Difference between revisions of "Sepia Oil Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
(20 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
=== Summary Information === | === Summary Information === | ||
− | * Operator: | + | * Operator: Petrobras |
− | * Country: | + | * Country: Brazil |
− | * Location: | + | * Location: Santos Basin |
− | * Production start: | + | * Production start: 2021 |
− | * Partners: | + | * Partners: PETRONAS (21%), Petrobras (30%), TotalEnergies (28%) and QatarEnergy (21%). |
* Type: Oil / Gas | * Type: Oil / Gas | ||
* Estimated Reserves: | * Estimated Reserves: | ||
− | * Production Volume: | + | * Production Volume: 170,000 bpd (2022) |
=== Description === | === Description === | ||
− | * [[Carioca FPSO MV30]] | + | * The Sépia Leste field is at approximately 250 km and the Sépia field 185 km from the coast of Rio de Janeiro state, at a depth of 2,165 meters. |
+ | * The permanent development utilises the [[Carioca FPSO MV30]] but an early production system used [[Cidade de São Vicente FPSO]] | ||
+ | * A total of 15 wells are planned, but the first phase includes seven-riser wells (3 producers and 4 injector wells) | ||
=== Contractors === | === Contractors === | ||
− | * - | + | * '''MODEC:''' Engineering, procurement, construction, mobilization and installation of the FPSO, including topsides processing equipment as well as hull and marine systems. |
+ | * '''Sofec''' designed and provided the spread mooring system | ||
+ | * '''McDermott''' Detailed engineering, surveys, supply, installation and pre-commissioning of rigid pipelines, jumpers, buoyance modules, strakes and riser monitoring systems for seven-riser wells (3 producers and 4 injector wells) connected to the Carioca FPSO MV30 | ||
=== History === | === History === | ||
+ | * 2014 - The Sépia field was declared commercially viable | ||
+ | * 2015 - The Sépia Leste field was declared commercially viable | ||
+ | * 2016 - Early production system produces oil for 180 days | ||
+ | * 2017 - Modec awarded FPSO contract | ||
* 2021 - First oil produced | * 2021 - First oil produced | ||
+ | * 2021 - Petronas becomes 21% shareholder and Qatarenergy 14.4% owner | ||
+ | * 2022 - New oil discovery made in the field | ||
=== Geology === | === Geology === | ||
− | * | + | * The field is located in the pre-salt |
=== Links === | === Links === | ||
+ | # [https://abarrelfull.blogspot.com/2021/12/declaration-of-commercial-viability-of.html Declaration of the Commercial Viability of the Sépia Leste area, in the pre-salt layer of the Santos Basin] | ||
+ | # [https://abarrelfull.blogspot.com/2021/12/early-production-system-starts-up-in.html Early Production System starts up in the Santos Basin's Sepia pre-salt] | ||
+ | # [https://abarrelfull.blogspot.com/2021/12/contracting-of-fpso-for-sepia-field.html Contracting of FPSO for Sepia field] | ||
+ | # [https://abarrelfull.blogspot.com/2021/12/mcdermott-awarded-epci-contract-by.html McDermott Awarded EPCI Contract by Petrobras for Sepia Field Project] | ||
# [https://abarrelfull.blogspot.com/2021/12/modecs-fpso-carioca-mv30-achieves-first.html MODEC’s FPSO Carioca MV30 achieves First Oil and starts 21-Year Time Charter] | # [https://abarrelfull.blogspot.com/2021/12/modecs-fpso-carioca-mv30-achieves-first.html MODEC’s FPSO Carioca MV30 achieves First Oil and starts 21-Year Time Charter] | ||
+ | # [https://a-barrel-full.blogspot.com/2021/12/petronas-wins-sepia-field-in-brazil-bid.html PETRONAS Wins Sépia Field In Brazil Bid Round] | ||
+ | # [https://a-barrel-full.blogspot.com/2022/11/qatarenergy-announces-hydrocarbon.html Qatarenergy announces hydrocarbon discovery in Brazil’s Sépia field] | ||
Revision as of 14:47, 26 November 2022
Summary Information
- Operator: Petrobras
- Country: Brazil
- Location: Santos Basin
- Production start: 2021
- Partners: PETRONAS (21%), Petrobras (30%), TotalEnergies (28%) and QatarEnergy (21%).
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume: 170,000 bpd (2022)
Description
- The Sépia Leste field is at approximately 250 km and the Sépia field 185 km from the coast of Rio de Janeiro state, at a depth of 2,165 meters.
- The permanent development utilises the Carioca FPSO MV30 but an early production system used Cidade de São Vicente FPSO
- A total of 15 wells are planned, but the first phase includes seven-riser wells (3 producers and 4 injector wells)
Contractors
- MODEC: Engineering, procurement, construction, mobilization and installation of the FPSO, including topsides processing equipment as well as hull and marine systems.
- Sofec designed and provided the spread mooring system
- McDermott Detailed engineering, surveys, supply, installation and pre-commissioning of rigid pipelines, jumpers, buoyance modules, strakes and riser monitoring systems for seven-riser wells (3 producers and 4 injector wells) connected to the Carioca FPSO MV30
History
- 2014 - The Sépia field was declared commercially viable
- 2015 - The Sépia Leste field was declared commercially viable
- 2016 - Early production system produces oil for 180 days
- 2017 - Modec awarded FPSO contract
- 2021 - First oil produced
- 2021 - Petronas becomes 21% shareholder and Qatarenergy 14.4% owner
- 2022 - New oil discovery made in the field
Geology
- The field is located in the pre-salt
Links
- Declaration of the Commercial Viability of the Sépia Leste area, in the pre-salt layer of the Santos Basin
- Early Production System starts up in the Santos Basin's Sepia pre-salt
- Contracting of FPSO for Sepia field
- McDermott Awarded EPCI Contract by Petrobras for Sepia Field Project
- MODEC’s FPSO Carioca MV30 achieves First Oil and starts 21-Year Time Charter
- PETRONAS Wins Sépia Field In Brazil Bid Round
- Qatarenergy announces hydrocarbon discovery in Brazil’s Sépia field