Difference between revisions of "Port Arthur LNG Export Terminal Project"

From A Barrel Full
Jump to navigation Jump to search
Line 25: Line 25:
 
=== History ===
 
=== History ===
 
* 2015 - Sempra Energy Submits For Pre-File Review With FERC
 
* 2015 - Sempra Energy Submits For Pre-File Review With FERC
 +
* 2020 - Bechtel signed and EPC contract for the project
  
 
=== Other Information ===
 
=== Other Information ===

Revision as of 08:55, 16 November 2021

Summary Information

  • Ownership: Sempra
  • Website: www.sempra.com
  • Location: Port Arthur, Texas, USA
  • Capacity: 10 million tons/annum
  • Status: Planned

Brief Description

  • The project was previously an import terminal, Port Arthur LNG Terminal
  • The proposed liquefaction project is designed to include: two natural gas liquefaction trains with a total export capability of approximately 10 million tons per annum, or 1.4 billion cubic feet per day; two 160,000-cubic-meter storage tanks; marine facilities for vessel berthing and loading; natural gas liquids and refrigerant storage; feed gas pre-treatment; truck loading and unloading areas; and combustion turbine generators for self-generation of electrical power.

Technical Details

  • Storage capacity: two 160,000-cubic-meter storage tanks
  • Constructor:
  • Licensor:

Ongoing Projects/Project Status

  • Commissioning is expected in 201X

Suppliers / Customers

  • Suppliers:
  • Customers:

History

  • 2015 - Sempra Energy Submits For Pre-File Review With FERC
  • 2020 - Bechtel signed and EPC contract for the project

Other Information

  • -

Links

  1. Sempra Energy Submits Port Arthur Liquefaction-Export Facilities For Pre-File Review With FERC
  2. Sempra LNG And Woodside Sign Memorandum Of Understanding For Potential Development Of Natural Gas Liquefaction Facility At Port Arthur, Texas
  3. Sempra Energy Subsidiary Port Arthur LNG and Bechtel Sign EPC Agreement