E18A Gas Fields
Jump to navigation
Jump to search
Summary Information
- Operator: Wintershall
- Country: Netherlands
- Location: E18a Offshore Licence
- Production start: 2009
- Partners: Total
- Type: Gas
- Estimated Reserves:
- Production Volume:
+++ Description
- Gas is produced from the E18-A satellite platform
- Gas is transported to the platform in the F16 Gas Fields for processing
- From here it is transported to shore via the Noordgastransport NGT Gas Pipeline
+++ Contractors
- **Heerema Marine Contractors:** Satellite Jacket Installation
- **KWsubsea:** Pipelines, 1 offshore 10" 13%Cr (5.3km) + 1 offshore 8" CS (16.7km)
+++ History
- 2008 - Total acquires 8% from Talisman
- 2009 - E18-A platform installed
- 2009 - First gas produced
- 2011 - Talisman acquires a share from Vattenfall
+++ Geology
+++ Links