SIMECO Refining References

From A Barrel Full
Jump to navigation Jump to search

Turn Key

  • Sannazzaro de Burgondi Refinery
    • Italy
    • ENI S.p.a Div. R&M
    • New Vacum Column & Automatic Filtration System on the existing FCC Plant
    • 11.000.000
    • 2011 -in progress
  • Taranto Refinery
    • Italy
    • ENI S.p.a Div. R&M
    • Liquid Sulfur Transferline from Refinery Storage to Unit producing Solid Chips
    • 1.100.000
    • 2010
  • Sannazzaro de Burgondi Refinery
    • Italy
    • ENI S.p.a Div. R&M
    • C4 Butylene Stream Dryer Package: Engineering, Material Supply and Construction up to Pre-commissioning
    • 8.500.000
    • 2008-2009
  • Sarroch Refinery
    • Italy
    • POLIMERI EUROPA
    • W.W.T. Covering System and Hydrocarbon Separation Unit by Cryogenic Condensation System in Sarroch Petrochemical Complex
    • 6.000.000
    • 2007-2008
  • Milazzo Refinery
    • Italy
    • ENI S.p.a Div. R&M
    • Marine Loading Arms revamping & replacement on Pier 2 – Mooring 06 bis of the Milazzo Refinery
    • 2.800.000
    • 2007
  • Milazzo Refinery
    • Italy
    • ENI S.p.a Div. R&M
    • Pier 2-Marine Loading Arms revamping: n.4x16” loading arms dismantling and replacement of the Milazzo Refinery Terminal
    • 3.000.000
    • 2005
  • Gela Refinery
    • Italy
    • New Instrumentation System (DCS) for Waste Water Treatment Unit
    • 1.400.000
    • 2004

AGIP GAS

Railway Loading Arms extension for GPL storage and supply of underground tanks for the Livorno Storage Facilities 3.800.000 2000

Engineering

TREATED DEASPHALTED AROMATIC EXTRACT Extended Basic Design Package for a New TDAE Unit / ENI R&M Div., Livorno Refinery (Italy) 10.000 2013 W.W.T. for Water Re-use Multidiscipline Engineering Design for a New Waste Water Treatment Package / ENI S.p.A. Div. R&M 18,000 2011-2012 OFFSHORE PLATFORMS Front End Engineering Design for n° 3 new gas platforms located offshore Adriatic Sea (Italy) and the relevant +/- 15% Cost Estimate /ENI S.p.a E&P Div. 50.000 2010-2011 COMBINED HEAT & POWER PLANT Front End Engineering Design, +/- 15% Cost Estimate and preparation of EPC Tender Documents for Power Plant Revamping located in Bolgiano, San Donato Milanese (Italy) / ENIPOWER. 18.000 2010 RESIDUE HYDROCRACKER Multidiscipline Engineering Design of EST Project- ENI R&M Div. in Sannazzaro Refinery in Italy / SAIPEM S.p.A. 220.000 2009-2012 AMMONIA PLANT/ UTILITY UNITS Multidiscipline Engineering Design of QAFCO5 Project in Qatar/SAIPEM S.p.A. 170.000 2008

OFFSHORE AND MARINE TERMINALS Conceptual Design, Basic Design & FEED for Trans-anatolian Pipeline , Samsun and Cehyan Marine Terminal Oil Storage Facilities in Turkey/ SNAMPROGETTI S.p.A. 90.000 2006-2007

WATER INJECTION SYSTEM , POWER GENERATION PLANT & UTILITY PACKAGES

* Libya
* ENI Oil Co. Ltd
* Water Injection System & Power Generation Plant Multidiscipline Engineering Design and ITB for EPC of the Elephant Oil Field at the Murzuk Basin
* 25.000
* 2005

HYDROFINISHING UNIT & OFFSITE REVAMPING Multidisciplinary Engineering Design of the Lubricants Re-refining Plant -Lodi (Italy)/ VISCOLUBE S.p.A. 50.000 2003