=== Summary Information === | === Summary Information === | ||
− | * Ownership: | + | * Ownership: https://veniceenergy.com/ |
− | * Website: | + | * Website: Venice Energy |
− | * Location: | + | * Location: Outer Harbor, Adelaide |
* Capacity: million tons/annum | * Capacity: million tons/annum | ||
− | * Status: | + | * Status: Under construction |
+ | |||
=== Brief Description === | === Brief Description === | ||
* The terminal will consist of two new wharfs, a Floating Storage and Regasification Unit (FSRU) and connections to the [[Moomba to Adelaide Pipeline System (MAPS)]] and [[South-East Australia pipeline (SEAGAS)]] | * The terminal will consist of two new wharfs, a Floating Storage and Regasification Unit (FSRU) and connections to the [[Moomba to Adelaide Pipeline System (MAPS)]] and [[South-East Australia pipeline (SEAGAS)]] | ||
Line 16: | Line 17: | ||
* Send out capacity: | * Send out capacity: | ||
* Constructor: | * Constructor: | ||
+ | ** Austral Construction: Supply and installation of piles, concrete to build berthing and mooring infrastructure, internal roads and paving | ||
+ | ** GasLog: Provision of Floating Storage and Regasification Unit (FSRU) | ||
=== Ongoing Projects/Project Status === | === Ongoing Projects/Project Status === | ||
− | * Under construction | + | * Under construction, commisioning is expected in [[LNG Terminal Projects to be Completed in 2024 | 2024]] |
=== Suppliers / Customers === | === Suppliers / Customers === | ||
* Suppliers: | * Suppliers: | ||
− | * Customers: | + | * Customers: Venice will rent capacity at the terminal to local gas suppliers |
+ | |||
=== History === | === History === | ||
+ | * 2021 - Contracts signed for construction and vessel | ||
* 2021 - The South Australian Government approved the construction | * 2021 - The South Australian Government approved the construction | ||
Line 32: | Line 37: | ||
- | - | ||
=== Links === | === Links === | ||
+ | # [https://abarrelfull.blogspot.com/2022/01/outer-harbor-project-secures-leading.html Outer Harbor Project secures leading international LNG shipping partner] | ||
+ | # [https://abarrelfull.blogspot.com/2022/01/venice-signs-up-austral-construction.html Venice signs up Austral Construction for early contractor works] | ||
# [https://lng-news.blogspot.com/2022/01/lng-import-terminal-granted-development.html LNG import terminal granted development approval] | # [https://lng-news.blogspot.com/2022/01/lng-import-terminal-granted-development.html LNG import terminal granted development approval] |
Latest revision as of 14:25, 19 January 2022
Contents
Summary Information
- Ownership: https://veniceenergy.com/
- Website: Venice Energy
- Location: Outer Harbor, Adelaide
- Capacity: million tons/annum
- Status: Under construction
Brief Description
- The terminal will consist of two new wharfs, a Floating Storage and Regasification Unit (FSRU) and connections to the Moomba to Adelaide Pipeline System (MAPS) and South-East Australia pipeline (SEAGAS)
- The treminal will operate as a tolling facility
Technical Details
- Storage capacity:
- Unloading capacity:
- Send out capacity:
- Constructor:
- Austral Construction: Supply and installation of piles, concrete to build berthing and mooring infrastructure, internal roads and paving
- GasLog: Provision of Floating Storage and Regasification Unit (FSRU)
Ongoing Projects/Project Status
- Under construction, commisioning is expected in 2024
Suppliers / Customers
- Suppliers:
- Customers: Venice will rent capacity at the terminal to local gas suppliers
History
- 2021 - Contracts signed for construction and vessel
- 2021 - The South Australian Government approved the construction