Difference between revisions of "P-85 FPSO"

From A Barrel Full
Jump to navigation Jump to search
 
Line 15: Line 15:
  
 
=== Contractors ===
 
=== Contractors ===
*  
+
* '''Seatrium:''' EPC
  
 
=== Status ===
 
=== Status ===
Line 22: Line 22:
 
=== History ===
 
=== History ===
 
* 2022 - Contracting process launched
 
* 2022 - Contracting process launched
 +
* 2024 - Seatrium awarded contract
  
 
=== Other Information ===
 
=== Other Information ===
Line 30: Line 31:
  
 
# [https://abarrelfull.blogspot.com/2024/05/petrobras-on-p-84-and-p-85-contracting.html Petrobras on P-84 and P-85 contracting process]
 
# [https://abarrelfull.blogspot.com/2024/05/petrobras-on-p-84-and-p-85-contracting.html Petrobras on P-84 and P-85 contracting process]
 +
# [https://a-barrel-full.blogspot.com/2024/05/seatrium-secures-fpso-newbuild.html Seatrium Secures FPSO Newbuild Contracts P-84 And P-85 From Petrobras]
  
 
[[Category:FSPO]]
 
[[Category:FSPO]]
 
[[Category:Brazil]]
 
[[Category:Brazil]]
 
[[Category:Petrobras]]
 
[[Category:Petrobras]]

Latest revision as of 06:26, 28 May 2024

Summary Information

  • Name: P-85 FPSO
  • Field: Sepia Oil Field
  • Country: Brazil
  • Ownership: Petrobras
  • Website:
  • Field Operated By: Petrobras
  • Capacity: 225,000 bpd
  • Year of Completion: 2028 (expected)

Brief Description

  • The vessel will have production capacity of 225 thousand barrels of oil and processing capacity of 10 million cubic meters of gas per day

Contractors

  • Seatrium: EPC

Status

  • Under construction

History

  • 2022 - Contracting process launched
  • 2024 - Seatrium awarded contract