Difference between revisions of "Noordgastransport NGT Gas Pipeline"

From A Barrel Full
Jump to navigation Jump to search
Line 16: Line 16:
 
+++ Related Gas Fields
 
+++ Related Gas Fields
 
* [[D15 Gas Fields]]
 
* [[D15 Gas Fields]]
* [[E17a and E17b Gas Fields]]
+
* [[E17A and E17B Gas Fields]]
 
* [[E18A Gas Fields]]
 
* [[E18A Gas Fields]]
 
* [[F16 Gas Fields]]
 
* [[F16 Gas Fields]]
* [[L10 And L11a Gas Fields]]
+
* [[L10 And L11A Gas Fields]]
 
* [[G14, G16 and G17 Gas Fields]]
 
* [[G14, G16 and G17 Gas Fields]]
  

Revision as of 20:39, 4 January 2023

Summary Information

+++ Details

  • With an extensive transportation system for natural gas on the Dutch continental shelf and a gas treatment station in Uithuizen, Noordgastransport B.V. (NGT) processes and supplies a substantial portion of the natural gas that is extracted from the Dutch continental shelf and beyond.
  • After treatment, the gas is delivered to the pipeline network of Gas Transport Services B.V., which manages the national gas transportation network.
  • In total Noordgastransport B.V. manages approximately 470 kilometers of pipelines with a daily gas transportation capacity of approximately 42 million Nm3.

+++ Related Gas Fields

+++ History

  • 1973 - Establishment Noordgastransport B.V.
  • 1974 - Commencement of the construction of the terminal near Uithuizen and the laying of the 36” pipeline from L10/L11 to the terminal.
  • 1975 - Production starts in the L10/L11 block, making the company operational.
  • 1977 - The first transportation and treatment of volumes for third parties.
  • 1984 - Laying of a 24” subsea lateral connector to the pipeline of L10/L11 that runs to the terminal, to be used for the Ameland field.
  • 1999 - Laying of a second 36” pipeline which runs from offshore block D15, close to the boundary of the British sector of the North Sea, along a distance of 140 km to the offshore L10/L11 block.
  • 2000 - GDF Suez acquires a stake from Transcanada
  • 2002 - Completion of another expansion upon the system: a 65-km long 18” pipeline that connects the G17d-A complex to the main transportation line.
  • 2005 - Production and transportation of natural gas produced by fields in the G14, G16, G17 and L6 blocks.
  • 2007 - First transportation and treatment of natural gas from the English continental shelf via D15.
  • 2013 - PensionDanmark acquired a 40% stake from TAQA

+++ Other Information

  • -

+++ Links

  1. History
  2. TransCanada Reaches Agreement to Sell Netherlands Assets
  3. TAQA, Pensiondanmark Agree On Sale Of Dutch Pipeline Stake