* The permanent development utilises the [[Carioca FPSO MV30]] but an early production system used [[Cidade de São Vicente FPSO]] | * The permanent development utilises the [[Carioca FPSO MV30]] but an early production system used [[Cidade de São Vicente FPSO]] | ||
* A total of 15 wells are planned, but the first phase includes seven-riser wells (3 producers and 4 injector wells) | * A total of 15 wells are planned, but the first phase includes seven-riser wells (3 producers and 4 injector wells) | ||
− | * The [[P-85 FPSO]] will be added to the field in 2028 | + | * The [[P-85 FPSO]] will be added to the field in 2028 as part of the phase 2 development |
=== Contractors === | === Contractors === | ||
Line 19: | Line 19: | ||
* '''Sofec''' designed and provided the spread mooring system | * '''Sofec''' designed and provided the spread mooring system | ||
* '''McDermott''' Detailed engineering, surveys, supply, installation and pre-commissioning of rigid pipelines, jumpers, buoyance modules, strakes and riser monitoring systems for seven-riser wells (3 producers and 4 injector wells) connected to the Carioca FPSO MV30 | * '''McDermott''' Detailed engineering, surveys, supply, installation and pre-commissioning of rigid pipelines, jumpers, buoyance modules, strakes and riser monitoring systems for seven-riser wells (3 producers and 4 injector wells) connected to the Carioca FPSO MV30 | ||
+ | ==== Phase 2 ==== | ||
+ | * '''Seatrium:''' EPC for FPSO | ||
=== History === | === History === | ||
Line 28: | Line 30: | ||
* 2021 - Petronas becomes 21% shareholder and Qatarenergy 14.4% owner | * 2021 - Petronas becomes 21% shareholder and Qatarenergy 14.4% owner | ||
* 2022 - New oil discovery made in the field | * 2022 - New oil discovery made in the field | ||
+ | * 2024 - FID for second phase development | ||
=== Geology === | === Geology === | ||
Line 41: | Line 44: | ||
# [https://a-barrel-full.blogspot.com/2022/11/qatarenergy-announces-hydrocarbon.html Qatarenergy announces hydrocarbon discovery in Brazil’s Sépia field] | # [https://a-barrel-full.blogspot.com/2022/11/qatarenergy-announces-hydrocarbon.html Qatarenergy announces hydrocarbon discovery in Brazil’s Sépia field] | ||
# [https://abarrelfull.blogspot.com/2024/05/brazil-totalenergies-expands-its-pre.html Brazil: TotalEnergies expands its pre-salt footprint on giant low-cost and low emissions reserves] | # [https://abarrelfull.blogspot.com/2024/05/brazil-totalenergies-expands-its-pre.html Brazil: TotalEnergies expands its pre-salt footprint on giant low-cost and low emissions reserves] | ||
+ | # [https://abarrelfull.blogspot.com/2024/05/petrobras-on-p-84-and-p-85-contracting.html Petrobras on P-84 and P-85 contracting process] | ||
+ | # [https://a-barrel-full.blogspot.com/2024/05/qatarenergy-announces-fid-in-second.html Qatarenergy Announces FID In the Second Development Phase For Brazil’s Sépia Field] | ||
[[category:Field]] | [[category:Field]] | ||
[[category:Brazil]] | [[category:Brazil]] | ||
[[category:Petrobras]] | [[category:Petrobras]] | ||
+ | [[category:Qatarenergy]] |
Latest revision as of 06:27, 28 May 2024
Summary Information
- Operator: Petrobras
- Country: Brazil
- Location: Santos Basin
- Production start: 2021
- Partners: PETRONAS (21%), Petrobras (30%), TotalEnergies (28%) and QatarEnergy (21%).
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume: 170,000 bpd (2022)
Description
- The Sépia Leste field is at approximately 250 km and the Sépia field 185 km from the coast of Rio de Janeiro state, at a depth of 2,165 meters.
- The permanent development utilises the Carioca FPSO MV30 but an early production system used Cidade de São Vicente FPSO
- A total of 15 wells are planned, but the first phase includes seven-riser wells (3 producers and 4 injector wells)
- The P-85 FPSO will be added to the field in 2028 as part of the phase 2 development
Contractors
- MODEC: Engineering, procurement, construction, mobilization and installation of the FPSO, including topsides processing equipment as well as hull and marine systems.
- Sofec designed and provided the spread mooring system
- McDermott Detailed engineering, surveys, supply, installation and pre-commissioning of rigid pipelines, jumpers, buoyance modules, strakes and riser monitoring systems for seven-riser wells (3 producers and 4 injector wells) connected to the Carioca FPSO MV30
Phase 2
- Seatrium: EPC for FPSO
History
- 2014 - The Sépia field was declared commercially viable
- 2015 - The Sépia Leste field was declared commercially viable
- 2016 - Early production system produces oil for 180 days
- 2017 - Modec awarded FPSO contract
- 2021 - First oil produced
- 2021 - Petronas becomes 21% shareholder and Qatarenergy 14.4% owner
- 2022 - New oil discovery made in the field
- 2024 - FID for second phase development
Geology
- The field is located in the pre-salt
Links
- Declaration of the Commercial Viability of the Sépia Leste area, in the pre-salt layer of the Santos Basin
- Early Production System starts up in the Santos Basin's Sepia pre-salt
- Contracting of FPSO for Sepia field
- McDermott Awarded EPCI Contract by Petrobras for Sepia Field Project
- MODEC’s FPSO Carioca MV30 achieves First Oil and starts 21-Year Time Charter
- PETRONAS Wins Sépia Field In Brazil Bid Round
- Qatarenergy announces hydrocarbon discovery in Brazil’s Sépia field
- Brazil: TotalEnergies expands its pre-salt footprint on giant low-cost and low emissions reserves
- Petrobras on P-84 and P-85 contracting process
- Qatarenergy Announces FID In the Second Development Phase For Brazil’s Sépia Field