(Created page with "+++ Turn Key # **[[[Sannazzaro De Burgondi Refinery]]]** * Italy * ENI S.p.a Div. R&M * New Vacum Column & Automatic Filtration System on the existing FCC Plant * 11.00...")
 
Line 1: Line 1:
+++ Turn Key
+
== Turn Key ===
 
+
* '''[[Sannazzaro De Burgondi Refinery]]'''
# **[[[Sannazzaro De Burgondi Refinery]]]**
+
** Italy
* Italy
+
** ENI S.p.a Div. R&M  
* ENI S.p.a Div. R&M  
+
** New Vacum Column & Automatic Filtration System on the existing FCC Plant  
* New Vacum Column & Automatic Filtration System on the existing FCC Plant  
+
** 11.000.000
* 11.000.000
+
** 2011 -in progress
* 2011 -in progress
+
* '''[[Taranto Refinery]]'''
# **[[[Taranto Refinery]]]**
 
 
  * Italy
 
  * Italy
 
  * ENI S.p.a Div. R&M  
 
  * ENI S.p.a Div. R&M  
Line 13: Line 12:
 
  * 1.100.000  
 
  * 1.100.000  
 
  * 2010
 
  * 2010
# **[[[Sannazzaro De Burgondi Refinery]]]**
+
* '''[[Sannazzaro De Burgondi Refinery]]'''
 
  * Italy
 
  * Italy
 
  * ENI S.p.a Div. R&M  
 
  * ENI S.p.a Div. R&M  
Line 24: Line 23:
 
System in Sarroch Petrochemical Complex  
 
System in Sarroch Petrochemical Complex  
 
6.000.000 2007-2008
 
6.000.000 2007-2008
# **[[[Milazzo Refinery]]]**
+
* '''[[Milazzo Refinery]]'''
 
  * Italy
 
  * Italy
 
  * ENI S.p.a Div. R&M  
 
  * ENI S.p.a Div. R&M  
Line 30: Line 29:
 
  * 2.800.000
 
  * 2.800.000
 
  * 2007
 
  * 2007
# **[[[Milazzo Refinery]]]**
+
* '''[[Milazzo Refinery]]'''
 
  * Italy
 
  * Italy
 
  * ENI S.p.a Div. R&M  
 
  * ENI S.p.a Div. R&M  
Line 44: Line 43:
 
3.800.000 2000
 
3.800.000 2000
  
+++ Engineering
+
=== Engineering ===
 
 
  
# **[[[Milazzo Refinery]]]**
+
* '''[[Milazzo Refinery]]'''
* Italy
+
** Italy
* ENI S.p.a Div. R&M  
+
** ENI S.p.a Div. R&M  
* KEROSENE DESULPHURIZATION UNIT
+
** KEROSENE DESULPHURIZATION UNIT
* Front End Engineering Design for Revamping of HDS1 Unit / Raffineria di Milazzo
+
** Front End Engineering Design for Revamping of HDS1 Unit / Raffineria di Milazzo
* 10.000
+
** 10.000
* 2013
+
** 2013
 +
* '''[[Leghorn Livorno Refinery]]'''
 
TREATED  
 
TREATED  
 
DEASPHALTED  
 
DEASPHALTED  
Line 103: Line 102:
 
WATER INJECTION SYSTEM , POWER GENERATION PLANT & UTILITY PACKAGES
 
WATER INJECTION SYSTEM , POWER GENERATION PLANT & UTILITY PACKAGES
  
# **[[[Elephant Oil Field]]]**
+
* '''[[Elephant Oil Field]]'''
 
  * Libya
 
  * Libya
 
  * ENI Oil Co. Ltd
 
  * ENI Oil Co. Ltd

Revision as of 14:05, 24 March 2020

Turn Key =

* Italy
* ENI S.p.a Div. R&M 
* Liquid Sulfur Transferline from Refinery Storage to Unit producing Solid Chips
* 1.100.000 
* 2010
* Italy
* ENI S.p.a Div. R&M 
* C4 Butylene Stream Dryer Package: Engineering, Material Supply and Construction up to Pre-commissioning 
* 8.500.000 
* 2008-2009

POLIMERI EUROPA W.W.T. Covering System and Hydrocarbon Separation Unit by Cryogenic Condensation System in Sarroch Petrochemical Complex 6.000.000 2007-2008

* Italy
* ENI S.p.a Div. R&M 
* Marine Loading Arms revamping & replacement on Pier 2 – Mooring 06 bis of the Milazzo Refinery
* 2.800.000
* 2007
* Italy
* ENI S.p.a Div. R&M 
* Pier 2-Marine Loading Arms revamping: n.4x16” loading arms dismantling and replacement of the Milazzo Refinery Terminal
* 3.000.000
* 2005

RAFFINERIA DI GELA New Instrumentation System (DCS) for Waste Water Treatment Unit of the Gela Refinery 1.400.000 2004 AGIP GAS Railway Loading Arms extension for GPL storage and supply of underground tanks for the Livorno Storage Facilities 3.800.000 2000

Engineering

TREATED DEASPHALTED AROMATIC EXTRACT Extended Basic Design Package for a New TDAE Unit / ENI R&M Div., Livorno Refinery (Italy) 10.000 2013 W.W.T. for Water Re-use Multidiscipline Engineering Design for a New Waste Water Treatment Package / ENI S.p.A. Div. R&M 18,000 2011-2012 OFFSHORE PLATFORMS Front End Engineering Design for n° 3 new gas platforms located offshore Adriatic Sea (Italy) and the relevant +/- 15% Cost Estimate /ENI S.p.a E&P Div. 50.000 2010-2011 COMBINED HEAT & POWER PLANT Front End Engineering Design, +/- 15% Cost Estimate and preparation of EPC Tender Documents for Power Plant Revamping located in Bolgiano, San Donato Milanese (Italy) / ENIPOWER. 18.000 2010 RESIDUE HYDROCRACKER Multidiscipline Engineering Design of EST Project- ENI R&M Div. in Sannazzaro Refinery in Italy / SAIPEM S.p.A. 220.000 2009-2012 AMMONIA PLANT/ UTILITY UNITS Multidiscipline Engineering Design of QAFCO5 Project in Qatar/SAIPEM S.p.A. 170.000 2008

OFFSHORE AND MARINE TERMINALS Conceptual Design, Basic Design & FEED for Trans-anatolian Pipeline , Samsun and Cehyan Marine Terminal Oil Storage Facilities in Turkey/ SNAMPROGETTI S.p.A. 90.000 2006-2007

WATER INJECTION SYSTEM , POWER GENERATION PLANT & UTILITY PACKAGES

* Libya
* ENI Oil Co. Ltd
* Water Injection System & Power Generation Plant Multidiscipline Engineering Design and ITB for EPC of the Elephant Oil Field at the Murzuk Basin
* 25.000
* 2005

HYDROFINISHING UNIT & OFFSITE REVAMPING Multidisciplinary Engineering Design of the Lubricants Re-refining Plant -Lodi (Italy)/ VISCOLUBE S.p.A. 50.000 2003