboro, Kentucky (140 miles), 24-inch diameter from Owensboro to Catlettsburg, Ohio (266 miles).
  18. Arbuckle NGL Pipeline
    • OneOK
    • Expansion - Completed - Q2 - 2012 - Arbuckle I Pipeline expansion
    • 440 miles, 16 inch
    • NGLs - 60,000 bpd
    • Capacity increased from 180,000 b/d to 240,000 b/d of unfractionated natural gas liquids as a result of additional pump stations.
  19. Great Salt Plains Crude Oil Pipeline
    • Parnon Gathering
    • New - Completed - Q4 -2012
    • 115 miles, 8 inch
    • Crude - 20,000 bpd
    • Goes from Cherokee to Cushing (both Oklahoma) .
  20. Bakken North Project Plains All American New Completed 2012 Q4 80 12 CRD 50,000 New construction from Trenton, North Dakota, to Sheridan County, Montana, near the Montana-Saskatchewan border. Volumes are delivered to the existing Poplar Pipeline, which connects to the Wascana Pipeline in Saskatchewan. The Canadian Wascana Pipeline was reversed as part of this project so that crude volumes from the Bakken play are ultimately delivered to Regina in Saskatchewan.
  21. Basin Oil Pipeline
    • Plains All American
    • Expansion - Completed - 2012
    • 520 miles, 24,22 & 20 inch
    • Crude - 50,000 bpd
    • Segment from Wink/Hendrick Texas, to Midland, Texas, had its capacity increased from 144,000 b/d to 240,000 b/d. Segment from Colorado City, Texas, to Cushing, Oklahoma, had its capacity increased from 400,000 b/d to 450,000 b/d.
  22. Overland Pass NGL Pipeline
    • Williams; OneOK Expansion
    • Pipeline expansion 2 - Completed - Q3 - 2012
    • 1035 miles, 16 & 24 inch
    • NGLs - 30,000 bpd
    • Pump stations added in Q1 2012 and Q3 2012; capacity increased to 160,000 b/d and 175,000 b/d, respectively, up from 145,000 b/d.
  23. Texas Express NGL Oil Pipeline
    • Anadarko; ArcLight; DCP Midstream; Enterprise Products Partners
    • New - Completed - Q4 - 2013
    • 580 miles, 20 inch
    • NGLs - 280,000 bpd
    • Includes gathering system into Anadarko and Barnett basins. Captures volumes from Front Range and Mid-American Pipeline.
  24. Sand Hills NGL Pipeline
    • DCP Midstream; Enbridge; Phillips 66
    • New Completed - Q2 - 2013
    • 720 miles, 20 inch
    • NGLs - 200,000 bpd
    • Natural gas liquids pipeline providing takeaway service from DCP Midstream, LLC and third-party plants in the Permian and the Eagle Ford to fractionation facilities along the Texas Gulf Coast and the Mont Belvieu market hub.
  25. Southern Hills Pipeline
    • DCP Midstream; Enbridge; Phillips 66
    • New - Completed - Q2 - 2013
    • 800 miles - 20–8 inches - HGL - Y-grade - 150,000 bpd
    • Was still ramping up to full capacity in April 2014, as pump stations were being completed.
  26. Seaway Crude Oil Pipeline
    • Seaway Pipeline expansion
    • Enbridge; Enterprise Products Partners
    • Expansion - Completed - Q1 - 2013
    • 500 miles - 30 inches - Crude - 250,000 bpd
    • Capacity increased from 150,000 b/d to 400,000 b/d as a result of pump station additions and other modifications.
  27. Lone Star West Texas Gateway NGL Pipeline
    • Energy Transfer Partners
    • New Completed - Q1 - 2013
    • 570 miles, 16 inch
    • NGLs - 220,000 bpd
    • Originating in Winkler County, Texas, and terminating in Jackson County, Texas.
  28. Permian Express 1 Pipeline Energy Transfer Partners, ExxonMobil (Permian Express Partners JV) New Completed 2013 Q2 CRD 90,000
  29. Cajun-Sibon NGL Pipeline System - Phase I Expansion
    • EnLink
    • Expansion - Completed - Q4 - 2013
    • 139 miles - 12 inches - HGL - Y-grade - 70,000 bpd
  30. Double Eagle Pipeline Kinder Morgan; Magellan New Completed 2013 Q2 194 16, 14, 12 CRD 100,000 140 miles of new (12-inch diameter) pipeline connected to 50 miles of existing (16- and 14-inch diameter) pipeline. Expandable to 150,000 b/d. One segment goes from Gardendale, Texas, to Three Rivers, Texas. Another segment goes from Three Rivers to northern Karnes County, Texas. A third segment goes from Three Rivers to Corpus Christi, Texas. A 10-mile (12-inch diameter) lateral was completed in Q1 2015 that connects the Double Eagle Pipeline to the Kinder Morgan Crude and Condensate (KMCC) Pipeline in Kernes County.
  31. Longhorn Pipeline reversal and conversion Magellan Conversion, Reversal Completed 2013 Q2 450 18 CRD 225,000 Converted to crude from carrying refined products, and also reversed. Goes from Crane to Houston (both in Texas).
  32. Bakken NGL Pipeline
    • OneOK
    • New - Completed - Q2 - 2013
    • 600 miles, 12 inch
    • NGLs - 60,000 bpd
  33. Sterling NGL Pipeline
    • Sterling I conversion
    • OneOK
    • Conversion - Completed - Q4 - 2013
    • HGL - Propane, butanes, Y-grade
    • Reconfiguration of Sterling I pipeline such that it can carry both mixed and purity natural gas liquids (instead of just purity products).
  34. Mississippian Lime Crude Oil Pipeline Project Plains All American New Completed 2013 Q3 135 CRD 175,000 Goes from Byron to Cushing (both in Oklahoma).
  35. Zydeco Pipeline reversal Shell Midstream Partners Reversal Completed 2013 Q4 350 24, 22, 20 CRD 360,000 Reversal of the 250,000 b/d Houston, Texas, to Port Neches, Texas, segment (20-inch diameter, 87 miles) so it now flows east. Reversal of the 360,000 b/d Port Neches, Texas, to Houma, Louisiana, segment (22-inch diameter, 213 miles) so it now flows east. The 260,000 b/d Houma to Saint James, Louisiana, segment (18-inch diameter, 48 miles) remained flowing north. Reversal of the 400,000 b/d Houma to Clovelly segment (24-inch diameter, 34 miles) so it now flows east. The 125,000 b/d segment from the offshore Boxer pipeline system to Houma (16-inch diameter) remained flowing north.
  36. Overland Pass NGL Pipeline
    • Williams; OneOK
    • Expansion - Completed - Q2 - 2013
    • 1035 miles, 16 & 24 inch
    • NGLs - 70,000 bpd
    • Capacity increased from 175,000 b/d to 245,000 b/d to accommodate Bakken NGL pipeline deliveries. Five pump stations added, with some in service during Q1 2013.
  37. Front Range NGL Pipeline
    • Anadarko, DCP Midstream, Enterprise Products Partners (Front Range Pipeline JV)
    • New - Completed - Q1 - 2014
    • 435 miles, 16 inch
    • NGLs - 150,000 bpd
    • Pipeline originates in Weld County, Colorado, and terminates in Skellytown, Texas. There, it can connect with the Mid-America Pipeline or the Texas Express Pipeline, with Mont Belvieu in Texas as the final destination for the natural gas plant liquid mix.
  38. Bakken Oil Express (BOE) II Pipeline BOE Midstream New Completed 2014 Q3 38 16 CRD 165,000 Flows from Kildeer to a rail terminal west of Dickinson (both in North Dakota).
  39. Cline Shale Pipeline Centurion Pipeline New Completed 2014 Q2 91 12 CRD 75,000 Goes from near Barnhart to near Colorado City (both in Texas), where it connects to the Centurion and BridgeTex pipelines.
  40. Southern Hills Pipeline - expansion 1
    • DCP Midstream; Enbridge; Phillips 66 Expansion
    • Completed - Q4 - 2014
    • 140 miles - 20–8 inches - HGL - Y-grade - 25,000 bpd
    • Capacity increased from 150,000 b/d to 175,000 b/d.
  41. Alberta Clipper Pipeline (Line 67) pump upgrade phase 1—Canada Enbridge Expansion Completed 2014 Q3 786 36 CRD 120,000 Line 67 goes from Alberta, Canada to Wisconsin. Upgrading of pumps brought Canadian capacity up from 450,000 b/d to 570,000 b/d (north of the 3-mile segment in North Dakota that connects the U.S. and Canadian pipeline).
  42. Alberta Clipper Pipeline (Line 67) pump upgrade phase 1—United States Enbridge Expansion Completed 2014 Q3 323 36 CRD 120,000 Line 67 goes from Alberta, Canada to Wisconsin. Upgrading of pumps brought U.S. capacity up from 450,000 b/d to 570,000 b/d (south of the 3-mile segment in North Dakota that connects the U.S. and Canadian pipeline).
  43. Southern Access (Line 61) Upgrade Project expansion 1 Enbridge Expansion Completed 2014 Q3 454 42 CRD 160,000 Capacity increased from 400,000 b/d to 560,000 b/d as a result of additional pumping horsepower.
  44. Flanagan South Pipeline Enbridge New Completed 2014 Q4 593 36 CRD 585,000 Goes from Enbridge's Flanagan Terminal near Pontiac, Illinois, to Cushing, Oklahoma.
  45. Seaway Pipeline twin/loop Enbridge; Enterprise Products Partners Expansion Completed 2014 Q4 512 30 CRD 450,000 Construction of a loop/twin pipeline, mostly along the same route as the existing Seaway Pipeline.
  46. Mariner West conversion Energy Transfer Partners Conversion Completed 2014 Q1 350 10, 8 HGL Ethane 50,000 Converted from product pipeline to carry only HGL.
  47. Rio Bravo Pipeline Energy Transfer Partners Conversion Completed 2014 Q3 84 CRD 100,000 Converted from natural gas.
  48. Mariner East 1 conversion Energy Transfer Partners Conversion Completed 2014 Q4 300 12, 8 HGL Ethane, propane 70,000 Converted products pipeline to carry only HGL. Initially delivered propane; began shipping ethane in Q1 2016. 51 miles of 12-inch line to connect 8-inch repurposed products line to Houston, Pennsylvania.
  49. Permian Express 1 expansion Energy Transfer Partners, ExxonMobil (Permian Express Partners JV) Expansion Completed 2014 Q1 CRD 60,000 Capacity increased from 90,000 b/d to 150,000 b/d.
  50. Cajun-Sibon NGL Pipeline System - Phase II
    • EnLink
    • Expansion - Completed - Q4 - 2014
    • 306 miles - 12 inches - HGL - Y-grade, butanes - 50,000 bpd
    • Capacity increased from 70,000 b/d to 120,000 b/d as a result of adding pumps.
  51. Appalachia to Texas Express (ATEX) Pipeline Enterprise Products Partners New Completed 2014 Q1 1,205 20, 16, 14 HGL Ethane 125,000 Includes 369 miles of new 20-inch pipe, with remainder composed of 14-inch repurposed TE Products Pipeline pipe.
  52. Mid-American Pipeline—Rocky Mountain expansion Enterprise Products Partners Expansion Completed 2014 Q2 264 16 HGL Y-grade 75,000 Capacity increased from 275,000 b/d to 350,000 b/d. Pipeline and pump modifications made to accommodate 10-year ship-or-pay commitments on Mid-American Pipeline to Hobbs, Texas.
  53. Aegis Ethane Pipeline—Mont Belvieu to Beaumont Enterprise Products Partners New Completed 2014 Q3 60 20 HGL Ethane 360,000 Whole pipeline goes from Mont Belvieu, Texas, to Napoleonville, Louisiana. This is the first segment.
  54. Cochin Condensate Pipeline
    • Cochin Reversal Project
    • Kinder Morgan
    • Expansion - Completed - Q3 - 2014
    • 1,900 miles - 12 inches - HGL - Natural gasoline - 95,000 bpd
    • Reversed segment has capacity of 95,000 b/d. The full pipeline stretches from Alberta, Canada, through the United States, then back into Canada at the Michigan-Ontario border. The reversal was intially for only part of the pipeline, from Kankakee, Illinois to Fort Saskatchewan, Alberta, Canada. Later a short section to Saint Anne, Illinois was reactivated to allow for interconnect with MPLX, sourcing diluent from eastern Ohio through the Cornerstone project.
  55. Longhorn Pipeline expansion Magellan Expansion Completed 2014 18 CRD 50,000 Capacity increased from 225,000 b/d to 275,000 b/d. New origin point added in Barnhart, Texas (in addition to the Crane, Texas, origin). Goes to Houston.
  56. BridgeTex Oil Pipeline
    • Magellan; Occidental Petroleum
    • New - Completed - Q3 - 2014
    • 400 miles - Crude - 300,000 bpd
    • Goes from Colorado City to East Houston (both in Texas). Plains All American bought out Occidental's share of the project.
  57. South Texas Crude Oil Pipeline System expansion phase 1 NuStar Expansion Completed 2014 Q2 CRD 35,000 Capacity increased from 240,000 b/d to 275,000 b/d between Gardendale and Corpus Christi (both in Texas).
  58. OneOK ethane header interconnection OneOK New Completed 2014 Q2 285 12 HGL Ethane 40,000 A new interconnection point between OneOK's Mont Belvieu, Texas, natural gas liquid facilities and several customers in the region.
  59. Sterling NGL Pipeline
    • Sterling III Pipeline
    • OneOK
    • New - Completed - Q2 - 2014
    • 550 miles - 16 inches - HGL - Y-grade - 190,000 bpd
  60. Sterling NGL Pipeline
  61. Sterling II conversion
    • OneOK
    • Conversion - Completed - Q3 - 2014
    • HGL - Y-grade
    • Reconfiguration of Sterling II pipeline such that it can carry both mixed and purity natural gas liquids (instead of just purity).
  62. Bakken NGL Pipeline
    • OneOK
    • Expansion - Completed - Q4 - 2014
    • 600 miles, 12 inch
    • NGLs - 75,000 bpd
    • Capacity increased from 60,000 b/d to 135,000 b/d through installation of additional pumping.
  63. Mississippian Lime Crude Oil extension Plains All American Expansion Completed 2014 55 CRD 75,000 Extension of Mississippian Lime Pipeline, with capacity of 75,000 b/d, from Coldwater, Kansas, to Byron, Oklahoma.
  64. Wascana Pipeline reversal Plains Midstream Canada Reversal Completed 2014 Q2 107 12 CRD 40,000 Reversed the existing 40,000 b/d Wascana pipeline so that it flows north from the Saskatchewan-Montana border. Reversal done in coordination with the construction of the Bakken North Project, which connects to the Poplar Pipeline in Montana that in turn flows crude over the border onto the Wascana pipeline.
  65. White Cliffs Pipeline
    • SemGroup
    • Expansion
    • Completed
    • 2014 Q3
    • 527 12
    • CRD
    • 74,000
    • Addition of second, parallel pipeline brought total capacity up to about 150,000 b/d from 76,000 b/d. SemGroup bought Rose Rock Midstream in 2016, and is now the project operator.
  66. Glass Mountain Pipeline SemGroup; Gavilon New Completed 2014 Q1 210 CRD 140,000 Flows from western Oklahoma to Cushing, Oklahoma.
  67. Mars Pipeline expansion Shell Midstream Partners; BP Expansion Completed 2014 Q1 41 18, 16 CRD 100,000 New 100,000 b/d segment from Olympus platform to West Delta 143 platform (both in the Gulf of Mexico).
  68. Granite Wash Extension Sunoco Logistics Partners New Completed 2014 Q4 200 12 CRD 70,000 Begins in Texas, goes through Oklahoma, then ends in Texas.
  69. Eaglebine Express Pipeline Sunoco Logistics Partners Conversion, Expansion, Reversal Completed 2014 12 CRD 60,000 Pipeline goes from Hearne to Aldine to Nederland (all in Texas). Pipeline is a conversion and reversal of the old MagTex (which carried refined petroleum products) product pipeline. The last five miles to Nederland are new construction.
  70. Pony Express Pipeline Tallgrass Energy Conversion, Expansion Completed 2014 760 CRD 320,000 Converted a natural gas pipeline and extended it. Capacity from Guernsey, Wyoming, to Sterling, Colorado, is 230,000 b/d. Capacity from Sterling, Colorado, to Cushing, Oklahoma is 320,000 b/d. Starting in 2015, the Colorado lateral (capacity 90,000 b/d) interconnects with the main line at Sterling, Colorado.
  71. Keystone Gulf Coast Expansion TC Energy Expansion Completed 2014 Q2 485 36 CRD 700,000 Extension of Keystone Pipeline that goes from Cushing, Oklahoma, to refineries in Port Arthur, Texas. Expandable to 830,000 b/d.
  72. Vantage Pipeline Vantage Pipeline Canada New Completed 2014 Q2 435 10 HGL Ethane 40,000